JACK SPOONER
CAREER SUMMARY
Employed by Kiewit pacific Co. Since July 1986
Education.
Degree Specialty Year
Physical Education Oregon State University
AA Liberal Studies Central Oregon Community College 1978-1979
Kiewit Education
School Year
Supervisory School 2000
Superintendent School 2001
Professional Registrations State
Welding Certs. Ca.
Associations Assoc. # Position Held
Washington State Fire Association.
Kiewit Experience
Project Name Title from to Description of Responsibilities
City of Antioch. Consultant. 2022 2024 Build a new Desalination Plant for the City of
Brackish Water Area Manager Antioch. Installed 4 RO Trains for the filter
Desalination Project. Ski Mechanical. System. Added 3 new pumps stations and 14 new
Shimmick. 500 plus horsepower pumps. Start up and testing
$ 70 Million Manager
Union City General 2020 2021 Replace pumps, Valves and pipe for the existing
Waste water plant Mechanical digester. Remove and replace existing Bar
Up Grades. Superintendent. Screens while the plant was still on line.
Kiewit Pacific. Start up and testing of all Pumps, Valves and
$ 60 Million Equipment. Hydro test all piping
Morgan Hill Ca. General 2019 2020 Remove and replace 30 Valves. Sizes 36''-
Calero Valve and Mechanical 72''. Set up confined space to walk through
Pipe Replacement. Superintendent miles of pipe to identify repair areas. And set up
Santa Clara Valley Kiewit Pacific. extraction points. Remove pipe and weld new
Water District $ 50 Million sections of pipe. Test all lines and valves.
Elk Grove Ca. General 2017 2019 Remove and replace Large valves from 24'' to 96''
Sacramento Regional Mechanical Set up confines space entry and exit points. Work
Waste Water Valve Superintendent in Miles of buried pipe to locate repair areas.
Replacement. Kiewit Pacific. Set up extraction teams for emergency response
Elk Grove Ca. $ 30 million. Design and build lifting devices to remove valves.
Bear River Pipe Line Mechanical 2016 2017 Set up access on a 45 degree slope, 1/4 mile long
And Bridge Superintendent on both sides of the bear river. To remove old
Replacement. $ 45 Million cable stay bridge and pipe line. Lower a 200
ton crane to access demolition and setting the
new bridge and pipe. Ran 36'' HDPE both sides.
Santa Theresa Water Mechanical 2015 2016 Instalation of new Floride system to replace old
Treatment Plant Superintendent. Cloride system. Hydro test system and start up.
San Jose Ca. $ 30 Million.
Bart Rail Extention Mechanical 2015 2015 Instalation of all mechanical equipment at 7
Milpitas Cal. Superintendent. new Bart rail stations.
$200 million.
Waterford Water General. 2014 2014 Complete startup of a new water treatment
Treatment Plant. Superintendent. that was mothballed for a few years. Replace
Waterford Ca. $20 Million . seals and gaskets in all valves. Disinfect and
clorinate all pipes. Retest all pipe lines. Set up
large Diesel pumps and Temporary piping to
run the plant for a 30 day test prior to start up
Finish sulfuric acid injection piping. Finish new
filter system and install filter modules
Harry Tracy Water Mechanical 2013 2014 Install all new water lines. Chemical lines.
Treatment Plant Superintendent. Tested and Disinfected all lines. 1'' pipe up to
San Bruno Ca. $300 Million 96'' pipe. Installed new pumps and Mechanical
equipment at existing plant. Did Testing and
alignment of all mechanical equipment.
Crystal Springs Pump Mechanical 2011 2013 Install new water lines, Chemical lines, New
Station. superintendent. Pumps and all Equipment at the base of existing
San Mateo Ca. $180 Million. Dam. Refurbish and replace pipe in 3 tunnels
feeding new pump station. Refurbish 11 mile of
underground pipe. Sizes 60'' to 96'' pipe. Build
new pump station to pump water to Harry Tracy
treatment Plant.
Bright water Influent Mechanical and 2009 2011 Install all piping and and mechanical equipment
Pump Station. Civil Superintendent. Install 4 each 750 HP Pumps and 4 each 1500 HP
Bothell Washington. $ 92 Million pumps inside the 2 new 100 by 150 deep pump
Stations. Did all start up and testing of the pipe.
Tied in 6 intry ports from 6 different tunnels.
Ethanol Plant Gen. Mechanical 2008 2009 Built 8 each 2,000,000 gallon Stainless Steel tanks
Aurora Ne. Superintendent. 20 each 500,000 gallon tanks. Installed 350 pumps
80 office staff Various sizes. Installed 10 each 150,000 pound
250 Employees Evaporators. Installed 160,000 feet of stainless
$ 210 Million steel pipe. Sizes 1/2'' to 60'' pipe. Over 1,000
Valves. 100's of large pipe racks.
Sac Regional Primary General 2007 2008 Managed daily operations of the grit handling
Grit Handling Area. Superintendent. operations. Replaces all chain and flight in 12
Elk Grove Ca. Primary grit tanks. Replaces all drives and other
equipment at existing plant. Did all Testing.
San Jose Sewer General Foreman 2006 2007 Incharge of all field operations for the
Treatment Plant. $ 90 Million. construction of a new pump station to service
San Jose CA. 3 new 1,400 HP pumps. Installed pipe, 60'' to 120''
in a 80' deep coffer dam. Built a metal slide rail
system to push in the 120'' pipes. Lowered a
D-4 Cat to push the joints together. Designed
means and methods to install pipe.
Sacramento Regional General Foreman 2005 2006 Installed new water filter system and all piping
Water Treatment $ 85 Million and Equipment. Installed new piping and pumps
Plant for the new Clorine systems. Did all testing
and start up. Managed all welding
Penitencia water General Foreman 2004 2005 Supervised all operations of the new Oxygen
Treatment Plant $ 50 Million Ozone system and new Ozone generator. With
San Jose Ca. new air tight Ozone tanks. Managed instalation
of under ground and above ground piping and
equipment, all pumps and helped with testing
and all start up. Managed and welded pipe
Pleasant Grove Mechanical 2001 2004 Managed mechanical portion of a brand new
Wastewater Superintendent waste water plant. Above ground and under
Treatment Plant General Foreman ground. Built new Clarifiers, Chlorine basins,
$ 100 Million new bar screen building and 10 other pump
stations and filter basin. Welded under ground
pipe and tested all pipe along with startup
Level 3 Communications Area Manager 1998 2001 Supervised all instalation of the conduit for 12
San Jose Ca. General fiber optic communication conduits from San
Superintendent Jose to Los Angles. Cleared 400 miles of right
$ 111 Million of way through every kind of terrian possible.
Managed all Pot Hole, Plowing train, Back fill,
Tie-in, Proofing and Blowing crew and Boring
Subs.
Ski Mechanical Owner 1997 1998 Installed Piping, Equipment, Pumps, Grinders,
Blowers, Scrubbers, Chemical systems and other
Treatment plant equipment. Installed chemical
lines, such as Chlorine, Sulfur Dioxide, Sodium
Hypochloride, Sulfuricacid,Sodium Bisulfate,
Ozone, Oxygen and others. Managed welding
and testing of pipe and Equipment.
Pacifica Water Superintendent 1997 1997 Instalation of all above ground and under
Treatment Plant. Mountain ground pipe. 36'' 48'' HDPE. Did all testing and
Mechanical start up
Stockton Wastewater General Foreman 1996 1997 Ran all work for 2 new large Digesters. Installed
Treatment Plant all Piping, Pumps and equipment. Welded pipe
Stockton Ca. and did all testing and helped with startup
Vallejo Water General Foreman 1995 1997 Installed 5 Belt presses,Pumps, Tanks. Sulfuic acid
Treatment Plant Kiewit Pacific System.Polymer system. Large storage hopper for
Sludge. Did all testing and welding.
San Mateo Water General Foreman. 1993 1995 installed new Steel Digester and Co-Gen Power
Treatment Plant. Kiewit Pacific Plant.Installed all Pumps, Piping and Equipment.
Did Most welding and helped with testing, startup
Oakland Waste Water General Foreman 1991 1993 Install new Pumps. 4 each 1200 HP and 4 each 1500
Treatment Plant Kiewit Pacific at out fall pump station. Install all piping and
Oakland CA. welded it. New Sulfuric Acid System and new
Chlorine System. Demoed and installed bar Screen
Pear Blossom Pump General Foreman 1990 1990 Install 2 Miles of 154'' Water line. Did Ex, Lay and
Station. C.R. Fedrick Backfill for Los Angles County
Palmdale Ca.
Callero Pipe Line General Foreman 1988 1990 Install 6 Miles of 78'' Steel Welded C-200 pipe. Cleared
Santa Claria County C.R. Fedrick. Right of way. Ex, Laid and Backfilled. Tested all pipe
Ker McGee Power PlantGeneral Foreman 1988 1988 Install 12 miles of high pressure fire loop for Chemical
Trona Ca. Kiewit Pacific Plant. 18'' Ductile and 60'' C-200. Welded and tested.
Santa Theresa Water General Foreman 1986 1988 Helped build a new 50 Million gallon a day water treatment
Treatment Plant. Kiewit Pacific Plant. 2 miles of 72'' Pipe inside a tunnel. 4 Miles of steel
Welded pipe. 24'' to 96'' C-200. 2 New above ground filter
Gallery. Did all welding and Testing . Helped with startup.
Other Experience.
Advanced Arc Welding Foreman 1984 1986 Learned how to weld. Got certified in Stick, Mig and Tig
Berkeley Ca. welding. Learned how to weld pipe.
Metal Building Alt. Iron worker 1982 1984 Learned how to build metal framed buildings. Started to
Berkeley Ca. learn how to weld
Drew Refinery Mill Wright 1981 1982 Was a mill wright in a gold and silver refining Company.
Berkeley Ca.
MGM hotel Manager of Valet 1980 1981 Parked cars for the MGM Grand Hotel.
Reno NV. Parking.
Pine Products Mill Wright, Oiler 1977 1980 Helped keep a saw mill running. Learned how to run all
Lumber mill. equipment in the mill and keep it oiled and running.
Boyd Hoskinson Logging Tree faller, Bucker 1976 1977 Fell timber in the woods and bucked as a lumber Jack.
350 pumps
water treatment
Miles of steel
e ground filter
with startup.