Name Of Employee : FLORENDO B. PIEDAD
Home Address : Blk. 20 L5 Ruby St, PEA-2A, Langgam, San Pedro
Laguna, Philippines (4023)
Email Address : ********@*****.***/ ********@*****.***
Mobile /Contact no. : +639*********/ +639*********
PERSONAL DATA :
Date of Birth : April 10, 1976 Father’s Name : Cresencio D. Piedad (deceased)
Civil Status : Married Mother’s Name : Rosalia D. Baquirin
Citizenship : Filipino Person to be Contact incase of Emergency :
Height : 5 ft.& 6 inch. : Imelda F. Piedad / 090*-***-****
Weight : 140lbs. Address : Blk 20 L5 Ruby St., PEA-2A, Langgam, San
Religion : Roman Catholic San Pedro, Laguna, Philippines 4023
Language/ Dialect : Tagalog, English Name of Child: Cielo Marie F. Piedad (daughter)
Name of Spouse : Imelda F. Piedad
Occupation : Housewife
EDUCATIONAL ATTAINMENT:
Primary : San Isidro East Central School ( SIECS ) Date Graduated : SY 1985 - 1991
Secondary : San Isidro National High School (SINHS) Date Graduated : SY 1991 - 1995
Tertiary : Perpetual Help College of Laguna (PHCL) Undergraduated : SY 1995 - 1996
Course : Bachelor of Science in civil Engineering
Laguna Science and Technological College Date Graduated : SY 1998 -2000
(Formerly Laguna Technological Institute)
Course : 2- years Industrial Electronic Technology
On the Job Training : @ ROHM Philippines, PTC Carmona Cavite
: Testbox Assembly /Technician
: From Jan. 2000 - May, 2000 (5 months)
SEMINAR ATTENTED :
Subject : 1. Electro-Pneumatic – On February 18, 1998, at Metal Industry Research
and Development Center (MIRDC, Bicutan,Taguig City)
2. Programmable Logic Controller (PLC) on January 28, 2000 @ Metal
Industry Research and Development Center ( MIRDC), Bicutan, Taguig City
3. Construction Occupational Safety and Health (COSH -Held on Aug.31
September 01, 07, 08, 14, 2013 @ Leighton Contractor Phil. Inc.,City of Dreams
Former Belle Grande Hotels Casino Project at ASEANA, Paranaque City
4. Energy Management Audit Level 1 Training Course
On May 11, 2015 up to May 14, 2015 @ Schneider Electric Philippines inc., Head
Office, 24th Fort Legend Tower 3rd Ave. Cor., 31st, Fort Bonifacio
Global City, Taguig City
WORK HISTORY:
1. Position : Electrical Project In Charge (PIC)
Company : Altenative Power Solutions Inc. (APSI)
(an Affiliates of Total Powerbox Solutions Inc.)
Address : Partoza Compound, Southdrive St., San Antonio,
San Pedro Laguna
Employment Status : Regular (August 23, 2010 - Up to Present)
Job Descriptions:
Responsible to manages and coordinates for the project completion on time within the scope of works
Oversee all aspect of projects, set deadlines, monitor and summarize within the progress of project, prepare
reports for upper management regarding project status. All project responsibilities and supervisions are the
f ollowing scopes:
1. Layout and Installation of Electrical Equipments ( Panelboard ), Transformers, Panel switchgears
and Busways,wiring of power cables and controls (Automatic Transfer switch of Low Voltage Switch
gear, Motor Control Center ( Direct On Line, WYE Delta, Reverse Forward and Automatic Capacitor
Banks, Medium Voltages Switchgear PowerMetering.
2, Fabrication and installation of wireways (Cable trays), and Electrical conduits.
3, And Testing and Commissioning of Electrical Equipments.
HANDLED PROJECTS :
1 . VISTA RECTO,manila ( under LJ project ) - Supply & Installation of BUSDUCT 1600A & 1200A
From 2nd Floor @ Low zone and upto L45 High zone ( 2019 – 2020) .
2 . 3TORRE LORENZO, 2019 ( Vito Cruz) -LJ project – Supply & Installation of busduct 1600A and addi-
tional work for chipping and flastering work for busduct penetration ( block-out ) from L2 up to L37
3 . TORRE LORENZO, 2019 (Malate under LJ project)–Supply/Installation of Busduct 3200A from GF to L45
4. CITY of DREAMS (2013-2014 under LJ project) -Implimentation for Supply and installatiuon of Equip-
ments ( LVSG, MVSG, ECB, Transformers ( Cast Resins ),wiring works of XLPE ( cable pulling and
and terminations of wires and Assists for the testing of Equipments.. And Installation of Busduct 4000A
BD 3200A, BD2500A, BD2000, BD1200A, BD1000A, BD800A .from LVSG to Synchronizing panel, LVSG
to ECB panel, LVSG to TRANSFORMERS.
5. PDM (Kimberly Clark San Pedro – 2011 ) – Supply and installation of Power Metering and replacement
of new protection relays @ Main CB of MVSG panel with 10 units of branches, and roughing- ins and
wiring of communication cable going to facility room and conduct functionality test current injection
test,including tripping of VCB @ MVSG panel to facility room. ( programmed by other party of APSI.)
6. SUNPOWER (Tanauan Batangas, 2013 ) –Retrofitting works of ATS controller from PLC type to con-
ventional type of ATS Control 2 units (Relays type) @ Low Voltage Switchgear.
7. PDM,Kimberly Clark San Pedro -( Supply and Installations of Control Panel 2010 – 2011) –wiring work
of control panel for Guargum .(using controller softstarters and integrated to HMI
8. SCHNEIDER Electric( Former APC Plant CAV 1, Admin, CAV 2, CAV 3, CAV 4 Plant and CAV 5 Rosario
Cavite,2010- 2012 ) - Supply and Installation of power metering including retrofitting works for the
replacement of Main CB from changed-over type 5000A to ACB Schneider 5000A @ CAV 2 and wiring
of new ATS controller (conventional type) including mechanical interlock restoration of power cables
& install common busbar rated 5000A. (rectification of ATS from change-over switch to ACB Schneider)
9. UNILAB (Crossing Mandaluyong) -Replacement of Components of ATS controller (Conventional relay
Type units and alignment of motorized at LVSG panel ATS 1 and ATS 2.
10. UNILAB Plant (Binan, Laguna) Retrofitting of ATS controller for LVSG 1, LVSG 2 and including replace
ment of Mechanical interlock (2sets ) Capacitor units for cap. banks 1 and cap. Bank 2 ( 12 steps each
and replaced Power cables) And Preventive Maintenance Works of Electrical Equipments .
11. VITACARE ( daanghari, Muntinlupa ) under LJIFI project - Supplied and Installation of Busduct 2000A
From L12 down to Basement 1.
12. I-MET ( Pasay City near MOA, 2020 under LJIFI project ) – interconnection of LVSG panel including
busbaring and wirings works.
13. THREE E-COM ( Pasay City, 2016 under APSI project Supply and Installation of electrical Equipment)
Testing And commissioning of ATS/ LVSG,Transformers and MVSG, And set the parameters control
f protection relays for MVSG panel .
14. PMI TOWER, Makati City (2021) under LJ project – Supply & Installation of busduct 1600A 4 runs from
L5 up to L24, From Transformer 1 to LVSG panel ATS 1 rated 2000A and Transformer 2 to LVSG 2 ATS
rated 2000A and cable laying of XLPE from MVSG 1 to Transformer 1, MVSG 2 to Transformer 2, Termi-
nation and Testing of equipment conducted by servicing group..
15. MARINA 2 Paranaque, 2020) under LJ project) – Supply and Installation of busduct 2000A and 1600A
from GF to L21. @ 8 floors building..
16. ANCHORLAND ( Paranaque,2020 under LJ project ) – Supply and Installation busduct 2 Runs 2000A
BD 3000A 2 Runs including positioning of Equipments LVSG and MVSG panel.
17. SM Cyber Makati 2 (2019, under LJ project ) – Supply and Installation of Electrical equipments.
18. SKYRISE 3B ( Cebu, 2020 under Tsys project) –Installation of Busduct 3000A and BD 2500 from L2 up
to L35 .3 Runs.
19. Amber Hotel ( Cebu, 2020 under LJ project) -Supply and Installation of BD 1000A from GF to L8 20
20. JEG Tower (Cebu LJ project, 2019 ) – Supply and Installation of busduct 1000A, 1200A and 1600A from
Ground F to L30.
21. ON Semiconductor Tarlac ( 2017, 2018, 2019, 2020, 2021 ) Preventive Maintenance works of all electrical
Equipments ( LVSG, MVSG, Transformer Oil and Dry-type, Panelboard, First Private Pole), Conduct
current and voltage Injection testing of protection relays (Analog and Digital Protection relays ).
22. ON Semiconductor, Carmona ( 2018, 2019,2020 ) – Preventive Maintenance of Electrical Equipments
(Mvsg Panel, LVSG and Panelboard and Dry-type transformers).
23. ZAMA FPIP, Batangas, 2019 – Conducted testing of protection relays for LJ supply.
24. PDM Sto. Tomes, Batangas 2016 – Electrical works (Cable pulling and Termination of wires on breaker
gutter, and wiring of Perimeter lightings using halogen light.
25. BDO SHELLHOUSE(Makati,under Sir Eric of LJ 2015)-Conduct simulation of ATS panel under LJ project.
And installation of BUSDUCT 2000A from L12 down to Level Ground..
26. HAMILO Pico De Loro, Batangas ( SM PRIME ) – Preventive Maintenance of electrical equipments
( LVSG ATS Transformers and Panelboard @ Building Miranda A and B, Bldg. Corola A and B and
wiring of additional Power meters ).
27. ONE KATIPUNAN RESIDENCES ( under LJ Project 2020-2021 ) Supply and Installation of Busduct 1600A
from L21 down to Lower Ground floor ( Lvsg panel ).
28. SILVER City 1, 2,3 (Ortigas 2018, 2019, 2020, Apsi Project) – Retrofitting of ATS Control and simulation
testing with Sync. Panel ( Genset power supply and preventive maintenances of electrical equipments
29. SM LIGHT @ Mandaluyong ( under DDTKI project) -Testing and commissioning of ATS control and
installation of power cables on LVSG panel.
30. DATAJ ( under DDTKI project Sta. Teresita Cagayan ) – Supply and installation of Synchro. panel and
ATS panel and Capacitor Banks,Testing and Commissioning @ site, supplied panel by APSI.
31. TWO Shopping Mall (Pasay, under LJ Project ) –Installation of cable tray and cable laying from ECB
1000A to Dry Type transformer (Primary and Seconday connection to
32. ARMYNAVY(PAGCOR, rizal Park )–Installation of Busduct 3000A from existing building to new bldg.
Besidess US Embassy including hauling and positioning of LVSG panel and transformer.
33. STYLE Residences (Ilo-ilo, 2020 under Tom-Elekt) Installation of BD 1600A and 2000A (10 runs) from
GF To L12 @ Tower 1, Tower 2, Tower 3, Tower 4 and Tower 5
34. COCA- COLA Sta. Rosa (Plant, 2019,2020, 2021 ) – Preventive Maintenance of Electrical equipments
such as Medium Voltages Switchgear, Low Voltages switchgear, and panelboard .And Conduct cur –
rent injection test of Protection relays and replacement of XLPE cables and terminations.
35. AVIDA Condo ( Alabang ) - Layout and installation of Busduct 1600A, from Ground Floor to L25.
36. VISTA Condo ( Pasong Tamo ) - Layout and installation of Busduct 1600A from Ground Floor to L30.
37. TRINOMA MALL Quezon City,( under APSI project) –Replacement of power metering PM800(5units)
And Current Transformers (CTs) 5 sets and VARLOGIC Schneider brands, and Capacitor units.
Troubleshooting of ATS controller ( conventional type, relays ) for LVSG 1, LVSG 2, LVSG 4, LVSG 5, and LVSG 6
38. US EMBASSY (under APSI Project, 2015 ) –Supply and Installation of Power Meter ION 7650 ( Main)
With 8 branches ion meter and roughing ins from metering panel to facility area ( switchgear panel )
With Communication cables (FiberOptic) programming on monitoring to be conducted by other party
39. ZADIA 2 & ZADIA 3 ( Condo, APSI Project, 2024) – Supply and installation of Busduct 2000A (2 Runs )
From Ground Floor to Level 18 .
4o. AVIDA CENTERA, (APSI Proj. Mandaluyong, 2022)– supply and installation of power wiring and cable
Tray from LVSG to new ECB panel.
41. CITADINES, (APSI project,2023) Supply and installation of Busduct 1600A from Level 18 sdown to Level
42. GFL (APSI, project 2022) – Supply and installation of busduct 2000Amp. From 20 down to Ground Flr.
43. GENTRY Manor ( APSI project 2023 ) – Supply and installation of Busduct 2000A from L2 up to L18
44. COPENHAGEN Ormoc HOTEL ( LJ project, Ormoc City 2023 ) – installations of BD 1000 from GF to L10.
45. AMBER RESIDENCES ( LJ CEBU project, 2022 ) – installation of Busduct 800A from GF up to L13.
46. CASA MIRA CDO, ( LJ Cebu project, 2023) - Site Inspection of BD 2000A from LVSG to Transformer 1
And BD 2000A from LVSG 2 to TRANSFORMER 2, LVSG 1– 2 Runs BD 1250A ( from GF to Low Zone )
Lvsg 2 - 2 runs BD 1250 - 2 Runs from GF to High Zone.
47. MIVELA Cebu ( LJ cebu, 2021 ) –Installation of Busduct 3000A ( Tower 1 ) and Busduct 4000A from
Ground Floor up to Level 23 (Tower 2,Tower 3,Tower 4 @ low zone up to High Zone level.). Including
chipping and restoration works of blockout (Civil works) @ Tower 1 upto tower 4
48. BAYPORT,( Tower 3 and Tower 4, Tom-elekt project, 2019-2020 )–Installation of Busduct 2000A from
GF Main CB at LVSG panel up To Level 10 .
49. MESSATIERRA GARDEN RESIDENCES ( Davao City, 2022, LJ project ) – installation of busduct 1250A
1000A and BD 800A from Low, Mid -zone upto High Zone level.
50. ECOPRIME(BG Taguig City, 2022- Apsi project )–replacement of MCCB for Plug-in-Un PIU for Busduct.
Including preventive maintenance of electrical equipments such as LVSG panel, busduct, and transfor-
mer. And Installation of new power cable and cable trays from additional panelboard to existing ECB @
low voltage panel.
51. TOPWAY, under LJ Project,, 2019 – Installation of busduct 2000A from Ground Floor down to Level 12.
52. 38 Park Avenue, LJ project, Cebu 2021 –Installation of BD 3000A, BD 4000A from Basement up to L38.
53. E-BLOCK 6 ( Cebu 2021 ) – Installation of busduct 2500A, 3000A busduc t 4000A from LG up to L30
54. JEG Tower ( under LJ project, Cebu 2019 ) –Installation of Busduct 2500A and Busduct 3200A from
Basement to Level 40.
55. FAUSTINA Center ( Apsi project, 2021 ) – Supply and Installation of Busduct 2000A from GF to L12
56. TAFT East Gate (LJ project, cebu 2020 ) – Supply and Installation of Busduct 3000A and 4000A from
Ground Floor to L 40 roof deck.
57. VITACARE, ( LJ project MOLINO ) – supply and installation of Busway 2000A from B1 up to Level 10.
58. APPLIED Machining (APSI project, 2019) supply and Installation of Busduct 800A and energization
59. JOLLIBEE Delta ( under LJ project PLANT, Canlubang, 2018 ) – project implementation ( Supply and
Installations of equipments such as Low Voltage switchgear, High Voltage Switch.,Transformers and
Busducts. 1600A 4 Runs from Substation Area to production building and fabricate and installations of
Busduct bridge and canopy from substation area to production building.
60. ANNAPOLIS, ( LJ project, San Juan MM, 2018 ) Supply and Installation of Busduct 2000A and 1600A @
basement 2 To L 30.
61. SKYRISE 3B, (UES project,Cebu City ) - Supply and Installation of Busduct 3000A and BD 2500A @ B2
down to L 38 .
62. OAKRIDGE ( UES project,Cebu City,2022 ) –Supply and Installation of BD 1600A and BD 800A @ L10
down to L 10.
63. SINOCAN (Paranaque LJ project, 2021 ) – cable pulling and Terminations of XLPE at primary side and
powercable @ secondary side of the transformers ( 3 units).
64. TAMBULI Tower F (LJ Cebu, 2022 )-sInstallation of busduct 1000A, 1600A @ Level 10 down to Level GF
65. SM CYBER WEST ( near SM North,Quezon City ) -Equipments supply by APSI for Preventive Mainte-
nance of Electrical Equipments (Transformers, Medium Voltages Switchgear, Low Voltages switchgear
switchgear,including functional testing of protection relays for HVSG and Testing and Commision-
ning of Automatic Transfer Switch (ATS).
66. CONNOR ( San Juan City, LJ project, 2023 ) - Installation and of cable wires and Cable Trays from
Genset 1, 2 and Genset 3 to Synchronizing panel including rough-ins for control wiring signals (TF
Wires and shielded wires ) And Refillling of oils and Filters for Gensets
67. DATALAND, Tanauan, Batangas ( DDTKI under APSI project, 2021 ) – testing and commissioning of
Automatic Transfer Switch for LVSG panel.
68. VISTA (Pasong Tamo, LJ Project) – Supply and Installation of Busduct 1600A ( Schneider brand ) from
Ground F to Level 20.
69. Bayleaf Condo ( Gen. Trias, Cavite - LJ Project ) –Installation of Busduct 1000A from Ground F to L 10
70. CCF building ( ortigas extension under LJ project ) – Testing and commissioning of LVSG/ ATS panel.
71 . STARMALL, ( Mandaluyong ) – Troubleshooting of ATS panel for LVSG panel and simulation testing.
72. TSQ (Dreammaker Phil. Const. Company Inc., QC, 2017)- Installations of Busduct 1000A and BD 1600A
From MDP 1 and MDP 2 including interconnection works..
73. ARBORLANES, (LJ Project, Taguig City, 2018)- Installations of Busduct 2000A from MCB 1 to L8 and BD
From MCB 1 to LVSG 2, MCB 2 to LVSG 2 and MCB 3 to LVSG 3 . including interconnection works of
busducto Breakers MCB. And testing and commissioning of Capacitor Banks.
74. JOLLIBEE Delta, ( Under Intellisys project, 2018 )- Installations of busduct 4000A from Synchronizing
panel to Genset 1, Genset 2 4000A . Including interconnection works.
75. 8 Storey Hotel ( LJ Cebu project, 2020) – Installation of Busduct 800A from ground Floor to Level 8.
76. Covent Garden Residences,(LJ project, 2022) –Installation of Busduct 1200A and Busduct 1000A from
Ground to Level 30..
77. Pico De Loro, ( Under APSI project ) - Preventive maintenance works of Electrical equipment, LVSG
Panel and panelboard. Troubleshooting of ATS and replacements of components.
78. CITADINES,( under LJ project 2022) - Installation of Busduct 1600A from Basement 1 to Level 10.
79. Metro Central Mall, (Sta, Cruz, Laguna, under APSI project) - preventive of maintenance of electrical
Equipment such panelboard, and Lvsg panel.
80. Globe Manda. ( & Globe Makati,( under PDCC)- preventive maintenance of Genset 3 and Genset 4
81. Urban Deca,( under LJ project, 2023) – refilling of engine oil and start-up of Genset @ tower 4 and
Interconnection of wires in alternator to lineside of Mccb breaker for genset.
82. NEA Admin, (under Lj project 2023) - refilling of engine oil and install battery and start-up of Genset.
83. Admiral Grandsuites,( Mla under LJ project, 20117 ) – Installatio9n of busduct from MDP 2 to trans -
former and Hotel to MDP Ats panel.
84. RED Planet, Binondo, ( under Tom-Elekt project ) Installation of busduct 1000A from ground F to L10.
85 . GOOGLE phil. (at TaguigCity LJ phil. 2017) –Installation of Busduct run 1 @ MTS 1 to riser 20flr, Run2.
86. NAC Tower, (at BGC, Taguig City, 2013 under LJ procject ) – Installation of Busduct 2000 from base-
ment 1 Electrical room LVSG panel to Riser up to Level 15.
87. US Embassy (under Tom-Elekt project ) –Installation of busduct 1600A and BD 1000A including plas-
tering of wall for busduct penetration and interconnection works @ Lvsg panel.
88. Trinoma Mall (under Apsi project, 2018)– measurement and installation of deadfront cover for all LVSG
panel with Capacitor banks.
89. Silk Residences Tower 2,(under Apsi project,2017) – fabrication and installation of Busduct cages ( add-
ditional Work) from Ground Floor to Level 45 and Buduct 1600A 3 runs and energization of busducts
90. RCBC Corporate Center,( under LJ project, 2018) – replacement of busduct 2500A EATON BD.
91. Silver City 1,( under APSI project,2018) – Preventive Maintenances Works and replacement of MCCB
breaker for ATS @ eeroom 201, Troubleshooting and repair of controller.
92. Rockwel Collins,( under IPCC project, 2018) –assists for the installation busduct 800A 4 runs, cable tray
and cable laying and termination works.
93. Rockwell Collins (under H&M IPCC project, 2008) additional works for testing and wiring & energiza-
tion energyzaion of 3 loose controller.
94. Jollibee Zen 3, (M-serve under LJ project)- energization of busduct 1600A and busduct 2000A
95. EVM,(under APSI project,2018)–preventive maintenance of Electrical equipments, LVSG, transformers
96. Department of Finance (under Tom-Elekt project 2018 ) -installation of BD 4000A and s BD 1600A.
97. Hanns Casino & Hotel–preventive maintenance of 4 generators sets .(changed-oil, oil and air filters)
98. MAVEN, (ortigas project) – startup for generator and refilling of oil and install batterys.
99. Connor (under Apsi project)- start-up for generator and refilling of oil and batteries.
100 Wawa Tayabasan,Rizal provinces under Lj project) –Start–up of gensets and install batteries . And
assists cummins personnel for repair of genset due to hard start and set-up of batteries and checking.
101. Estancia, (ortigas projects,, under LJ project)– Start- up of gensets and synchronization testing with
Intellisys . Changed oil for 4 units of gensets.
102. SOLAIRE, Pasay (under Lj project) – energization of HVSG panel including set the parameters of pro-
tection relays with Schneider. And emergency works due to tripping of HVSG VCB
103. SMC, Echague Substation, (Apsi project)- canvassing of materials near around the project area.
104. Trinoma Mall @ QC ( LJIFI under Sir Malowe ) – emergency work of LVSG due to accidentally
shorcuited of Main CB 5000A Dismantling and rewiring /replacement of main busbar common bus)
and restoration of control wires for ATS controller.
Preventive Maintenance work of electrical equipments, Low Voltage Switchgears, panelboards, and
High Voltages Switchgears.Checking, setting of parameters and testing of power factor controller
for Capacitor Bank (6 sets) and testing of capacitance tests and replacement all weak capacitance,
and replaced PF from ABB to Schneider brand and replacement of power metering from Square- D
old model to PM 800(new Model)
105. DoF (Dept. of Finance, under Tom- Elekt project) –installation of Busduct 1600, and busduct 1000A
106. IT Park, ( Cebu under Tom-Elekt project, 2019 ) – installation of Busduct 3000A and Busduct 4000A
from Ground floor to Level 30 (4 runs).
107. MIVELA, (cebu project under LJ Cebu, 2023) – installation of Busduct 3000A and BD 4000A At bldg.
1, Bldg 2, Bldg. 3, Bldg. 4 and Bldg. 5.
108. TELEPERFORMANCES, Pavillon mall( under Sir Marlowe project crossing, Manda) Troubleshooting /
Retrofitting of ATS controller ( 3 SETS) Testing and Commisioning of ATS/ LVSG panel
Troubleshooting and repair, And Replacement of components to the other ATS equipments
109. International Finance Center (BGC) – Preventive Maintenance of Electrical Equipments
110. Red Planet (Binondo under Tom-Elekt) – installation of Busduct 1000A from ground floor to L10.
111. DLSU Dasma .(Cavite, under Tsys ) Cable pulling 6 sets of 250mmsq .(under the manhole) and XLPE.
Fr. secondary transformer to new panel (250mmsq) and from transformer to first private pole (XLPE)
112. VISTA (pasong Tamo, Makati) –installation of (BusDuct 2000A) from from Ground Floor to L10.
113. Monark, ( Binan under Intelsys project )–Terminations of power cable for 3 units Gensets ( 7 sets) of
250mmsq. From Alternator to ACB breaker.
114. Velez (Cebu project, 2023) – installation of Busduct from LVSG panel to transformer..
115 URC Cabuyao, (cabuyao, 2022)– installation of busduct 800A from ECB to production area.
116. ORMOC Hotel (ormoc 2022) – installation of busduct from ground floor to Level 8
117. Maven, ( ortigas, 2024) – Start-up of generator sets with synchronizing panel.
118. URBAN DECA, (2024, LJ project) – start-up of generator set @ building 8 and loadbank testing.
119. SM AURA, (2022, under LJ project)– positioning of LVSG panel, busbar works, hauling and intercom-
nection works., installation of busduct jumper from Lvsg – Lvsg panel, to transformers equipments.
Emergency works – due to overheated of equipment busduct and replacement from 3000A to 4000A
Preventive Maintenance of Electrical Equipment, LVSG, MVSG, and transformers units and testing
of protections relays before energization of equipments units &Conduct capacitances testof cap.banks
120 . GlobeValero,Makati city (under Powerlines) start-up testing of generator supplied by powerlines
121. Globe Theodore, Quezon City (under powerlines) – Start-up testing of genset supplied by powerlines.
122. Globe Pasong Tamo Magallanes (under powerlines) hauling and positioning of Xformer equipment.
123 Bayport Tower 3,(under Tom-Elekt Project)–installations of busduct 2000A from ground Floor to L10.
124 Bayport Tower 4,(underTom-Elekt, project)- installations of busduct 2000A from ground Floor to L10.
125 Maynilad Villamor,(under LJ project)emergency work due to moisture and damaged the CT;s & PTs
And replaced new VCB at main and CTs and PTs. And install heaters inside the panel.
126 Power Plant Mall (Rockwell land)–assisted conduct thermograph scanning with former APSI thermo
Grapher all panel inside the power Plant Mall (per unit tenants) under Tom-Elekt project with George
Aquino Thermographer.
129. Marque Mall (Pampanga) preventive maintenance of electrical Equipments (LVSG, MVSG and trans-
Formers (under LJ project)s
130. PAGCOR, Pasay – testing and troublrshooting of ATS controller.
2. Position : Electrical Supervisor Wiring
Company : Total Powerbox Solutions Inc.
Address : Cavite Light Industrial Park (CLIP, Silang, Cavite)
Employment Status : Regular Resigned (From October 5, 2005 upto Aug.2010)
Job Descriptions;
Responsible to provides wiring diagram, requisition of components and assists wireman to
perform the tasks, oversee and monitoring of electrical wiring installation and during the construction of
panel. Panel Assembly, Wiring and Troubleshooting of electrical controls (Automatic Transfer Switch (ATS),
Motor Control Center ( Direct Online Wye Delta, Reverse/ Forward) Automatic Capacitor Banks and Medium
High Voltges Switchgear control equipments : And Testing and Commisioning Electrical of Equipments.
HANDLED PROJECTS (DURING MY TERM as WIRING SUPERVISOR) :
1.COTABATO SUGAR ( Cotabato ) - Reconstruction of MCC enclosure with wirings (5 units unitized
panel with 10 to 15 compartments (controller) each panel (year 2006- 2007).
2.EAGLE CEMENT (Bulacan ) Reconstruction and wiring of MCC enclosure with 20 to 30 comparment
Each panel and wirings of each controller per compartments (Year 2008 – 2009).
3.3M PHILIPPINES - Reconstruction of Telephone cabinets outdoor panel with wiring of power
supply and Switching sensors for Flood, High Temperature with heat exchanger fan ( cooling devices ), Ceiling Fans to reduces warm temp. inside the cabinets. ( Hundreds of cabinets units )
And testing and commissioning of panel in different area of ILOCOS with 3M personnel and other
Place in Rizal provinces. ( Montalban, Cainta and Antipolo and San Mateo with other party of 3M
4.BISCOM ( Negros Occidental under ABB project )– Reconstruction of MCC panel with VFD devices
and Soft Starters, DOL controller. With 10 to 15 controller each panel (7units of Unitized panel with
5 vertical sections).
5.EMBARCADERO (Legaspi, Albay) Reconstruction of MVSG panel with 5Vertical section and wiring of controller of VCB And testing of electrical functionality of protection relays ( SEPAM S40 Main and
3 units S20 for 3 brances and Functional testing for ON and OFF ( Electrical operations )and sets the parameters, testing and commissioning @ site.
6.MANILA WATER ( around Quezon City area and Makati City under Tom- Elekt project ) Recons-
truction of MCC panel and Wirings,Testing and Commissioning of MCC panel with VFD and
Softstarters, ABB Brand (2008 - 2009).
7. PIG CITY(Gen. Trias,Cavite, 2008)- final testing of automatic transfer switch (ACB 2000A) and Align
ment of mechanical interlock w/ generator fueled by bio-gas ( methane gas ) from the pig menure
8. Banco De Oro – assembly and wiring of Unitized Panel ( hundred of unitized Panel, 2006- 2008)
9. ALPHALAND ( Magallanes ) -Testing and Commissioning of LVSG/ATS panel ( under supplied by
T’SYS industrial Ins. an affiliates of Total Powerbox Solutions (TPBSI).
10. ST. FRANCIS, Shangi-la Tower,2008 ( Mandaluyong, supplied byTom-Elekt)–repair and replacement
Of MTS components ( magnetic contactor type from Level 2 up to the L55 (Hundreds units of MTS
panelboard ). And energization of LVSG panel.
11. SERENDRA (2006–2007, BGC Taguig City @ Tower A, Tower B, C, D, E and Tower F Supplied by LJ
Industrial)–Replacement of ATS ABB stots breakers to mccb, ABB motorized type in Breaker Gut-
ter And Conduct simulation testing of ATS, including set the parameters of CAP. Bank per Tower
(Functionality Test. And testing and commissioning of Capacitor banks per tower
12. MISIBIS BAY RAINTREE( Sto Domingo, Legaspi, Albay, testing and commissioning of ATS/LVSG
panel and set the parameters of ATS controller (conventional type) with Intellisys personnel.
13. ST. FRANCIS SQUARE (Mall bldg)- testing and commissioning of ATS/LVSG panel and retrofitting
work of busbar for common bus.
14. SAN MIGUEL Yamamura (IMUS Cavite, 2006 ) Testing of ATS Controller of LVSG with 1 1 Vertical
Sections sets the parameters and troubleshooting (malfunctioned)
15. MAYNILAD Pumping Station ( Villamor, LJ Project, 2008 ) wiring of controls for Medium Voltage
16. Switchgear (HVSG main 34.5kv ) and MVSG 4160 Volts (4 branches @ site. And simulation testing
17. MARQUE MALL, LJ project (, Angeles, PAMPANGA, 2006- 2007 )- Testing,troubleshooting of ATS
controller ABB brand For LVSG panel and assembly of panel including busbar interconnections.
18. JOYA (RLC under Tom-Elekt project )–Troubleshooting and testing and commissioning of ATS
controller for Low Voltagw switchgears
19. ROBINSONS(Guadalupe,mandaluyong Cty,2009,under LJ project) testing and commissioning
and troubleshooting of ATS/Lvsg panel,and set the parameter of ATS controller conventional type).
20. VIRAMALL, ( San Juan, MM) – testing and commissioning of Automatic Transfer Switch for LVSG
21. ABB project (Paranaque city)assembly & wiring of control for medium voltage switchgear (MVSG)
And Testing and ommissioning @ site.
22.Teleperformance (under LJ project,Greenfield crossing mandaluyong) retrofitting works of
automatic transfer switch (ATS) and testing and commissioning for LVSG panel.
23. Teleperformance ( under Tsys project, Magallanes) - testing and commissioning of ATS at
Low Voltage Switchgear LVSG .
24. Anvaya Cove (Bataan, Ayala project) Testing and commissioning and checking of