Sr. General Manager, with **years' experience in implementing quality
mechanisms to deliver desired output
Result-driven professional, targeting assignments in Operations &
Maintenance / Project Management with an organization of repute in Cement &
Thermal Power Plant sector
? Profile Summary
. Rich experience in Industrial Engineering, Production Equipment
Maintenance, and Installation & Commissioning
. Strong technical background in Operation & Maintenance of various
Mechanical equipment & machine in Cement plant & Thermal power plant
including Coal handling & Ash handling areas
. Excellence in monitoring adherence to quality systems and complying with
IS / ISO quality standards; executed various continuous improvement
projects, Audits & Inspections
. Directed optimization of machine capacity utilization & production
schedule; planned & executed Maintenance Practices TPM (Total Productive
Maintenance); proven skills in reducing downtime and enhancing
operational efficiencies
. Delivered multi-skill development training to technicians, leaders,
supervisors and developed competency matrix in all levels of maintenance
and tool box and safety measures
. Registered as a Valuer From M/s institution of Valuer New Delhi for Plant
& Machineries
. Leader with strong communication, interpersonal & technical skill with
the skill to grasp new concept quickly
? Key Skills
Mechanical Engineering & Maintenance Maintenance Strategy & Planning
Project Management Equipment Erection & Commissioning Predictive &
Preventive Maintenance Shutdown Planning & Execution Condition
Monitoring, Inspection Troubleshooting, Root Cause Analysis ISO Audit
Documentation HSE Management
? Knowledge Purview
. Operation & Maintenance of:
o Cement Mills of Capacity 120 TPH
o Stacker & Reclaimer
o DG Sets capacity 23.5 MW running at HFO & LDO fuel as an In-charge of
Power House
o Coal Handling Plant which includes "Crushers, Vibrating Screens, Belt
Conveyors, Bucket Elevators
o Ash Handling Plant which includes ESP, PD Pumps, Drag chain conveyors
. Commissioning of:
o Cement Mill of Capacity 120 TPH
o Kiln of capacity 200 TPH
. Erection of Belt Conveyors
. Establishment of Condition Monitoring Cell
. Documentation of ISO14001 & OHSAS 18001 for implementation
. Erection & commissioning of:
o Softening water plant for DG sets of capacity 400M3 per day
o Main Bag House supplied by M/s BHA, USA
o Dry fog systems to suppression the dust in coal plant
. Maintenance of M/s BHEL Turbine of 38.5 MW
. Installation of new dense phase system for carrying fly ash from power
plant to cement plant through air conveying system
? Work Experience
Since Jun'17 with Ultratech Cement Ltd. (Aditya Birla Group), Bela as Sr.
General Manager - TPP
Deputed at 27 MW Bela Cement Works-Unit as In-charge of 27 MW-AS A FH-TPP
Jun'03 - Jun'17 with J P Group, Bela
Growth Path / Deputations:
Jun'03 - Aug'12 DGM - Mechanical Head (Power Plant), Rewa, MP
Managed Commissioning of 38.5 MW (CFBC Boiler of 170 TPH,
87 ATA TKIL Make &Maintenance of Boilers of 38.5 MW (CFBC)
Aug'12 - Jun'17 GM-Technical Head, 27 MW Bela Cement Works-Unit as
In-charge of 27 MW - CPP
Feb95 -June'03 with M/s J K Lakshmi Cement, Sirohi, Rajasthan as Manager
Managed commissioning of LOSCHE vertical roller mill of capacity 225 TPH
and worked as a Maintenance In-charge
Feb'87 -April'95 with M/s Jaypee Rewa Cement, Rewa as Mechanical Engineer
Managed Operation & Maintenance of Vertical Roller Mill of Capacity 280 TPH
& handled the shift operation
Jan'86 -Dec 86 with M/s Hein Lehmann (India) Ltd., Faridabad, Haryana as
Diploma Engineer Trainee
Managed Operation & Maintenance of Drawing of SS Wire
Key Result Areas:
. Managing start-up & operational maintenance of mechanical equipment in
safe and systematic environment
. Supervising operation, repair & maintenance work of the workshop as per
requirement; ascertaining spare parts planning & shutdown planning and
review with Store Purchase and vendors
. Ensuring the adherence of maintenance activities; developing checklist
required as pre requirement of commissioning activity for equipment
. Delivering and implementing projects as per scheduled milestones;
upgrading technology in products and processes to counter market
competition while ensuring compliance to quality standards
. Inspecting the maintenance sheet & plan for new development job;
minimizing the changeover time for the plants; checking & filling of
daily, weekly and shutdown checklist as per ISO; maintaining ISO
documentation
. Conducting analysis of machine failures and implementing actions plan for
prevention of recurring problems
. Confirming that periodic & preventive maintenance are appropriately
scheduled & accomplished and emergency troubleshooting & maintenance
support were readily available
. Liaising with service providers for the planned maintenance activities;
ensuring compliance with statutory obligations as per the government
norms and IBR note
. Ensuring availability of stand-by for critical equipment as far as
possible to reduce downtime
. Monitoring the plant performance including boiler and turbine; improving
the thermal efficiency and auxiliary power consumption; ensuring the fuel
stock
. Assisting in Internal Auditing of IMS system
. Supervising OEM substations for the purpose of cost cutting and fast
delivery of spares
. Instituting various kinds of maintenance system such as preventive,
predictive by thorough investigation of equipment with the help of 5S
system, Why-Why Analysis, Root Cause Analysis, and so on
. Administering modification and improvement jobs in boiler, turbine ACC,
CHP & AHP; maintaining lifting tools and tackles
. Leading a team of skilled technicians and fitters on day to day
preventive / predictive maintenance, shutdown and breakdown maintenance
activities; ensuring effective training & development of subordinates
. Hosting daily morning meeting with O&M, Shift In-charge and Managers
Highlights:
. Successfully managed major overhauling of 27 MW SIEMENS Turbine
(Ultratech Cement Bela Plant) & 38.5 MW BHEL Turbine (JP Rewa Plant)
. Acted as Internal Auditor of IMS (Integrated Management System) at JP
Rewa Cement Rewa
. Pivotal in getting the quality circle award at national level in the year
2007
. Led implementation of:
o SAP system in JP Rewa plant in the year 2012
o Safety measures and involved in 5 stars British Safety System in JP
Rewa Cement in 2009 year
. Reduced downtime through measures such as elimination of forced
deterioration, continuous improvement initiatives and completion of
horizontal deployment activity
. Escalated Overall Operating Efficiency (OEE) by improving reliability by
predictive maintenance techniques
. Improved MTBF & MTTR by improving the skills of the manpower, projects
like faults indication panels, tools availability, programming
modifications
. Streamlined processes through measures such as Maintenance Improvement
Project (MIP) Concept by working on different blocks of maintenance
philosophies
? Trainings
. Proactive Maintenance by M/s SKF, Pune
. Quality Circle
. First Aids
. Boiler Steam Tech Seminar
. Energy Management
. SAP
. TPM Certificate Course
. Industrial Fans
. Condition Monitoring
? Professional Affiliation
. Corporate & Fellowship Member of Institutions of Engineers India Ltd.,
Kolkata & Chartered Engineer
. Professional Graduate Diploma in Management of Technology from AIMA, New
Delhi
? Education
. BE (Mechanical Engg.) from APS University, Rewa in 1992
. Diploma in Mechanical from UP Technical Board, Lucknow in 1985
? IT Skills
. Windows XP, MS Office (Word, Excel & PowerPoint) and Internet
Applications
? Personal Details
Date of Birth: 15th July 1965 Languages Known: English and Hindi
Address: H-1 Gyan Sarovar Colony, Ramghat Road, Aligarh - 202001, UP
SWADESH KUMAR GARG
Phone: +91-942******* / 724-***-****
E-Mail: **********@*****.**.**