Post Job Free
Sign in

Quality Assurance Top Tier

Location:
San Bernardino, CA
Posted:
October 14, 2024

Contact this candidate

Resume:

ADOLFO A. LOPEZ

**** *. ***** ** *** Bernardino, CA. 92411

840-***-**** *************@*****.***

OBJECTIVE

To aquire a position in a top tier company that has potential for growth. As a General Electrian I want responsibility and support to succeed in whatever direction I am put in. I thrive to be the best and will represent with professionalism.

SKILLS

*Project Leadership. *Electrical Code Compliance *Commercial and Residential Projects. *Safety Procedures and Regulations. *Blueprint Fluency. *Contact Management. *Quality Assurance. *Staff Management. *New Construction *Scheduling. *Switchgear and Distribution. *Pipe Bending. *Lighting Controls. *Generators and Inverters. *Commercial and Residential Wiring. *Troubleshooting Skills. EXPERIENCE

Sparq Electrical

11/2020 - Currently

Foreman

Estinates, scope of work, manpower, budget reports, GC meetings, order material, review plans, RFI and change orders..

AJ Kirkwood

10/2019 - 11/2020

Foreman

Manpower, budget reports, GC meetings, order material, RFI, change orders, T&M tickets, inspections and. Scope of work.

RBT Electric inc

08/2017 - 10/2019

Foreman

Man power, budget reports, GC meetings, inspections, order material, RFI, change orders, T&M tickets, scope of work.

Helix Electric

06/2015 - 08/17

Lead

Assigned to Pasea Hotel in Huntington Beach. Wired hotel rooms, emt conduit, pulled wire, installed transformers, hot check, installed devices and lighting control. Assigned the Pacific City in Huntington Beach. Wired units, did layouts for rough work, attended GC meetings, ordered material, installed Ansel system in amenities buildings, installed lighting control and installed lutron Radio RA 2 system in penthouses.

IES Residential

01/2013 - 06/2015

Installer

Wired units and installed finish work in units.

Southwest Electric

12/2011 - 01/2013

Installer

Wired units and installed finish work in units

McNamee Electric

07/1995 - 10/1998

Helper

Wired houses

EDUCATION

San Bernardino Valley College

2004

Associate Degree

CERTIFICATION

Certified General Electrrician #169149

PROJECTS

Foreman

Year 2020. Big Bear Alpine Zoo- Big Bear, Ca.

AJ Kirkwood-MS Construction

As the 5th foreman taking over it was challenging. Nevertheless the prior foreman's did a fantastic job of red lining and giving detail notes on deviations of plans. Coming in with 480v primaries from Bear Valley electric was interesting. There was 8 buildings in total. Step down transformers for all. Had an veterinary building with lighting controls. Finished the project for MS Construction and the County of San Bernardino. Foreman

Year: 2018. Palos Verde Apartments. El Monte, Ca. RBT Electric-Cannon Construction. Started this project in mid 2017. This 49 units complex features an underground parking structure with a podium deck and fly deck. This project had grey water filtration so installing our duct banks(primary &secondary) there was a little deviations from the original plans. Our switchgear was inside the underground parking structure so we had to core the building. Install link seals and waterproofing inspected. We used green gate lighting controls throughout the entire building. Starting and finishing this project was a great experience for me. I have to say that when we received our certificate of occupancy. I was proud of my team. For every bad day we had. We knew ultimately this was what we all strived for. It was great team work by everyone involved. Lead

Year:2016 Pacific City. Huntington Beach, CA

Helix Electric. Bernards inc

This project is by far the biggest project I have ever been on. 500 units in a horseshoe with 3 Amenities building next to swimming pool. I was doing layouts for rough work, installing mc cable in the amenities building, Ansel system in the kitchen area of amenities. That was a challenging experience. I was asked to attend a training class at Lutron headquarters. There i was certified to install Lutron Radio RA 2 in every penthouse on the project. That's was an experience I'll never forget. Once we finished building 3 of the project. I was asked to take a team of 5 and begin working from building 6 to 5 to 4 where we would meet the other guys. So it was time for the grind and it was chase is the race against the other team. It was a great experience. Working on this project and how big it was. I'll never deal intimidated by any size of another job. I forgot to mention. We had 2 levels of underground parking on this project. I didn't get t to finish the project. But I did leave my mark.



Contact this candidate