Post Job Free
Sign in

Start Up Water Treatment

Location:
Roseville, CA
Posted:
October 10, 2024

Contact this candidate

Resume:

JACK SPOONER

CAREER SUMMARY

Employed by Kiewit pacific Co. Since July 1986

Education.

Degree Specialty Year

Physical Education Oregon State University

AA Liberal Studies Central Oregon Community College 1978-1979

Kiewit Education

School Year

Supervisory School 2000

Superintendent School 2001

Professional Registrations State

Welding Certs. Ca.

Associations Assoc. # Position Held

Washington State Fire Association.

Kiewit Experience

Project Name Title from to Description of Responsibilities

City of Antioch. Consultant. 2022 2024 Build a new Desalination Plant for the City of

Brackish Water Area Manager Antioch. Installed 4 RO Trains for the filter

Desalination Project. Ski Mechanical. System. Added 3 new pumps stations and 14 new

Shimmick. 500 plus horsepower pumps. Start up and testing

$ 70 Million Manager

Union City General 2020 2021 Replace pumps, Valves and pipe for the existing

Waste water plant Mechanical digester. Remove and replace existing Bar

Up Grades. Superintendent. Screens while the plant was still on line.

Kiewit Pacific. Start up and testing of all Pumps, Valves and

$ 60 Million Equipment. Hydro test all piping

Morgan Hill Ca. General 2019 2020 Remove and replace 30 Valves. Sizes 36''-

Calero Valve and Mechanical 72''. Set up confined space to walk through

Pipe Replacement. Superintendent miles of pipe to identify repair areas. And set up

Santa Clara Valley Kiewit Pacific. extraction points. Remove pipe and weld new

Water District $ 50 Million sections of pipe. Test all lines and valves.

Elk Grove Ca. General 2017 2019 Remove and replace Large valves from 24'' to 96''

Sacramento Regional Mechanical Set up confines space entry and exit points. Work

Waste Water Valve Superintendent in Miles of buried pipe to locate repair areas.

Replacement. Kiewit Pacific. Set up extraction teams for emergency response

Elk Grove Ca. $ 30 million. Design and build lifting devices to remove valves.

Bear River Pipe Line Mechanical 2016 2017 Set up access on a 45 degree slope, 1/4 mile long

And Bridge Superintendent on both sides of the bear river. To remove old

Replacement. $ 45 Million cable stay bridge and pipe line. Lower a 200

ton crane to access demolition and setting the

new bridge and pipe. Ran 36'' HDPE both sides.

Santa Theresa Water Mechanical 2015 2016 Instalation of new Floride system to replace old

Treatment Plant Superintendent. Cloride system. Hydro test system and start up.

San Jose Ca. $ 30 Million.

Bart Rail Extention Mechanical 2015 2015 Instalation of all mechanical equipment at 7

Milpitas Cal. Superintendent. new Bart rail stations.

$200 million.

Waterford Water General. 2014 2014 Complete startup of a new water treatment

Treatment Plant. Superintendent. that was mothballed for a few years. Replace

Waterford Ca. $20 Million . seals and gaskets in all valves. Disinfect and

clorinate all pipes. Retest all pipe lines. Set up

large Diesel pumps and Temporary piping to

run the plant for a 30 day test prior to start up

Finish sulfuric acid injection piping. Finish new

filter system and install filter modules

Harry Tracy Water Mechanical 2013 2014 Install all new water lines. Chemical lines.

Treatment Plant Superintendent. Tested and Disinfected all lines. 1'' pipe up to

San Bruno Ca. $300 Million 96'' pipe. Installed new pumps and Mechanical

equipment at existing plant. Did Testing and

alignment of all mechanical equipment.

Crystal Springs Pump Mechanical 2011 2013 Install new water lines, Chemical lines, New

Station. superintendent. Pumps and all Equipment at the base of existing

San Mateo Ca. $180 Million. Dam. Refurbish and replace pipe in 3 tunnels

feeding new pump station. Refurbish 11 mile of

underground pipe. Sizes 60'' to 96'' pipe. Build

new pump station to pump water to Harry Tracy

treatment Plant.

Bright water Influent Mechanical and 2009 2011 Install all piping and and mechanical equipment

Pump Station. Civil Superintendent. Install 4 each 750 HP Pumps and 4 each 1500 HP

Bothell Washington. $ 92 Million pumps inside the 2 new 100 by 150 deep pump

Stations. Did all start up and testing of the pipe.

Tied in 6 intry ports from 6 different tunnels.

Ethanol Plant Gen. Mechanical 2008 2009 Built 8 each 2,000,000 gallon Stainless Steel tanks

Aurora Ne. Superintendent. 20 each 500,000 gallon tanks. Installed 350 pumps

80 office staff Various sizes. Installed 10 each 150,000 pound

250 Employees Evaporators. Installed 160,000 feet of stainless

$ 210 Million steel pipe. Sizes 1/2'' to 60'' pipe. Over 1,000

Valves. 100's of large pipe racks.

Sac Regional Primary General 2007 2008 Managed daily operations of the grit handling

Grit Handling Area. Superintendent. operations. Replaces all chain and flight in 12

Elk Grove Ca. Primary grit tanks. Replaces all drives and other

equipment at existing plant. Did all Testing.

San Jose Sewer General Foreman 2006 2007 Incharge of all field operations for the

Treatment Plant. $ 90 Million. construction of a new pump station to service

San Jose CA. 3 new 1,400 HP pumps. Installed pipe, 60'' to 120''

in a 80' deep coffer dam. Built a metal slide rail

system to push in the 120'' pipes. Lowered a

D-4 Cat to push the joints together. Designed

means and methods to install pipe.

Sacramento Regional General Foreman 2005 2006 Installed new water filter system and all piping

Water Treatment $ 85 Million and Equipment. Installed new piping and pumps

Plant for the new Clorine systems. Did all testing

and start up. Managed all welding

Penitencia water General Foreman 2004 2005 Supervised all operations of the new Oxygen

Treatment Plant $ 50 Million Ozone system and new Ozone generator. With

San Jose Ca. new air tight Ozone tanks. Managed instalation

of under ground and above ground piping and

equipment, all pumps and helped with testing

and all start up. Managed and welded pipe

Pleasant Grove Mechanical 2001 2004 Managed mechanical portion of a brand new

Wastewater Superintendent waste water plant. Above ground and under

Treatment Plant General Foreman ground. Built new Clarifiers, Chlorine basins,

$ 100 Million new bar screen building and 10 other pump

stations and filter basin. Welded under ground

pipe and tested all pipe along with startup

Level 3 Communications Area Manager 1998 2001 Supervised all instalation of the conduit for 12

San Jose Ca. General fiber optic communication conduits from San

Superintendent Jose to Los Angles. Cleared 400 miles of right

$ 111 Million of way through every kind of terrian possible.

Managed all Pot Hole, Plowing train, Back fill,

Tie-in, Proofing and Blowing crew and Boring

Subs.

Ski Mechanical Owner 1997 1998 Installed Piping, Equipment, Pumps, Grinders,

Blowers, Scrubbers, Chemical systems and other

Treatment plant equipment. Installed chemical

lines, such as Chlorine, Sulfur Dioxide, Sodium

Hypochloride, Sulfuricacid,Sodium Bisulfate,

Ozone, Oxygen and others. Managed welding

and testing of pipe and Equipment.

Pacifica Water Superintendent 1997 1997 Instalation of all above ground and under

Treatment Plant. Mountain ground pipe. 36'' 48'' HDPE. Did all testing and

Mechanical start up

Stockton Wastewater General Foreman 1996 1997 Ran all work for 2 new large Digesters. Installed

Treatment Plant all Piping, Pumps and equipment. Welded pipe

Stockton Ca. and did all testing and helped with startup

Vallejo Water General Foreman 1995 1997 Installed 5 Belt presses,Pumps, Tanks. Sulfuic acid

Treatment Plant Kiewit Pacific System.Polymer system. Large storage hopper for

Sludge. Did all testing and welding.

San Mateo Water General Foreman. 1993 1995 installed new Steel Digester and Co-Gen Power

Treatment Plant. Kiewit Pacific Plant.Installed all Pumps, Piping and Equipment.

Did Most welding and helped with testing, startup

Oakland Waste Water General Foreman 1991 1993 Install new Pumps. 4 each 1200 HP and 4 each 1500

Treatment Plant Kiewit Pacific at out fall pump station. Install all piping and

Oakland CA. welded it. New Sulfuric Acid System and new

Chlorine System. Demoed and installed bar Screen

Pear Blossom Pump General Foreman 1990 1990 Install 2 Miles of 154'' Water line. Did Ex, Lay and

Station. C.R. Fedrick Backfill for Los Angles County

Palmdale Ca.

Callero Pipe Line General Foreman 1988 1990 Install 6 Miles of 78'' Steel Welded C-200 pipe. Cleared

Santa Claria County C.R. Fedrick. Right of way. Ex, Laid and Backfilled. Tested all pipe

Ker McGee Power PlantGeneral Foreman 1988 1988 Install 12 miles of high pressure fire loop for Chemical

Trona Ca. Kiewit Pacific Plant. 18'' Ductile and 60'' C-200. Welded and tested.

Santa Theresa Water General Foreman 1986 1988 Helped build a new 50 Million gallon a day water treatment

Treatment Plant. Kiewit Pacific Plant. 2 miles of 72'' Pipe inside a tunnel. 4 Miles of steel

Welded pipe. 24'' to 96'' C-200. 2 New above ground filter

Gallery. Did all welding and Testing . Helped with startup.

Other Experience.

Advanced Arc Welding Foreman 1984 1986 Learned how to weld. Got certified in Stick, Mig and Tig

Berkeley Ca. welding. Learned how to weld pipe.

Metal Building Alt. Iron worker 1982 1984 Learned how to build metal framed buildings. Started to

Berkeley Ca. learn how to weld

Drew Refinery Mill Wright 1981 1982 Was a mill wright in a gold and silver refining Company.

Berkeley Ca.

MGM hotel Manager of Valet 1980 1981 Parked cars for the MGM Grand Hotel.

Reno NV. Parking.

Pine Products Mill Wright, Oiler 1977 1980 Helped keep a saw mill running. Learned how to run all

Lumber mill. equipment in the mill and keep it oiled and running.

Boyd Hoskinson Logging Tree faller, Bucker 1976 1977 Fell timber in the woods and bucked as a lumber Jack.

350 pumps

water treatment

Miles of steel

e ground filter

with startup.

s. Started to



Contact this candidate