Post Job Free
Sign in

Quality Assurance Project Management

Location:
Humble, TX
Posted:
October 26, 2024

Contact this candidate

Resume:

YSAUL

CORREA

QAQC ELECTRICAL

INSPECTOR

+1-832-***-****

*************@*****.***

Houston, TX 77089

CONTACT

SKILLS

Licensed electrician (10+ years)

#218843 expiration 08/26/2024

• Electrical

• Troubleshooting

• Project Management

• Maintenance

• MS Office

• Hand Tools

• Blueprints

• Leadership Experience

• NEC

• Schematics

• High Voltage

• Equipment Repair

• Programmable Logic Controllers

• Blueprint Reading

• Low Voltage

• Calibration

• Computer Networking

• Industrial Maintenance

• Quality Assurance

• Fabrication

Experienced and certified Journeyman Electrician certificates. Prior to becoming an inspector, managed a team of electricians after working to achieve Electrician credentials. Past roles have also included construction electrician and electrical repair technician, providing a rounded range of experiences in the field.

PROFESSIONAL SUMMARY

QAQC Electrical inspector

Walker engineering inc, Houston, Tx

The QAQC coordinator will implement and monitor Walker's quality control/quality assurance program

Ensure construction-related processes and materials are compliant with contract specifications, regulatory standards, and Walker's safety and operational policies and procedures

Mentor field personnel to ensure QA/QC compliance and proper implementation on a job-by-job basis

Participate in new project planning

Assist with determining the necessary installation technique(s)

Conduct regular walk-through inspections

Evaluate each project and ensure conformance and compliance with contractual specifications, government regulations, and Walker and OSHA safety requirements

Inspect manufactured products, on-site materials/equipment, and installation processes to ensure compliance with contract specifications and regulatory standards

Document and communicate inspection results

Identify and recommend solutions for non-compliant situations

Follow through to ensure 100% compliance and conformance

Provide QA/QC feedback for each phase of the project Electrical inspector

TLC engineering inc, Houston, Tx

Update and maintain the latest revision of all project documents EXPERIENCE

April 2023 - March 2024

January 2019 - April 2023

• Construction Management

• Construction

• English

• Leadership

• Management

• E & I

• Review, coordinate and forward submittals, inspection requests, technical query to the project team

and/or discipline engineers

• Assist the project site team during internal, external and site surveillance audits

• Uphold reputation of the Quality Department with a positive attitude and understanding of quality'

s integrity. To protect any quality field issues while meeting the expectation of the customer' s high

demand of quality workmanship

• Capable of performing electrical tests (Insulation Resistance, Hi-pot, Surge, Core-loss, Resistance,

Bar-to-Bar, Impedance) and mechanical measurements as they relate to the product or customer

requirement

• One or more principles' shall be accomplished with supporting documentation

• Inspect a variety of electronic components and assemblies such as printed wiring boards, connectors

with attached wires,flexible circuits, crimped or soldered wires, a variety of molded parts and/or the use

of such materials in electronic arrangements of various degrees of complexity

• Ensure all required paperwork is received and previous operations indicated on the documents

are completed in accordance with established procedures prior to conducting an inspection.Complete

rejected material dispositions (RMD) paperwork

• On a daily basis monitor and record all work scope being executed and prepare a comprehensive Daily

Report with measurement of daily quantities completed Electrical Foreman

WilsherCo, Inc, Houston

Electrician

Ardent Services, Inc, La Porte

August 2016 - January 2019

Plans layout, installs and repairs wiring, electrical fixtures, apprentice, and controls equipment as well as directing and training electrician helpers to wire heat trace panels

• I.T.C

• Power boxes working with Next ran, Chroma box

Barksdale depending upon the recommended design of the overall electric heat

• trace system

(also programing MR-100) Wileco Heat trace panels.Journeyman License # 218843 TWIC

October 2013 - August 2016

Extensive experience installing and terminating new home-run cables in existing FJB's

• Interpret drawings, one-lines, schematics and wiring diagram Installing, terminating, testing, troubleshooting, commissions and operations of low/medium/high voltage electrical systems

I/E Technician

Mundy Companies, Pasadena

I/E Technician

HOUSTON CONTROLS, Baytown

Maintenance Electrician

BAY LTD, Deer Park

Journeyman Electrician

Install and power-up the Delta V Controller and I/O cabinets in Rack Room, enclosure for the ECC Controls Delta V network switches and install cables within the Rack Room form existing marshaling Panels to new Delta V I/O

• Terminated in Delta V cabinet, Bentley Nevada cabinet as showing on scopes. September 2012 - October 2013

• Duties were to run and distribute power throughout facility

• Installation of electrical components

Ensure equipment is operational and safe prior to final test, level instruments, flow and pressure instruments, control valves, PLC, testing of AC and DC variable, speed drive system, test and troubleshoot instrumentation, programming and troubleshooting PLC system

Maintenance of troubleshooting along with the ability to read and understand P

& ID loop drawings

• Used the 475 communicator to verify setting of instruments in the field Experience with PLC, ladder logic, control valves, field bus modules, Tricones

• and Foxboro software packages or related DCS platforms

• Instrumentation relating to temperature, pressure, mass flow and level

• Included DP, coriolia, vortex, ultrasonic and magnetic instrumentation. April 2011 - July 2012

• Installed and maintained the repair of electrical wiring

• Ensure of work environment was in accordance to relevant codes Installation of the service street lighting, intercom systems, electrical control systems, running conduit, troubleshooting also repair instrumentation

• Maintained accurate records and logs as required of calibration checks Assisted the supervisor in estimating, planning and procurement of required materials for both maintenance and capital activities in the industry work area

Review work orders and equipment history to identify and correct recurring problems in the work industry.

April 2010 - March 2011

Performed repair and maintenance on motor control, circuit and general lighting

• circuits

• Electrical termination/distribution panel tracer-heat tracer Troubleshooting, calibrate and install electrical and instrumentation equipment that was used in the chemical processing facility.

October 2009 - April 2010

S&B Company, Deer Park

Leadman Electrician

I.S.C, Dickinson

Leadman Electrician

Tracer, Houston

Maintenance Electrician

Tepsco, Deer Park

Electrician

Amber LP, Deer Park

Maintenance Electrician

Austin Industrial, Deer Park

Job duties were to test electrical components for continuity and proper voltage reading according to specifications

• Reading blueprints and schematics proficiently to perform the duties

• Running conduit, pulling wire to panel and to terminate the wire. August 2008 - October 2009

Installing high-quality electrical field work and taking measures to increase the company's effectiveness and efficacy

Repairing wiring, electrical fixtures, power equipment, and components of machinery and equipment following electrical code, including motors relays, switches, thermostats, circuit-breakers.

January 2008 - August 2008

• Heat-tracing

• Install tubing and transmitters

• Pulling cable

• Terminating MOV, panels, power boxes

• Control valves

• Estimating jobs, ordering inventory.

January 2007 - January 2008

• Terminating panels, transformers hook-ups

• Switch gear work

• Pulling cable and other electrical apparatus in an industrial environment

• Running conduit.

May 2006 - August 2007

• Terminating motors

• Stress-cones

• Installing floodlights

• Control room work, substation work, generator systems. October 2005 - May 2006

Electrician

UEI, Deer Park

Journeyman Electrician

Master Electric, Houston

Journeyman Electrician

IES, Pasadena

Maintenance Electrician

National Oilwell, Houston

Electrician

All Texas Electric, Houston

• Troubleshooting PLC relays, motors controls

• Lighting

• Hook-up components of machinery and equipment

Testing electrical components for continuity and proper voltage reading according to specifications.

February 2004 - October 2005

• Pressure calibration

• Megger, volt meter, etc

• VFD, UPS-system hook-ups

• Terminating panels, pulling cable

• Cable tray runs.

April 2003 - February 2004

• Meter upgrades, parking lights

• Repair/replacement on equipment

• Running conduit, EMT, plastic-bond

• Underground wiring.

January 2002 - April 2003

• Hooking up motors, mov's

• Reading blueprints, schematics

• Running conduit, pulling cable

• Cable trays runs.

December 2000 - January 2002

• Equipment checking, maintenance

• Overhead cranes work

• Following electrical code

• Plan layouts and installation of electrical wiring equipment, fixtures. May 2000 - December 2000

• Terminating

Electrician

G&H Construction, The Woodlands

• Pulling cable

• EMT conduit running

• Lighting circuit

• Commercial and industrial environment.

May 1998 - May 2000

• MOV hook-ups, panels

• Motors etc

• Pulling cable

• Running conduit

• Pipeline work.

Diploma in Instrumentation

San Jacinto College

Diploma

Milby High School

EDUCATION

CERTIFICATIONS

• Journeyman Electrician

• JL# 218843 08/26/2024

Work Permit: Authorized to work in the US for any employer PERSONAL INFORMATION



Contact this candidate