Post Job Free
Sign in

C Superintendent, 30 years in the field, design build, start to fi

Location:
Winchester, VA
Posted:
October 23, 2024

Contact this candidate

Resume:

Sean A. Kidwell

*** ***** *****

Winchester, Va. 22602

● **********@*****.***

540-***-****

Summary:

I have over 25+ years experience supervising, managing and building commercial and residential construction projects as both a tradesman and superintendent. I have a proven track record of successfully completed projects.I am a strong team member and look forward to challenging projects, building relationships with clients, subcontractors that will have positive lasting impressions. motivating by example to others on the team to achieve optimal results. while maintaining proper safety measures and keeping. "A CAN DO ATTITUDE " Education:

James Wood High School

August 1991 – December 1994

General Education Diploma

Graduation Date: 1994

Certifications:

OSHA 10 (2022)

MSHA (2022)

CPR (2022)

AED (2022)

All Aerial lifts

All Platform lifts

All Hilti powder actuated hand tools

HEAVY Equipment- Back hoe / Mini Excavator, Skid steer, Loader & Trachoe Master Carpenter - 25 years Hands On

Experience

Skill Set:

Computer Programs: Windows, Microsoft Office, Excel, Blue Beam, Blue Prints & Working Schematics

Assembling “As Build” Drawings

Willingness to Listen & Learn from Others Involved

Safety & Time Management OBSERVANT

Operation Monitoring

Quality Control

Job Site Health & Safety

Proper PPE Equipment Knowledge

Job Site Logistics

Project Management & COMMUNICATION, PM, OWNER /CLIENT confidentiality driven

Vendor/Subcontractor Management

Scheduling, Estimating, Budgeting and Cost Control Awarness

Physically able and adequate Endurance for consistent long hours too achieve successful completion.

Skilled with all hand tools including Sand Blaster (fit tested for a full face mask)

Equipment operation: Forklift, Backhoe, Skid Steer, Trackhoe, Mini Excavator, Front End Loader

Commercial and Residential: Concrete Work, Stone Work, Tile Work, Painting, Spraying, Framing, Drywall Installation & Texturing, Mold Remediation & Abatement, Remodeling, Log Cabin Repair & Maintenance, Roofing, Fabrication, Milling and Cutting Metal, Window and Door Installation, Trim Work.

WORK HISTORY

KinsleyConstruction & Industrial

02-7-2022 to current

Forman / Lead

INDUSTRIAL Concrete / Rebar pours.

Steel Erection of Industrial Equipment (Rock Crushers / Conveyors) etc. Commercial Tenant Renovating & New layout, (- BAE - MILITARY, PRIVATE SECTOR * security clearance approved *)

Everything Construction

Owner/Lead Carpenter

May 2015 to Present

Building professional relationships with clients, Providing quality craftsmanship, Design build, Working closely with clients to bring their design ideas to life Building sunrooms, additions, garages, decks & finishing basements Renovating bathrooms & kitchens

Drywall application & finishing, painting, staining Custom Stone Work: interior and exterior designs

Concrete Projects: Retaining Walls & Patios

Trim: Interior and Exterior cosmetic finishes

Installing new windows & doors (including all hardware) Log Cabin Repair & Maintenance

Shockey/Metromont

Repairs/Finisher

June 2018 - June 2020

Responsible for repairs to multiple different styles of formed concrete pieces: wall panels from 6’ x 12’ to 12’ x 40’, Double Tees (parking garage pieces) of many different sizes and designs

Given job numbers for repairs daily from “QC” (Quality Control) All repairs done in accordance with job schedule and crane schedule Located pieces in yard and repaired piece to specifications per print Cutting concrete/ chipping/ drilling to remove rebar, metal bearing plates and block out pockets

Installing new materials, rebar, correct bearing plates, block outs in correct locations, forming of piece to be fixed

Pouring of concrete or 555 grout new repair

Pouring new concrete forms and vibrating to finish Remove forms and grind to finish and rub to finish grade or construction grade (many different styles, colors of concrete finishes to be accountable for) Works very long hours 12 to 16 hours per day

Keller Brothers Inc.

Superintendent,

March 2014 - May 2015

Oversee multiple projects to include: Scotland Recreation Center, Scotland MD.

~Mercer Middle School, Chantilly Va. ~ Star Point Plaza, Burtonsville MD. ~H.L. Mooney Advanced Water Reclamation Facility, Woodbridge VA, Worked as lead on a job where all things are go-green. (All material used in the building had to be bio-friendly)

Coordinate all subcontractors to fulfill their contracts in a timely manner Install safety regulations (OSHA approved)

Maintain the projected finish schedules

Track daily production

Call in final inspections

Work closely with the project manager to insure all issues were promptly met with professionalism

Maintain a professional working relationship with owner/client Assemble as builds for completion package

Robey Inc.

Forman/Lead Man

September 2011 – March 2014

Overseeing multiple jobs at the same time

Wearing tools when needed

Material take offs

Communicating with clients, inspectors & architects etc. Turning in labor hours and tracking hours to meet quotas.

Pyramid Consulting

Superintendent

March 2010 – September 2011

Superintendent in charge of overall management of labor and material take-offs. Responsible for communicating with clients and subcontractors. Responsible for calling in job safety reviews and inspections. Headed up special projects as assigned.

Received security clearance for the following classified government projects: SAIC, CSC, MedStar, HP, National Rehab Hospital, and Walter Reed Hospital. Oversee projects to ensure any modifications are approved by management. Recognized by clients for outstanding workmanship. (see attached letters of recommendation)

ASI Construction LLC

Form Carpenter/Crew Leader

June 2009 – February 2010

Jobs included the Fredericksburg Embrey Dam and New Creek Site #14 Dam in Keyser, WV

Building forms from wood for bracing “Sailboats” securing for concrete pour Free climbing “Meva” form panel walls with two point harness lanyards upwards of 60’ in height to guide in new panels by crane to be installed on the face of the dam. Pouring and vibrating of “RCC” Rolled Compressed Concrete installed on lifts of 2’ increments at a pour. Then rolled and compressed and compression tested. Tying rebar per print and size. Laying out for form panels per print dimensions and structural adjustments moving forward. Extreme heavy lifting and long hours 12 - 16 hours a day

Brech-Bill & Hellman

Lead Carpenter

February 2009 – June 2009

Performed carpentry tasks meeting or exceeding client expectations Skilled metal mechanic

Crew outlook and organizing labor hours

Responsible for new layout and material take offs

Completed punch-out work as needed

Completed various construction jobs on-schedule and on-budget Completed special projects as requested including; Front Royal Government Center, Mt. Alto college dorms, and Penn State college dorms.

GEO Finishes

Lead Carpenter/Foreman.

April 2005 – February 2009

Responsible for laying out new tenant walls and ceilings Completion of quality work in a timely manner

Responsible for communicating with various clients and subcontractors. REFERENCES AVAILABLE UPON REQUEST



Contact this candidate