BHARGAV POLISETTI
Mechanical Engineer
Columbus, Ohio ********.*********@*****.*** +1-773-***-**** KEY ACHIEVEMENTS
Co-Author for 3 Research
Publications - Developed Carbon
fiber based composite materials
for Automotive / Aerospace
industry purpose.
Continuous Improvement
Process in Systems Engineering
Developed and implemented an
efficient project management
tracking system for systems
engineering activities and
contributed in all aspects of
Requirements Engineering,
developing RAM reports and
performed all the system safety
activities delivering effectively as
per the schedule which resulted
reducing systems engineering
operations costs by 15%.
Production Improvement
Developed engineering process
plan to automate scanning
process which impacted reduction
in time manually and increased in
10% efficiency of production
quantity.
Product development and Lean
Manufacturing method
Developed product which helped
in the weight reduction from 40
kgs to 10 kgs and Implemented
Lean manufacturing methods to
process the production which
impacted the cut down of
production time of each motor
casing by 32 hours effecting 3
months of mass production.
This resulted in reducing 10% of
the total cost of production value.
CERTIFICATION
Six Sigma Green Belt
SUMMARY
Experienced mechanical & systems engineer seeking a position to utilize my skills in design engineering principles (CAD), Manufacturing, Production, Process, Systems, Composites, CAE/FEA, Requirements management, RAM
(FMECA) & Systems safety (Fish-bone, 5-why) and other abilities. EXPERIENCE
Systems Engineer
UGL Pty Ltd. Australia 05/2021 - 09/2024
Contributed in all aspects of systems engineering and safety assurance (SESA) making sure deliverables are as per schedule which impacted 25% of the cost savings in systems engineering department.
Developed systems engineering process according to MBSE to map the project requirements from system level to SRS and sub-system design packages using IBM DOORS.
Developed Requirement Management Process (RMP) plan as part of the Systems Engineering process to the project and implemented continuous improvement process to validate the process plan according to the progress of design stages.
Developed and delivered verification cross reference matrix (VCRM’s) to all the sub-system design packages from preliminary design to testing & commissioning phase of the project.
Performed Verification & Validation against to the project requirements embed in VCRM’s.
Performed FMECA (RAM) activity and functional safety analysis and risk assessment matrix during safety workshops. convert into derived hazard control requirements.
Production Engineer
Nissan Casting Plant Australia Pty Ltd. 05/2020 - 04/2021
Implemented Lean manufacturing method as the part of Nissan’s production process and reviewed the engineering process plan.
Performed Production Process Engineering – Review the design process, production procedure, maintain the reports according to production process plan, equipment checks carried out according to SOP’s and ensure compliance as per standard ISO 9001.
Performed SOP checks of installing the moulds (cover die and ejector die) in Die casting of electric engine car parts (HS Base, Top cover base and B13B cover) as per process plan.
Performed Quality control checks by visual inspection in Robotic machine for Tool breakage and Oil leaks before machining process.
Performed Quality control checks by visual inspection on machined parts for Loose flash, chatter, mishandling, and any other machining damages and casting damages, check for porosity, scan and processed for approval to assembly department.
Maintained all the Quality control documentation of Manufacturing procedure according to the process plan, including production sheets for details on the production of parts and machine.
SKILLS
CAD CATIA MBSE
IBM DOORS ANSYS
STAR-CCM+
Requirements Engineering
Root Cause Analysis FMECA
CAE/FEA Fish-bone
Lean Manufacturing Methods
EDUCATION
MS in Mechanical Engineering
Deakin University
Bachelors of Technology
Aeronautical Engineering
EXPERIENCE
Mechanical Engineer
Corrosion Technology Australia (CTA) Pty Ltd, Australia 04/2020 - 08/2018
Developed production techniques and methods using continuous improvement process efficiently to improve manufacturing processes on the shop floor. This impacted to meet the deliverables 10% more efficiently within the scheduled timeline without any delays.
Performed product development engineering, and engineering calculations for industrial products.
Experienced with hands-on manufacturing processes includes – o Filament winding for fiberglass parts of pressure vessels, chemical tanks, pipes and other industrial products.
o Vacuum bagging molding for glass fiber parts (Cab car panel) of Victoria trains
o Wet layup mold – for chemical tanks, pipes and oil & gas industrial products
o Injection molding process for producing swimming products. o Metal Stamping process of Steel blank sheets for the production of front parts of train - side wall plate, side wall beam, side wall pillar.
Performed quality checks using vernier calipers and visual inspection according to drawings to confirm safe, compliance and cost-effective design criteria.
Identified gaps in the engineering process plan through continuous improvement process – devised and developed documentation and process from designing, drafting to assigning as-built designs and final building information models (BIM) in the manufacturing department.
Maintained all the engineering process documentation, quality control including shop floor drawings, product drawings, As-built drawings, process flow charts, design reviews, and prepared all test reports before the product is tested. Research Assistant
Carbon Nexus Pty Ltd., Australia 08/2016 - 05/2018
• Contributed towards research and experimental analysis which impacted the project completion way before the actual timeline within duration and resulted in being Co-author for three research publications towards automobile and aerospace industry.
• Conducted research experiments on reducing time of producing carbon fibers in the high-performance materials group.
• Provided chemical and technical support through lab experiments and designing the products, and sample preparation.
• Conducted material research analysis using advanced material characterization techniques.
• Developed prototypes of carbon fiber tyres and proceed for manufacturing process after approvals. Mechanical Systems Engineer
Advanced Systems Laboratory, India 06/2013 - 07/2015
Performed CAD design to build major components for composite rocket motor casing (CRMC).
• Performed CAE analysis to evaluate and reduce the weight of carbon fiber composite case effecting smooth flow of aerodynamics.
• Designed and developed nozzle liner components in CAD according to the hardware provided.
• Coordinted with safety engineers to design the components according to the functionality.
• Performed CFRP Winding checks and maintain all the data recordings of the component.
• Quality control checks - Non-destructive testing (NDT) techniques for detecting flaws in components: Die Penetrant Testing, Ultrasonic Testing, Ultrasonic Testing, X-Ray radiation testing – to find de-laminations.
• Performed proof pressure tests (hydro test) and burst tests on composite rocket motors.
Implemented lean manufacturing methods which impacted in cut down of production time of each motor casing by 32 hours effecting 3 months of mass production. This resulted in reducing 10% of the total cost of production value of missile motor casings.