I am Malaysian citizen I have Over 20 years’ work experience since 1992, work at Offshore / Onshore Oil & Gas Industries, Oil Refinery, Petroleum Industry, LNG Gas Plant, Marine & Shipyard, Oil Vessel Tanker, FSO/ FPSO Vessel, Topside module & Floating Vessel, Petro chemical Pant, Generation Power Plant, Sub-station Power Plant and Manufacturing plant.
To obtain a position as Senior Electrical & Instrument Supervisor /QA QC Inspector experienced in Project Management Team Engineering & Construction and utilize my technical experiences and benefit both the company and myself that got high capacity tasks and advancement.
QUALIFICATION HIGHLIGHTS
My working experiences mostly related to Project Management (PMT) expertise in electrical & instrumentation with project engineering & construction module top side, EPC, EPCC & EPCIC, EPCM and M&E services, loading/unloading, repair maintenance, marine conversion & refurbishment.
Familiar with engineering drawing such as Process and Instrumentation Diagram (P&ID), Single Line Diagram (SLD) and Process Flow Diagram (PFD).
Ability to review General Arrangement (GA), and engineering documents
My specialties field line project management, monitoring & supervising,field technical, QA/QC, Inspection, Pre-com & comessioning and maintenance, with extensive experience at electrical & instrument FEEDS design field engineering, field site working project management, construction & installation,Inspection service.
My keys skill at construction fabrication, installation, inspection, calibration, Pre-com &comessioning testing service coordination, MTO & material coordinator work.
Present I work with CPP Petroleum Engineering (M) Sdn, Bhd, Engineering & Construction at Petronas Rapid Project Pengerang package 14 as Electrical & Instrument Pre-com & commissioning QA/QC Inspector.
Before I work with Jacobs Engineering (M) SDN BHD at Gebeng Industrial Estate Kuantan Pahang (KRP Project). Project turnover package system Inspector, field inspection and completion work, engineering & construction, site working and coordination, project management and QA/QC Services.
Previously I join BASF (M) Sdn. Bhd Johor Port Free Duty, Pasir Gudang Johor and working as project coordinator & maintenance supervisor. Assist monitoring project field engineering, site working and coordination, project management and plant maintenance.
Desired skill professional experience at SHELL SMDS (M) Sdn Bhd Tanjong Kidurong Bintulu, Sarawak
Work as field line monitoring & supervising electrical & instrument work engineering, field technical / inspector fabrication, installation, inspection, calibration, testing and commissioning, MTO & material coordinator and plant maintenance.
Broad experience in collaborative and independent research and evaluation, including interviewing and surveying, plant and upgrading, testing, writing and editing.
Experience Instrumentation field work:
Field Check AFC / IFC drawing instrument process & control System schematic drawing, location layout, routing modification base on designs drawing.
Familiar with engineering drawing such as Process and Instrumentation Diagram (P&ID), Single Line Diagram (SLD) and Process Flow Diagram (PFD).
Ability to review General Arrangement (GA), and engineering documents.
Installation instrument device, fire & gas system, fire alarm, P A system, security alarm system, emergency response system.
Installation and cable pulling internal telephone system, CCTV system, UHF&VHF system.
Installation topside pressure instrumentation, vessel cargo signal alarm system, O2 & CO2 system, level alarm system, inert gas system, gas analyzers system.
Monitor tubing running, tubing leak test, line check, tank gauging system, and airline process control systems activities.
Dissemble & assemble control valves, overhaul, service and repair, leak test, calibrate and strokes functional test.
Assist work at site related with instrument testing solenoid valve, safety valve, pressure relief valve, blip valve, pressure gauge etc.
Monitoring cable heat trussing, loop check, continuity test, trouble shooting,
Monitor and supervise doing instrument testing and commissioning.
Hydro-test pipe sea water line system, RIG accumulator pipe system, MUD drilling pipe separator system.
Pressure test drilling pressure vessel storage tank system, drilling control panel machine system.
Experience Electrical field work:
Field check AFC / IFC drawing electrical process & control system, schematic drawing, location layout, routing modification base on designs drawing.
Monitor installation and alignment gas turbine generator, gas turbine compressor,
Monitor installation and alignment power generator & emergency switchboards, main switchboards, transformers, switch gear, battery and UPS system.
Monitor & supervise panel installation at sub-station & E-house HV&LV voltage, AC &DC voltage, lighting small power, ground system, HVAC system, AC & DC regulator, pump& motor.
Monitor & supervise installation normal lighting panel & emergency lighting panel and junction box looping cable.
Assist and participate monitoring line check, installation crane control system, PLC, DCS, ECS, ICSS, UPS, PCSS system, including COCC and MCC system.
Monitoring cable pulling, insulation test, megger test, loop check, high pot test, current injection test, continuity test, glanding and termination, troubleshooting lighting small power.
Monitor and supervise contractor worker at site mobilization, materials inspection, fabrication, installation, testing and commissioning.
RECENTLY WORK EXPERIENCE
SHELL SMDS (M) SDN, BHD
Tanjung Kidurong Bintulu Sarawak
JUNE. 2023– AUG. 2023
Lead Instrument Supervisor
RE-Rotating Equipment (PTA Turnaround 2023)
Representative Vendors Plant Project Management Team Shutdown/Turnaround 2023 (Client Shell SMDS).
RE-Rotating Equipment Plant Machine Steam Turbine & Gas Compressor.
Access contractor to removed instrument equipment control and mechanical equipment.
Remove and replacement instrument Journal bearing and trust bearing Temperature Sensor and calibration.
Function test temperature sensor and temperature transmitter sensitivity to MPS Panel room
Remove and replacement instrument vibration probe sensor axial & radial and proxy-meter.
Function test proxy-meter sensor and cable sensitivity and setting power to 10m volt DC.
Calibrate and function test sensitivity vibration probe senor to MPS Panel room.
Calibrate Pressure gauge and Temperature Gauge system.
Testing the existing speed sensor and gap reading measurement.
Bum test Turbine rotor get reading away and toward to get the reading are center (8.89 -11.0m Volt DC) within clearance acceptance and measurement should align with instrument control system.
Upgrade ACS panel System and UPS.
Install and removed old panel system MPS cable pulling, cable termination, cable looping and function test.
To supervise and coordinate project work within area of discipline in accordance with contract conditions, working within budget and time constraints to ensure customer satisfaction.
Handles and supervises all electrical & instrument works and ensures that installation activities are complying with contractual obligations and quality control standards.
Monitoring and supervising electrical & instrument activities carried at shell MDS manufacturing plant and subcontractor during construction.
Make sure verifies and comments contractor or subcontractors’ shop drawings, design drawings, installation & fabrication procedures and methodologies are the Sam
To perform engineering checks for electrical & instrument documents like datasheets P&ID design drawing & engineering requirements and specification.
Plant total electrical & instrument equipment’s installations and co-ordination with other departments.
PREVIOUS EXPERIENCE
Willmar Snack Food Manufacturing Factory
MAY. 2021 – SEPT. 2021
Kawasan Perindustrian II, Pontian Johor Malaysia.
Plant Project Supervisor/ Project Coordinator
Project Management with engineering drawing Process and Instrumentation Diagram (P&ID), Single Line Diagram (SLD) and Process Flow Diagram (PFD).
Adding con-process food snack mixer and equipment.
Installation new instrument and control equipment.
Installation instrument float indicator sensor, temperature sensor, transmitter, Flow indicator sensor.
Installation cable conduit, cable routing and cable tray, cable pulling, cable termination.
Installation of switch board panel and control panel.
Installation of motor and function test.
System loop check and running, testing, control button function, start stop indication monitoring and functioning.
Handles instrument works and ensures that installation activities are complying with quality control standards.
OUI/CPP Petroleum Engineering (M) Sdn Bhd
FEB. 2018 – DIS. 2019
QA/QC Inspector
E&I Pre-Com.
Petronas Rapid Project Package 14 – Utilities, Interconnecting, offsite Units
To Monitor and coordinate project work within area of discipline in accordance with contract conditions, working within budget and time constraints to ensure customer satisfaction.
Experience in Oil and Gas Industry and four (4) years in SAP Plant Maintenance Module
Experienced in Project Management and familiar with engineering drawing such as Process and Instrumentation Diagram (P&ID), Single Line Diagram (SLD) and Process Flow Diagram (PFD).
Ability to review General Arrangement (GA), and engineering documents such as Dossier and Spare Part.
Handles and inspect all electrical works and ensures that installation activities are complying with contractual obligations and quality control standards.
Monitor and Inspection installation HV&LV panel substation, power motor, utility, generator, transformers, switch gear, battery and UPS system.
Monitor and Inspection panel at MCC & Switch gear room, sub-station, HV&LV voltage, AC &DC voltage, lighting small power normal lighting & emergency lighting, lightening protection, catholic protection, ground system, HVAC System, AC & DC regulator pump& motor.
Assist and participate monitoring line check, inspection, DCS, ECS and PCSS system, including MCC control system.
Assist monitoring Inspection EDG motor DAR/Polarization Index testing.
Assist monitoring Inspection VAC/VDC motor DAR/Polarization Index testing.
Inspection and testing sub-station panel feeder, vacuum & breaker functioning contact and resistance test.
Pre-com & commissioning functioning test HV&LV relay and earth fault running test.
To monitor and inspect of transformer 33kv/11kv and 3.3kv CT/VT ratio measurement reading test.
Monitoring pressure test HV Panel bus bar and cable testing.
Assist monitoring Cable hi-pot testing and functioning.
To ensure handle all Electrical QCF are complete submitted before testing and energizing startup are performed and pre-com.
To handle procurement activities relating to contracts and sub contracts in accordance with Company’s Procedures and Procurement department activities.
JACOBS ENGINEERING GROUP MALAYSIA SDN BHD
APRIL. 2017 – JUNE. 2017
Mechanical / Piping Turnover Inspector
Project Eastman Kuantan Risin Plant (KRP & K2C)
Representatives JE and EASTMAN inspection and supervising piping & instrument activities carried at KRP subcontractor during construction.
Expedite and monitoring field fabrication, installation and clear all punch list raise by client follow TOS technical requirements standards spec.
Experience in Oil and Gas Industry and four (4) years in SAP Plant Maintenance Module
Experienced in Project Management and familiar with engineering drawing such as Process and Instrumentation Diagram (P&ID), Single Line Diagram (SLD) and Process Flow Diagram (PFD).
Ability to review General Arrangement (GA), and engineering documents such as Dossier and Spare Part.
Make sure verifies and comments contractor or subcontractors’ shop drawings, design drawings, installation & fabrication procedures and methodologies are the same.
To ensure safety standards and procedures are implemented and followed in accordance with contract requirements and company guidelines.
To review and evaluate technical submittal and shop drawings prior to submission to consultants and clients according to required project standards.
Carry out technical/produce technical TOS report, engineering standards and procedures development of piping KRP participate in proposal activities as required.
Assists JE and EASTMAN job holder participates to routine and random inspections and audits, assists to daily / regular construction meetings contractor or subcontractors performs.
Managing site inspection with subcontractor works and progress.
Co-ordinating with project coordinator and engineering department for inspection necessary implementation.
BASF (M) SDN, BHD PASIR GUDANG
JULY. 2016 – SEPT. 2016
Senior Plant Maintenance Supervisor/ Project Coordinator
Pasir Gudang Free Duty Port Johor Malaysia
To support project and maintenance team in providing service for other departments at the PPC plant production, plant laboratory, plant maintenance & project inspection.
Experienced and familiar with engineering drawing such as Process and Instrumentation Diagram (P&ID), Single Line Diagram (SLD) and Process Flow Diagram (PFD).
Ability to review General Arrangement (GA), and engineering documents such as Dossier and Spare Part Interchangeability Record (SPIR) is an added advantage.
Experienced in PMMS SAP Plant Maintenance (PM) module which includes Asset master data as per BASF Upstream Data Minimum Standard (UDMS), Work Planning & Scheduling (WPS) work process as per BASF WPS manual and utilizing mass SAP upload template.
To monitor plant execution, plant maintenance & additional project work and close all the gaps found in last GU audit.
To ensure safety standards and procedures are implemented and followed in accordance with contract requirements and company guidelines.
To review and evaluate technical submittal and shop drawings prior to submission to consultants and clients according to required project standards.
Managing site work activity, inspection, subcontractor works and progress.
Prepares periodical progress reports such as weekly/biweekly, monthly, project inspection and close out reports.
Drafting, controlling and managing the records of PM daily progress, MOCs document, TOCs documents.
Finding and resolve problem root cause analysis for any plant breakdown.
Reviewing and updating preventive maintenance works instructions.
Reviewing, updating and issuing existing and new HIRARC (Hazards
Identifications, Risk assessment, and Risk Control) and EASI (Environmental Aspects and Significant Impacts).
Maintaining and updating P&IDs, drawing & design engineering.
SHELL SMDS (M) SDN, BHD
JUNE. 2015 – MAR. 2016
Electrical & Instrument Supervisor/Engineer
PTA Turnaround 2015 & 2016
Tanjung Kidurong, Bintulu Sarawak
Representative owner client shell plant project management team rejuv.& shutdown / turnaround 2015 & 2016.
Reviewing, updating and issuing existing and new HIRARC (Hazards
Identifications, Risk assessment, and Risk Control) and EASI (Environmental Aspects and Significant Impacts).
Experienced in PMMS SAP Plant Maintenance (PM) module which includes Asset master data as per shell Upstream Data Minimum Standard (UDMS), Work Planning & Scheduling (WPS) work process as per shell (WPS) manual and utilizing mass (SAP) upload template.
Experienced in providing SAP PM technical support and assisting PMMS SAP training to users
To supervise and coordinate project work within area of discipline in accordance with contract conditions, working within budget and time constraints to ensure customer satisfaction.
Handles and supervises all electrical & instrument works and ensures that installation activities are complying with contractual obligations and quality control standards.
To handle procurement activities relating to contracts and sub contracts in accordance with Company’s Procedures and Procurement department activities.
Monitoring and supervising electrical & instrument activities carried at shell MDS manufacturing plant and subcontractor during construction.
Make sure verifies and comments contractor or subcontractors’ shop drawings, design drawings, installation & fabrication procedures and methodologies are the same.
To undertake main cont. & sub cont. team briefings and inception activities to ensure all aspects of work are understood by all concerned parties.
To perform engineering checks for electrical & instrument documents like datasheets P&ID design drawing & engineering requirements and specification.
Material and stocking shelves with merchandise
Plant total electrical & instrument equipments installations and co-ordination with other departments.
Electrical drawing & instrument CEIG approval coordinate with State electrical board.
EVERSENDAI OIL&GAS SDN BHD
MAR. 2015 – JUNE. 2015
QA/QC Piping / Engineer
Phase II Tanjung Bin (4 X 1000 KWH) Coal Power Plant Johor, Malaysia
Responsibility Project QA/QC inspection team looks after pipe rack piping fabrication & erection, tie in installation and inspection coordination.
Highly skill technical support, P&ID drawing, line diagrams layout, piping instrument diagram system, design drawing, location layout, block diagrams, typical details, valves hook-up piping & mechanical general equipment layout.
Experience in Oil and Gas Industry and in SAP Plant Maintenance Module
Experienced in Project Management and familiar with engineering drawing such as Process and Instrumentation Diagram (P&ID), Single Line Diagram (SLD) and Process Flow Diagram (PFD).
Ability to review General Arrangement (GA) and engineering documents.
Doing inspection indoor/outdoor piping welding work, site and workshop, valve and mechanical work Inspection coordination.
Monitor and check P&ID drawing, line layout, piping, mechanical, instrument and design work follow client requirement Malakoff.
Carry out technical/produce report, engineering standards and procedures.
Field monitoring, QA/QC coordinator, warehouse material, yard & workshop coordinator.
Monitor assembles valves inspection, service check, repair and replacement part, welding inspection, pressure leak test.
Assist work at site related with quality inspection, testing valve, solenoid, safety valve, pressure relief valve, blip valve, pressure gauge etc.
Field QA/QC control piping installation diagram system, design drawing & delivered detail drawing, line diagrams, location layout, block diagrams, P&ID, typical details, hook-up, general equipment layout.
Monitor & supervise contractor and worker at site fit-up, fabrication, installation, materials inspection, testing and commissioning.
To ensure safety standards and procedures are implemented and followed in accordance with contract requirements and company guidelines.
To review and evaluate technical submittal and shop drawings prior to submission to consultants and clients according to required project standards.
Managing site quality piping welding and erection subcontractor works and progress.
WJMA/LOTTE E&C
JULY. 2014 – NOV. 2014
E&I Superintendent
MALAYSIAN SYNTHETIC RUBBER Plant (MSR) R1
Tanjung Langsat Johor, Malaysia
To Supervise and coordinate project work within area of discipline in accordance with contract conditions, working within budget and time constraints to ensure customer satisfaction.
Ensure compliance to the work/project standard and timeline
Submit monthly report to COMPANY
Quality check of asset master data.
Handles and supervises all electrical & instrument works and ensures that installation activities are complying with contractual obligations and quality control standards.
Monitor and supervise installation panel substation, power motor, utility, generator, influent gas turbine compressor, transformers, switch gear, battery and UPS system.
Supervise installation panel at MCC&CCR room, sub-station, HV&LV voltage, AC &DC voltage, lighting small power normal lighting & emergency lighting, lightening protection, catholic protection, ground system, HVAC System, AC & DC regulator pump& motor.
Assist and participate monitoring line check, installation PLC, DCS, ECS, ICSS and PCSS system, including MCC&CCR control system.
To handle procurement activities relating to contracts and sub contracts in accordance with Company’s Procedures and Procurement department activities.
MALAYSIA MARINE & HEAVY ENGINEERING (MMHE)
FEB. 2012 – APRIL. 2014
E&I Lead Senior Construction Supervisor/Technical.
Project FPSO CENDOR II (CP2 Module topside)
Marine Vessel and Top Side Module Floating Vessel Owner by Petrofac Malaysia
Monitor & supervise fabrication E&I support and installation.
Ensure compliance to the work/project standard and timeline
Submit monthly report to COMPANY
Quality check of asset master data.
Supervise installation lighting panel, JB, lighting fixtures and glanding termination.
Experience in Oil and Gas Industry SAP top side Module.
Experienced in Project Management and familiar with engineering drawing such as Process and Instrumentation Diagram (P&ID), Single Line Diagram (SLD) and Process Flow Diagram (PFD).
Ability to review General Arrangement (GA), and engineering documents such as Dossier and Spare Part.
Installation topside pressure instrumentation, vessel cargo signal alarm system, O2 & CO2 system, water mist system, level alarm system, Inert gas system, gas analyzers system.
Monitor tubing running, tubing leak test, line check, tank gauging system, fusible loop plug, and airline process control systems activities.
Monitoring cable pulling and cable insulation test electrical & instrument conductivity.
Installation panel LV/HV transformer, battery charger panel, sub-station power panel, power generator, Gas turbine generator & gas turbine compressor panel.
To undertake main cont. & sub cont. team briefings and inception activities to ensure all aspects of work are understood by all concerned parties.
To perform engineering checks for electrical & instrument documents. (like datasheets, P&ID design, drawing & engineering requirements and specification)
Module topside total electrical & instrument equipment installations and co-ordination with other departments.
Electrical drawing CEIG & instrument approval coordinate with State Electrical board.
KWH TECHNOLOGIES SDN, BHD (Seremban Malaysia)
JUNE. 2011 – AUG. 2011
Lead QC Inspector / Mechanical Piping Supervisor
Project Titan Petrochemical Shutdown/Turnaround 2011
To ensure safety standards and procedures are implemented and followed by contract requirements in accordance company guidelines.
Ensure daily progress reports up to date base on activities and identify for solve any related problem to each of field activities also ensure the works is completed with quality standard follow the requirement.
Coordinate and expediting with our subcontractor to ensure the smoothness of production activities.
Witness hydrostatic and pneumatic test to perform and monitoring chemical cleaning activities and ensure job task clear.
To perform line check and clearance final punch list
Review test package and submit to owner for testing.
To perform final walk down before pre commissioning / ECC
Coordinate and expediting which system need perseveration cleaning and pre commissioning
To review and evaluate technical submittal and shop drawings prior to submission to consultants and clients according to required project standards.
Managing site quality piping welding and erection subcontractor works and progress.
Prepares periodical progress reports such as weekly/biweekly, monthly, project inspection and close out reports.
Co-ordinate with project coordinator and engineering department quality works for necessary implementation.
Rotary Mec Engr. Sdn Bhd
MAR. 2011- JUN. 2011
E & I Supervisor
Project Gemusut Kakap Project (SSPC) Sabah
MALAYSIA MARINE & HEAVY ENGINEERING (MMHE) JOHOR, MALAYSIA
To Supervise and coordinate project work within area of discipline in accordance with contract conditions, working within budget and time constraints to ensure customer satisfaction.
Field check AFC / IFC drawing electrical process & control system schematic drawing, location layout, routing modification base on designs drawing.
Monitor installation and alignment gas turbine generator, gas Turbine compressor,
Monitor installation and alignment power generator & emergency switchboards, main switchboards, transformers, switch gear, battery and UPS system.
Monitor & supervise panel installation at sub-station & E-house HV&LV voltage, AC &DC Voltage, lighting small power, ground system, HVAC system, AC & DC regulator, pump& motor.
Monitor & supervise installation normal lighting panel & emergency lighting panel and junction box looping cable.
Handles and supervises all electrical & instrument works and ensures that installation activities are complying with contractual obligations and quality control standards.
DELMATIC TECHNICS SDN BHD OIL&GAS ENGINEERING
JUNE. 2010 – SEPT. 2010
Electrical & Instrument Site Engineer
Industry Grade One Marine & Heavy Engineering Sdn. Bhd.
Location Pantai Remis, Lumut Perak Malaysia Project KOTA LAKSAMANA-PLB101KOM PBJV
KEY RESPONSIBILITIES
Experienced in Project Management
Submit monthly report to COMPANY
Experienced in PMMS SAP Plant Maintenance (PM) module which includes Asset master data as per Petronas Upstream Data Minimum Standard (UDMS), Work Planning & Scheduling (WPS) work process as per Petronas WPS manual and utilizing mass SAP upload template.
Experienced in providing SAP PM technical support and conducting PMMS SAP training to users PMMS TECHNICIAN
Experienced in Project Management and familiar with engineering drawing such as Process and Instrumentation Diagram (P&ID), Single Line Diagram (SLD) and Process Flow Diagram (PFD). Ability to review General Arrangement (GA), and engineering documents
Handles and supervises all electrical & instrument works and ensures that installation activities are complying with contractual obligations and quality control standards.
Ensuring that production works are carried out in accordance to drawing & design, code, standard, procedures and client specifications.
To verify and supervise daily work progress activities which should be performed as a follow job pack/work list, technical specification, equipment isolation sheets, material control sheet and other relevant document.
Coordinate and verify the construction activities though daily Installation surveillance and inspection ensuring that are comply with project drawing, specification, procedure and fully maintain adheres to the schedule.
To ensure all activities required and liability of permit to work before start working, make sure that the workings area safe to work and permit active sign off also release by personal authorization.
To identify materials and spare parts required for the planned ensure all materials are ordered and on site when required.
Liaise with our owner representative regarding inspection and product acceptance as per requirements.
To supervise and coordinate project work within area of discipline in accordance with contract conditions, working within budget and time constraints to ensure customer satisfaction.
MALAYSIA MARINE & HEAVY ENGINEERING (MMHE)
OCT. 2007 – APRIL. 2010
Instrument Supervisor (Executive)
Project FPSO RUBY II Floating Vessel (Vietnam field sea water) MISC, PCVL, PTSC
Location Pasir Gudang (MMHE) Johor West Malaysia
Experienced in Project Management
Jobs conversion, refurbishment &repair maintenance.
Ensure compliance to the work/project standard and timeline
Submit monthly report to COMPANY
Quality check of asset master data.
Handles and supervises all instrument works and ensures that installation activities are complying with contractual obligations and quality control standards.
Field check AFC / IFC drawing instrument process & control.
Experience in Oil and Gas Industry and top side Module.
Experienced in Project Management and familiar with engineering drawing such as Process and Instrumentation Diagram.
Familiar with engineering drawing such as Process and Instrumentation Diagram (P&ID), Single Line Diagram (SLD) and Process Flow Diagram (PFD).
Ability to review General Arrangement (GA), and engineering documents such as Dossier and Spare Part
System schematic drawing, location layout, routing modification base on designs drawing.
Installation instrument device, fire & gas system, fire alarm, P A system, security alarm system, emergency response system.
Installation and cable pulling internal telephone system, CCTV system, UHF&VHF system.
Installation topside pressure instrumentation, vessel cargo signal alarm system, O2 & CO2 system, water mist system, level alarm system, Inert gas system, gas analyzers system.
Monitor tubing running, tubing leak test, line check, tank gauging system, fusible loop plug, and airline process control systems activities.
Dissemble & assemble control valve, overhaul, service and repair, leak test, calibrate and strokes functional test.
Assist work at site related with instrument testing solenoid valve, safety valve, pressure relief valve, blip valve, pressure gauge etc.
Monitoring cable heat trussing, loop check, continuity test, trouble shooting,
Monitor and supervise doing instrument testing and commissioning.
To supervise and coordinate project work within