Post Job Free
Sign in

Level 2 Co-Ordinator

Location:
Port Harcourt, Rivers, Nigeria
Posted:
October 22, 2024

Contact this candidate

Resume:

CONSTRUCTION LEAD/QUALITY CO-ORDINATOR.

ESIAGA, Chukwuemeka Eric

CONTACT ADDRESS: GSM: E-MAIL:

* ****** ****** +234********** MOBILE **********@*****.*** OFF EAST/WEST ROAD +234********** HOME **********@*****.*** BEHIND TOTAL FILLING STATION

ALONG RUMUOKORO MKT

PORT-HARCOURT. PASSPORT NUMBER; A1993650.

PERSONAL INFORMATION

Date of Birth: 4th Aug: 1974 Nationality: Nigerian. NYSC COMPLETED YES SEX: MALE

COMPUTER LITERACY:

MICROSOFT OFFICE PROGRAMMES: WORD, EXCEL, POWER POINT AND WINDOWS EDUCATION & QUALIFICATIONS:

1993/4-1998: Enugu State University of Science & Technology, B. Eng. (Hon’s), Second Class Hon’s in Metallurgical & Materials Engineering. Sept. 1991: Senior Secondary Certificate of Education (SSCE). PROFESSIONAL QUALIFICATION:

1999: Certificate in Computer Science.

2000: HSE Competence development course Level - 3 (MNISP), SPDC. Warri 2001: Certificate in Oil Field Safety Mgt. SOUTHGATE INSTITUTE 2004: Level 2 (Magnetic Particle Testing) BY BOEING AIRCRAFT COMPANY IN GHANA. ASNT 2004: Level 2 (Dye Penetrate Inspections DPI) BY BOEING AIRCRAFT COMPANY IN GHANA. ASNT 2004: Level 2 (Eddy Current Testing/Ultrasonic Scan Inspections BY BOEING AIRCRAFT COMPANY IN GHANA. ASNT

2004: (STOP) Stop Training Observation Programme. Texaco/Chevron Nig Ltd. 2005: IRATA LEVEL 1 CERT NUMBER X/13857

2006: SHE Training with MOBIL PRODUCING NIGERIA. EKET 2010: CSWIP 3.1 Cert Number; 49986 (MWJS). R /51981 2011: QMS (Internal Auditor) BNL/NGR/11/100 CERT NUMBER. 2011: RADIATION SAFETY AWARENESS TRAINING CERTIFIED. 2011: BGAS- CSWIP COATING/PAINTING 3/2 Cert Number ATC88/NIGERIA/12/07/266 2011: CERTIFIED PAINTING INSPECTOR (B.GAS – 3, CERT # 1566) FROM TWI, UK 2012: TEPNG INDUSTRIAL ERGONOMICS TRAINING CERTIFIED. 2013: MEMBER BRITISH PROJECT PROFESSIONALS SOCIETY (BDP-390-***-****) 2014: BOSIET CERTIFIED. Cert No: 208557002103140010. ( OPITO APPROVED). 2015: PRINCE 2 FOUNDATION CERTIFICATE No: 015P2F0134. (PROJECT MANAGEMENT) 2015: MICROSOFT PROJECT Cert: No: 015MSP0126 (PM planning and scheduling software) 2016: HUIET WITH CAEBS CERTIFICATION Cert No:208557002103140010 (OPITO APPROVED) 2020: 2020: OFFSHORE SAFETY PERMIT (OSP) ID: 018****-****: CERTIFIED EUROPEAN WELDING INSPECTION PRACTITIONER (in-view) PROFILE.

Articulate with analytical mind, self-motivated, versatile honest and hardworking, working under pressure, able to take challenge of set target. I have proved capable of working with minimal supervision, computer literate Professional Profile:

An Engineer, with over twenty (20) years’ experience and expertise in offshore-onshore process piping and pipeline, structural welding and fabrication, corrosion control, the use of non-destructive and destructive methods in determining weld soundness, Quality Management and Assurance. I also have skills in the use of international codes, specifications and standards, with a proficient ability in data Management system. Familiarity: I am familiar with welding processes like shielded metal arc welding (SMAW), Gas tungsten arc Welding (GTAW), Submerge arc welding (SAW), Flux core arc welding (FCAW), Metal inert Gas welding (MIG). Materials like Low and medium carbon steel, ferrites stainless steel, austenitic stainless steel, duplex pipes etcetera. I am also familiar with the use of international code such as: ASME B31.3, B31.8, API 1104, AWS D1.1, API-RP- 2X, ASME V and others, API 510, API 650 and API 620. Experience in installation/inspection of HDPE Pipeline, HDPE Pipe material & specifications. Knowledge of HDPE welding machine operation and controls. Construction supervisor.

SNR QA/QC ENGINEER / QUALITY COORDINATOR. / CONSTRUCTION SUPERVISOR SPR-C-(Sg-2)

(22.02.2021 TILL DATE)

AKK GAS PROJECT PIPELINE (614KM ) SPREAD C

Champion the Company Sites Leadership Expectations

• Champion on-site safety awareness and safe performance with contractor and among Project Team members

• Lead/assist in preparation and development of construction planning deliverables (Pre-Check Point 2)

• Interface with contractor on a day to day basis

• Provide input in the review and development of contractor’s detailed plans and procedures

• Monitor and appraise contractor’s performance and recommend corrective action to be taken where deficiencies are detected; verify actions are taken

• Coordinate resolution of construction related issues with guidance from supervisor

• Establish, implement, and maintain verification process for mechanical completion

• Utilize best practices, Comes, and other current Construction systems/tools

• Ensure appropriate materials management system is implemented at site

• Coordinate with on-site personnel regarding planning and implementation of fabrication, construction, and mechanical completion activities

• Participate in company's learned reviews and provide input to close-out report sections upon completion of work

• Ensure execution of the contract is in compliance with contract specifications

• Ensure change requests are in accordance with Management of Change Plan

• Provide input to appraisal process for assigned site personnel

• Manage the project business services and contracting and materials management organization and functional interfaces through the Execution Stage Reviews design plans, process procedures, test procedures, and quality manuals to understand the scope, requirements, and function of the problem.

• Ensures that products meet the organizations and customers quality and product integrity requirements.

• Supports the product development or operations team by providing analysis and expertise throughout the inspection process.

• Identifies root causes of problems in the production process; recommends and/or implements corrective measures.

• Analyzes data to identify trends in product quality or defects with a goal of mitigating and preventing recurrence and future defects.

• Performs other duties as assigned.

• Experienced in qualification of welding procedures, welder’s qualification, preparation of procedure and qualification records, witnessing mechanical testing, material inspection, welding inspection during fabrication, QA/QC activities, dimensional inspection, hardness testing, etc. pertaining to international codes such as ASME, AWS, API, BS etc. experienced in inspection, process piping etc, surveillance, weekly & monthly reports, onsite documentation, client liaison. Review final documentation of the project.

• Supervises the Quality Control functions\activities of a project or its parts, including Quality Control inspection schedules and the collection of all onshore Quality Records. Assesses the implementation of the project Quality Plan on site/offshore.

• Allocates Quality Control personnel to the various areas and shifts for fabrication and construction activities.

• Supervises inspections, reports and the documentation issued by inspectors and collect and file the required Quality Records.

• Evaluates the qualifications of welders and Non Destructive Test – NDT technicians with regard to the activities assigned.

• Ensures the correct application of Quality Control phases for onshore construction.

• Daily functional reporting on his responsibilities and any quality issues to assigned Project QA/QC Manager.

• Arranges in coordination with Project QA/QC Manager, and site personnel procedures, manuals and reports.

• To confirm by countersignature as applicable, that all sites activities are carried out according to referenced documentation.

• Raises Corrective Action/Non-conformance reports as required and monitors their development and resolution, in conjunction with PQE. SNEPCO (SHELL NIGERIA) BONGA FLEX JOINT REPLACEMENT AND COMMINSSIONING 12’’ PIPE. (RAYTHEON FABRICATION YARD CALABER FREE TRADE ZONE). BONGA SHUTDOWN.

JULY 8

TH

-2019 DATE. SNR QA/C Mechanical Engineer/ Coordinator Campaign Coordination and preparation of Campaign team (onshore site) Supervision offshore of the campaign team

Prepare plant and equipment maintenance to enable them to be executed in a safe and cost effective manner within the constraints of an offshore logistical environment and limited recourses.

Monitor daily the preventive and breakdown maintenance activities, rescheduling work as required.

Update SAP CMMS for maintenance inspection requirements. Liaise with the Maintenance Superintendent to ensure effective maintenance workload. Liaise with Operations, Engineering and Inspection Departments for the preparation of detailed work scope with spares and resource requirements including long lead items and vendor specialists

Participate in daily maintenance planning meeting. Fabrication and welding of weld frame 1 and 2. Fabrication and welding of the lift frame 1, 2 and 3 . Dive frame fabrication and welding equipment support frames (Handrails, Grating and Plating, ladders support stabing guide,weldframe interface frames,. All completed within the approved procedures and international codes and standards. Fabrication and welding of transport cradle frames, skids and seat fastening. COMPANY: TEPNG TOTAL EXPLORATION AND PRODUCTION NIG. OML 100 FSO UNITY.

CRUDE STORAGE TANK. (GULF OF GUINEA).

JUNE 25

TH

2018 -.JUNE 14

th

2019. FIELD MAINTENANCE / CONSTRUCTION AND

CONSTRUCTION SUPERVISOR OFFSHORE.

PRE-SHUTDOWN /SHUT DOWN IN OML 100. (ODUDU FIELD). IME PLATFORM, EDIKAN PLATFORM, AFIA PLATFORM and ODP/ODD PLATFORMS. At IME 8’’ Riser, Decommissioning and Replancement of the 8’’ pipe IME export line to EDIKAN.

Decommisioning of the coroded spools and replacement, such as flanges, spools, IME1 GAS lift manifold, pipe modifications, Gas lift scrubber outlet, support and sockets blasting and painting done.

Vessel inspections and maintenance,welding of various pipe sizes and replacement, blasting of 24’’ manway, replacing corroded LG-14-320 NOZZLES and blasting/painting. ODP1 boat landing installation and painting . ODD Vessel flanges replacement and piping. AFIA Vessel nozzle replacement and different flanges =, piping blasting and painting. REPAIR AND REPLACEMENT OF THE WATER BALLAST TANK (3WBT) Above 35m from the deck.

Replace the INCLINED LADDERS AND THE EMERGENCY EXIT PLATEFORM inside the tank.

March 19

th

2018. MECHANICAL CONSTRUCTION, STRUCTURAL & PAINTING SUPERVISOR.

OML 100-FSO UNITY CORRODED TANK WASHING LINES REPLACEMENT CAMPAIGN.

• Ensure that the work is carried out in a safe manner and in compliance with Scope of Work, approved Engineering Standards and Specifications

• Supervise construction and handover of mechanically complete systems and associated DocumentationReview and provide comments on construction method statements, material submitting, construction procedures from start of construction of project until completion and handover to end users

• To supervise the Contractors during the execution of construction activities

• Participate in reviewing detailed design drawings, method statements, material requisitions, Co-ordinate mobilization of contractors on site.

• Supervise and approve construction activities and co-ordinate various aspects of project construction including inspections, material submissions and working drawings from contractors, and processing documentation as required.

• Handle all aspects of mechanical ; piping Construction activities including site investigations, site surveys

• Supervise installation of civil Structural, Piping, mechanical equipment

• Ensure turnover documentation is accurately and efficiently delivered.

• Maintain a daily record of progress.

• Reports to supervisor work anomalies or contractual deviations committed by contractor personnel and recommend corrective actions.

• Sign work permits on behalf of company and to ensure that contractors compliance with conditions fixed on consolidated work permits

TECHNICAL PARTNERS AND LOGISTICS NIGERIA LTD, EAST/WEST ROAD PORT HARCOURT.

FABUARY 6

TH

2017: MAINTENACE METHOD ENGINEER.

• Review maintenance strategy in accordance with the Company Rules, General Specifications and Original Equipment Manufacturers

• Define the preventive maintenance schemes

• Optimize the existing preventive maintenance schemes to improve functional availability

• Exploit the data from condition monitoring and remote monitoring system with an objective to improve functional availability

• Ensure that the stock parameters of the spares correspond to the needs of availability of the equipment

• Prepare long term maintenance planning in coordination with other teams and ensure the execution of relevant activities

• Coordinate equipment operational parameters, and liaise with Equipment Manufacturers and Vendors

• Study and follow up SMR related to Maintenance

• Perform maintenance engineering and re-engineering

• Follow-up of the different action plans linked to Maintenance

• Conduct technical and operational analyses and audits related to Routine Maintenance and other related audits. Ensures the stringent application of Company directives in terms of HSE requirements in preventive maintenance scheme COMPANY: TEPNG TOTAL EXPLORATION AND PRODUCTION NIG.

(STAFF)PROJECT: OML58 UPGRADE N.O.P.L PIPELINE 36’’ PIPE. 75KM

(CURRENT) SPDC AND NGC GAS LINE.

DUTIES: QA/QC SPEC IALIST/ HEAD QC

June 1st 2014 to September 31 .2016.

• Ensuring that TEPNG quality system is established, implemented and maintained in accordance with UNI EN ISO and API standards.

• Reporting on the performance of the quality system to TEPNG management for review and as a basis for improvement of the quality system;

• Liaising with TUV, API and other external parties on matters relating to the quality system.

• To ensure that all orders are reviewed and their QA & QC requirements identified.

• To co-ordinate and control the preparation and submission of customer requested QA/QC documents.

• To co-ordinate and control all inspection activities in order to ensure that incoming product, manufactured components and finished products are in accordance with specified requirements.

• To ensure the required inspection and test records are maintained and to control all non- conforming product. Establishes, as a part of the Project QM Plan, and in compliance with the Company rules, the Site QM Plan (including audits program)

• Ensures that the Client requirements are understood by all parties.

• Acts as liaison between the CONTRACTOR and the CLIENT in matters pertaining to quality control, inspection, testing.

• Checks the Subcontractors Q.C. procedures to ensure they are consistent with Q.C. procedure.

• Performs audits (internal/external) on personnel and subcontractor personnel, to ensure they are working in compliance with their approved working procedures.

• Manage the NCR issue and follow-up.

• Recommends and follows up corrective actions to preclude internal (or external) deficiencies.

• Has a clear record of authorized administrative or contractual documents, for Subcontractor personnel.

COMPANY: TEPNG TOTAL EXPLORATION AND PRODUCTION NIG. PROJECT: OML58 UPGRADE O.U.R PIPELINE 42’’ PIPE. 45KM (CURRENT) NLNG and SPDC and NGC TIE INN.

DUTIES: HEAD QA/QC. (WELDING SPECIALIST AND QC ENGINEER) 1st March 2010 to 2014

Tie in to NLNG pipe line and the carried out Gap Ananlysis within Total Spec NLNG Spec. Rumuji.Tie inn to NGC gas pipe line with Total E and P gas line Owaza Oyibo Rivers State.

• Enforce the execution of the specific inspections on Equipment / Material as per ITP requirements

• Check that requirements set in the Inspection and Test Plan (ITP) are met at the various control points

• Support and be involved in stage review of documentation compilation

• Verify the status of the documentation posted on the working site and make sure that all the inspection personnel report any deviation

• Ensure Supplier and our client's ITP hold and witness points are properly observed and carried out, and that records in support are in-place and maintained

• Witness relevant test activity as required

• Report any other issue that might influence quality of the delivery even if not within the strict ITP scope

• Report immediately by phone or mail to the Quality Engineer any issue that might influence quality of the delivery (even if not within the strict ITP scope) CLEINT: CHEVRON NIGERIAN LIMITED (CNL) .KBR STAFF SOUTHERN GAS CONSTRUCTOR (SGC) LTD. KBR ENERGY AND CHEMICAL LTD. EGTL 1. PROJECT: ESCRAVOS. (Offshore) CURRENT PROJECT2. SEPT 2008 to 2nd JAN 2010.

MECHANICAL QA/QC LEAD.

• Provide project with a robust and simple Management system which establishes DEAWOO/ KBR and client requirements, ISO9001:2008 requirements. Administer Management system making changes and revising which continual improvement.

• Establish a Robust and proactive reporting and tracking system.

• Ensure QA and QC input activities related to each individual project scope of work determine and provide to Project SOR’s, requisitions, Packages, Fabrications for major and Minor Projects.

• Plan and manage development of existing National Team. (Nationalization Program).

• Review and implement Quality assurance requirements and processes for supply of Materials and Equipment.

• Manage and co-ordinate all inspection activities. Liaise with engineers regarding quality issues until closure.

SEMINARS: Safety Audit a management Tool, Fire drilling. Demystifying Project Management & Mastering Project Success. etc. REFEREES:

ENGR. STAN AGBAKA 080******** LOUIS CHUKWUEMEKA. 070******** PROJECT MANAGE QA/QC MANAGER

GE POWER NIGERIA LTD SAIPEM NIGERIA.



Contact this candidate