Post Job Free
Sign in

Land Surveyor Saudi Arabia

Location:
Mecca, Saudi Arabia
Salary:
10000
Posted:
October 23, 2024

Contact this candidate

Resume:

MUHAMMAD KAMRAN

Chief SURVEYOR

Contact Details:

E-mail:*************@*****.***

Cell no;+966-*********

Cell no;+923*********

Riyadh. (K.S.A.)

IQMA: Transferrable

KSA Driving License

CAREER OBJECTIVE:-

Looking for an organization where I can professionally provide surveying functions efficiently, and utilize my technical Excellence in the field, in developing the project to the exact specifications and offer highly customized services.

Extensive Survey experience in technical and field management in A professional Land Surveyor having 13 years of Experience in surveying field Ability to use modern Surveying instruments like GPS, and other surveying tools like Total Stations High Rise & Low Rise Building Constructional Survey, Control and Grid Survey &Water Pumping Station, Infrastructure &Water Intake, Highways and small Roads, Railways, under pass Tunnel .Water Transmission Line Alignment, Water Supply Improvement Projects Survey. Town Planning and Cadastral Survey. Hydrographic and .Water Treatment Plant, Limestone and Minerals Quarry Wadi protection etc JOB EXPERIENCE IN (Kingdom of Saudi Arabia):-

+

JOB EXPERIENCE IN (Kingdom of Saudi Arabia)

Client : Ministry of Housing(Dammam)

Project : Waheet al Dammam.

Company

Duration

Position

: SAK consultant Engineering

: March 2020 to Till to

: Senior Surveyor

Project

Client

Company

Duration

Position

: Upgrading of Existing JEC Roads Project PKG 5A

: Saudi Aramco

: Azdah Contracting Company.

: Nov 2019 to March 2020

: Senior Surveyor

JOB EXPERIENCE IN (Kingdom of Saudi Arabia):-

Project : Ministry of Housing (AlQassim)

Consultant : Zuhair-Fayez Engineering

Company : Al-Omair Contracting Company

Duration : August 2019 to November 2019

Position : Surveyor Supervisor

JOB EXPERIENCE IN (Kingdom of Saudi Arabia):-

Project

Client

:

:

Road +building Infrastructure

Development

Municipality of dawadmi

Company : Municipality of Al dawadmi

Duration : November 2014 to August 2019

Position : Chief Surveyor

JOB EXPERIENCE IN (PAKISTAN):-

Project : High Way Road (Peshawar)

Client : National Engineering Services

Company : FRONTIER WORKS ORGANIZATION.

Duration : JAN 2013 to Sep 2014

Position : Senior Surveyor

JOB EXPERIENCE IN (PAKISTAN):-

: Defence Housing Authority

: FRONTIER WORKS ORGANIZATION.

: Nov 2011 to Dec 2012

Client

Company

Duration

Position

Project : Defence Housing Authority

AS A SENIOR SURVEYOR.

Layout and details Survey for Optical Fiber Cables.

Setting out and levelling, Sketching, As-built Survey, Traversing and Precise levelling for new Bench Mark.

Layout and levelling of Civil Structures & infrastructure Work’s.

Observation of X-Section, L-Section.

Check the locations of footings as per drawing.

Controlling of levels of pipe inverts.

Responsible for setting out of points of end of sleeve of pipes. Pipe lines, center line of manholes and their designed elevations and invert levels.

Setting out for future ducts as per design.

Setting out of alignment for pipeline with the co-ordinates by bearing& distance.

Setting out of Pilings, pile caps, Tie beams & Landscaping works.

Layout Earthling Cables, Electric Cables & Poles Foundation. Electric Power Lines, SPT & CPT Boreholes.

Conducting reconnaissance survey and transferring the precise MSL Levels and Co- Ordinates from survey of Pakistan and Other Govt. authorized control points (datum) to the nearest site.

Calculate the Toe points and fixing on the ground for backfilling road layers as per approved design specification. Taking road cross section for calculation cutting & filling.

Setting Out of the C/L alignment of proposed road, horizontal and vertical curves with H.I.P and P.V.I and establishing peg levels at edges, Centre and marking the locations of bridges, culverts and other road elements etc.

Transferring DMD Levels and Control Points to the Site location.

Topographic Survey & Geo technical Survey. Installation new Bench Mark Survey Points

& Traversing with GPS and Total Station. Double run levelling with digital level.

Co-ordination with Survey party chief and organizing the daily survey work routine.

Mainly to check and ensure the plot limits and Setting Out and levels carried out for various construction activities, at various stages of structure and supervise as per design, drawings and specifications provided to the contractors.

Planning horizontal and vertical controls by conducting reconnaissance survey and transferring the precise MSL Levels and Co-Ordinates from survey of Government authorized KSA Municipality control points (datum) to the nearest site locations and confirming the same by connecting to other datum.

Checking Setting out works done for water treatment plant, water intake vertical lower shaft, road, tunnel, grit chamber, NDR, Vibro Compaction, Piles for its casing Centre and Cut-off level, Grid lines, Dowels, Bolts, Sub and Super Structure’s Vertical and Horizontal elements, landscaping etc. as per design and drawing.

Pre marking points for Aerial Photography Survey, Topographic Survey, Precise Leveling.

Horizontal & Vertical Bench Mark Installation with heavy Hilti drill machine.

Shifting of survey Penetration point with plummet instrument.

AutoCAD line working and shop drawings.

Line Layout and Observation. 3-D Survey field work.

All Kinds of Survey data downloading and processing.

Check all building footings, columns, beams, slabs locations as per approved construction drawings.

Check All the Sub contractors works according to the key plan.

Check the Control Points with Sub Contractor.

High Rise & Low Rise Building Constructional Survey

Highway and Small Roads, Under Pass Tunnel, GOSP (Gas Oil Separating Plants.

Civil & MEP Installation works. Oil & Gas Refineries Construction.

CPF (Central Processing Facility) & CCF (Corridor Clean Fuels) Plant's.

Gas projects (LPG/LNG/NGL)

Oil & water Pumping Station, Water & Oil Tanks, and Power Plant.

Civil & MEP Supervision all site activities for Telecommunications Engineering.

Elements of a Topographic Survey & Cross-Section

Topographic surveys for new track construction or highway-related projects need to include the following elements.

Location of existing track center lines, Terminals, North Arrow (Magnetic or true north), Existing rail section, Location of switches (turnouts), derails, bumping posts, Culverts, bridges or other drainage structures, above ground and underground utilities, Fences, Roads, Buildings, Waterways, Milepost reference, Valuation Station reference, Right-of- way width.

Ariel Photographic Survey, Topographic Survey for new construction sites, Seismic Survey for oil and gas exploration department.

Travers survey by static GPS system compare and modifying with old control points datum.

Dewatering construction, Sheet piles installation, River diversion construction works.

Sewage Treatment Plant. River Water intake, Vertical Shaft Tunnel, Sweet Water.

Distribution Pipe Line Network, Water Main Transmission Line, water tanks, road, pipe culverts, Manholes & Grit Chamber.

Setting out oil and gas well point, setting out oil and gas all kind of pipe lines.

Traversing, Topographic survey, setting out, staking, flow line, trunk line, CP line, route marking, free hand sketch along with pipe line 50-meter corridor for feature other new design, Measurement on site wires height clearance for crossing heavy equipment.

Follow up and Co-ordinate with the contractor and work, review submittals and shop drawings for material take off and identifying, resolving design issues and providing technical support if any required, providing site measurements, progress report and site details for updating, planning

Checking the contractor’s submittals for completeness and compliance with contract requirements.

Verifying and approve completion certificates, Bills, as built Drawings.

Fixing anchor bolt on foundations for all kinds of civil & mechanical works.

Horizontal & Vertical Alignment and Levelling for (GOSP) Gas Oil Separation Plant

Assisting the engineers in site supervision, progress monitoring, quantity measurements etc. EDUCATIONAL QUALIFICATION:

S. S.S (Secondary Certificate)

Rawalpindi board of intermediate Secondary Education Rawalpindi Pakistan

3 Years Diploma of Associate Engineer (DAE)

3 Month Course Instrument GPS +Total Station and auto level COMPUTER SKILLS;

Auto cad Land Desktop

Leica Geo Office (L G O)

Trimble Business Center (T B C)

Internet

Google Earth Pro

AutoCAD

Microsoft Word, Excel, Power

point

Auto CAD Civil 3D

GEODETIC SURVEY INSTRUMENTS USED

GPS;

Trimble* GPS (4000, 4700, 5700) GPS receiver and Trimble ii Radio Modems.

Leica* GPS System (1200 & 500& CR-333, Leica Viva GS12 & Leica Viva GS14)

Garmin* GPS MAP-276C, Garmin Eertex-C, GPS 76-

Topcon* Hiper-VR

TOTAL STATION;

LEICA* (TS12&TS15 Viva Smart) TS02, TS06, TS09, TC-1600, TC-1610, TC-1700

SOKIA*(510, 610 CX 1o6, 107,,,)

PENTAX* (R305)

GEODIMETER* (400, 440, 600)

TOPCON* (GTS-225, GTS-235N)

DIGITAL LEVEL;

LEICA (Sprinter 250M, NA-2002, NA-2003, DNA3) & All Kind of Auto Levels

Programmable Calculator CASIO (602p&880P) Geo Calculator

PERSONAL PROFILE

Name in full : Muhammad Kamran

Date of Birth : 05 May 1992

Sex : Male

Nationality : Pakistani

Marital Status : Married

Language proficiency : English, Arabic, Urdu, Panjabi, Hindi, Hobbies : Hard working & i am always looking new latest technology for Surveying. Sports & reading newspapers.

Passport Details : Passport No – CC4228132

I hereby declare that the information and the facts stated here in above are true and correct to the best of my knowledge and belief.



Contact this candidate