Post Job Free
Sign in

Construction Inspector Data Entry

Location:
Tulsa, OK
Posted:
October 10, 2024

Contact this candidate

Resume:

************@*****.*** 918-***-**** Eucha, OK **342 WWW: Bold Profile

PROFESSIONAL SUMMARY

Capable construction Inspector/manager professional well-versed in completing daily rounds, collecting measurements and identifying processing concerns early through diligent inspections. Conscientious, reliable and driven to make positive impact through work. Excellent organizational, observational and decision-making abilities. WORK HISTORY

Chief Inspector. Cheyenne, WY

Byers Group 07/2024 - Current

Southern Star wanted to do a flow reversal from Riner Wy to Cheyenne Wy on the W line.

We put in new valves, lines, actuators, and ultrasonic meter buildings, and new bypass piping at each station, one at Riner, Arlington, and Cheyenne.

Chief Inspector. Cleveland, OK

Cleveland Integrity Services Inc. 05/2021 - 07/2024 Working for Southern Star, using anywhere from 4 to 20 inspectors. At Scipio KS, we put in 3 miles of lateral 2" pipe coming off of the DPA line we put in the year before, connecting to the town border of Scipio. At Welda KS, we made improvements including piping, valves, instrumentation to enable them to pump into other lines and utilize the DPA line.

At Leavenworth KS, the Bureau of prisons, there were several lines where they were going to build a new prison facility, we had to build a small facility including new valves, piping, launcher, and instrumentaion. we put in 4000' of new line, and took up 3500' of the old lines. At Americus KS, we installed a new launcher, and rebuilt the auxiliary room that had been damaged by a fire, totally redoing it with new piping and new offices.

At Lawrence KS, we installed 6 miles of new 16" pipeline that ended up going into the Evergy power plant, tying into several smaller facilities. This job was about 40% HDD's, including boring under the Kansas River. At Hesston KS, we put in a new 1600' 24" HDD crossing the railroad and pipe and fittings.

At Reading KS, we fixed a dual exposure of 24" pipe and fittings, lowered the line down, and put in rip rap over the small creek crossings to stop erosion.

Blasting/Utility Inspector. Cleveland, OK

SKILLS

EDUCATION

● Conflict Management

Employee Performance

Monitoring

● Policy Enforcement

● Staff Oversight and Motivation

● Customer Service

● Writing Reports

● Photography

● Documentation Skills

● Preparing Reports

● Quality Controls

● Data Entry

● MS Office

● Operator Qualification Testing

● Reporting and Documentation

● OSHA Compliance

Christopher Starr

Cleveland Integrity Services Inc. 03/2020 - 11/2020 I worked for Southern Star as a utility, and explosive blasting inspector to install 28 miles of 36" from welda KS to Ottawa KS. I kept logs of the sections that were blasted, and kept footage everyday from crews that I was overseeing.

Chief Inspector. Welda, KS

CIS 07/2017 - 12/2019

Chief Inspector II. Cleveland, OK

Cleveland Integrity Services 03/2013 - 08/2017

Jay High School Crowder

College

07/2023

High School Diploma

Worked for Southern Star Central gas pipeline, the first jobs were putting in new piping an demo work for secondary containments, removing old tanks and placing new

Took up existing pipeline and ran a new 12", installed a launcher and receiver, used stopples to isolate and put in by passes during

On the South Welda recovery upgrade installed 22,000 feet of new 4" pipeline connecting wells, and upgrading and installing new containments, tanks, gun barrels, electrical, coating,and remediating ROW

● I had a total of seven inspectors on this job.

● CIS

Working for Magellan, overseeing and inspecting over projects in Doraville Terminal and Atlanta

Terminal installing V-grade to A-grade blending skids, involving welding, civil, and electrical work tying in existing manifolds and different pipelines and the tanks from the tank farm going to Truck racks

The work also entailed coordinating with Plantation and Colonial Pipeline companies for drain up and shutdowns

My duties were to coordinate work with contractors and Operations from

Magellan, keep job books, schedule X-Ray, complete weld maps and as built drawings

● And ensure quality of work

● Both Jobs were completed on time and on schedule

● Environmental/coating inspector

Completed a line replacement of 1850' on 10" gas pipeline in Welda, KS

Duties included daily inspections on coating, bell holes, safety, quality, and weekly environmental reports

● Helped finish

● Reboiler project, hydraulic lines in basement in the pump room

● Jobs complete., Helped to complete several projects for Magellan Installed new piping, valves, tie-ins, concrete and structural supports, and hydrostatic tests at the Allen facility

● Coating project completed at the Barnsdall Facility Assisted in an extensive project at the West Tulsa Facility including new manifolds, directional bores, extensive piping, painting, and civil work

Upgraded booster pumps in West Holly including removal of old tank piping, installing new piping, new meter, valves, and electrical

upgrades

Greensboro NC, installed new piping overhead in the tank far to connect Colonial and Continental lines, upgrade existing manifold and new tank lines, valves, LPMR,s and concrete/steel pipe supports

Drumright OK, Installed new LPMR,s, new DRA skid with injection points and concrete containment, upgrade manifold, swap ALCO and relief tanks and piping, build turnaround for DRA delivery trucks

West Tulsa OK, Installed new DRA skid with concrete containment and injection points, install new piping back to tank lines on the pipe rack

Coffeyville KS, New pipeline from Coffeyville to Caney Junction (14 miles) Installed temporary piping to allow station to keep operating during construction, demoed Unit 3 pump and pad, built new pump pad and installed new pump skid, motor and pump for new pumped line, completely rebuilt manifold, piping, supports, valves, LPMR,s, electrical, new relief tank with concrete piping, new relief lines, new DRA, new additive tanks! platforms, and new VFD building

Wynnewood OK, Demo and install new manifold, valves, supports, connected two new X grade tanks from the tank farm

On the majority of these jobs I was the only inspector, inspecting civil, mechanical, electrical and supports

● Inspector

● Qis

Inspecting over final clean up and restoration for Renegade Crude on 45 miles of 12" steel pipeline in Gillette WY

● Inspector

● Mcdaniels Technical Services/ Spection

Helped to construct a natural gas pipeline gathering system for Southwest Energy, consisting of overwell pads with connecting lateral and main lines in PA

Pipe ranging from 6" to 30" steel lines, and 16" Poly lines connecting all well pads

● Various

Various jobs as Inspector, directional bore superintendent, foreman, water/wastewater facilities operator, heavy equipment and HDD operator and locator and cross country fiber optic jobs for

● Qwest.



Contact this candidate