I am a highly qualified, innovative, and dedicated employee, who is able to communicate clearly, concisely, and professionally with solid written and verbal communication skills. Resilient, adaptable to change, possessing strong organizational, leadership and team building skills. I am able to resolve issues effectively and efficiently as they happen. I am a self-motivated, team player with a proven ability to work well with a diverse group of individuals while consistently completing projects on time and under budget.

EXPERIENCE

McDermott, Sabine Pass, Texas – Senior Mechanical LOTO Coordinator

2/23-Current

I act as a bridge for communication between the client’s needs and what commissioning/construction has to accomplish on a daily basis.

Review isolation plans on P&IDs as requested by construction and commissioning teams.

Train new hires on our electronic LOTO system Versify for qualification.

Walk down lines and isolate where needed.

Isolate vessels as requested.

Once work is completed, de-isolate when requested, ensuring all paperwork is completed correctly.

Twisted Off Road LLC, Lake Charles, Louisiana - Assistant Manager

2/21-2/23 Resumed previous duties so I could be in town to take care of my father who was ill.

Oversaw day to day tasks and performed daily and weekly reports.

Made sure all materials and supplies were in place for techs.

Oversaw all fabrication and installations.

Applied Consultants, Rose City, Texas, Inspector

2/20-11/20

QA/QC over pipeline construction from clearing, final tie-ins, and dirt work and oversaw pipeline construction from clearing right of way to final clean rocking above ground sites.

QA for onsite fabrication.

Oversaw fabrication as build reports and weld mapping.

Witnessed anomaly digs. The process of using a smart pig, (tool that travels through piping) to verify wall thickness of piping and any other consistencies. After, make recommendations from said findings.

QA for blasting and painting above ground fabrication.

McDermott, Louisiana, Texas - Commissioning/Construction Isolation Specialist

11/18-2/2020

Review isolation plans on P&IDs as requested by construction and commissioning teams.

Walk down lines and isolate where needed.

Trained new hires for qualification for our process

Isolate vessels as request.

Once work is completed, de-isolate when requested.

Self Employed, Lake Charles, Louisiana - Mechanic

12/16-11/18

Alfred Miller Contractors, Lake Charles, Louisiana - QC/Leadman

5/16-12/16

Verify all molds to be poured per clients drawing specifications.

Pull samples and perform break tests on concrete.

Inspect each piece once it is pulled from mold.

Get with patch crew to make repairs as needed.

Assisted foreman laying out casts per drawings.

Made sure crew had all materials and tools needed to complete each task.

Aided in pouring concrete in double tee forms.

Twisted Off Road LLC, Lake Charles, Louisiana - Assistant Manager

8/15-5/16

Oversaw day to day tasks and performed daily and weekly reports.

Made sure all materials and supplies were in place for techs.

Oversaw all fabrication and installations.

Tulsa Inspection Resources, Tulsa, Oklahoma, -QA/QC – Plains All American Pipeline

3/15-5/15

Oversaw installation of piping for crude oil headers from 12” to 36”

Oversaw on site fabrication.

Reviewed P&IDs for proper valve placement, sequence, type, and size.

Drew iso’s, as built dwg, and weld maps for fabrication.

Oversaw civil work in the form of digging, backfilling, compacting ditches, drilling, tying steel, setting rebar and forms for piers.

Conducted and chaired daily safety meetings and weekly safety audits.

Wood Group PAC, Houston, Texas- Construction Manager – BHP Billiton

2-13/3-15

Managed brown field (expansion on live locations) and greenfield (new) construction for this $10 million project.

Managed day to day operations on site.

Met with contractor supervision to go over daily goals.

Held safety meetings and reviewed JSA’s for each crew working on site.

Coordinated with contactor for deliveries of engineered controls.

Oversaw on site fabrication as well as drew iso’s, weld maps, and redline drawings.

Over saw installation of compression for artificial lifts.

Installed compressors on wells for higher volume of gas flow.

Reviewed P&IDs for spec breaks and witnessed HP and LP hydro tests per drawings.

Verified hydro equipment met or exceeded client’s calibration and safety requirements.

Reviewed P&IDs with engineers to insure constructability.

Oversaw prepping and painting.

Performed post construction commissioning and start up with

engineers.

Oversaw well pad/cellar remediation post drilling/frac.

Oversaw well pad construction per client specifications.

Met with proctor and verified compaction met specifications.

Met weekly with engineers and Project Managers to give updates on construction progress.

Checked in material per bill of materials and verified material test reports.

Energy Operators, Houston, Texas- Construction Manager – Murphy Oil Corporation

10-13/12-13

Oversaw pipeline construction from clearing right of way to final clean up.

Managed 5 inspectors and 30 contractor personnel with great results.

Met daily with engineers for updates and concerns that needed to be addressed. Ensured to communicate to my crew of all discussed.

Oversaw 1500’ Horizontal Directional Drill.

QC for onsite fabrication and drew weld maps as well as redline drawings that needed updating.

QC for installation of launchers/receivers, contractor torquing all bolt ups.

Oversaw construction of dirt pads, concrete piers, blasting and painting of above ground fabrication.

Witnessed filling, hydro testing, dewatering, drying the line to client specifications.

Applied Consultants, Longview, Texas- Welding Inspector – BHP Billiton

9-12/10-13

QA/QC over pipeline construction from clearing, final tie-ins, and dirt work. I oversaw pipeline construction from clearing right of way to final clean rocking above ground sites.

QA for onsite fabrication.

Oversaw installation of meter runs.

Verified contractors hydro test equipment for calibration and safety requirements.

Oversaw filling, hydro test, dewater, and drying to company specifications.

Oversaw mainline as build reports and weld mapping.

Applied Consultants, Longview, Texas- Construction Coordinator – Pioneer Natural Resources

7/10 – 9/12

Managed and coordinated 30+ inspectors performing various tasks.

Met weekly with PM and client operations manager for progress updates and any issues that may have arisen.

QC pipe gang and firing line welding.

QA installation of hot bends at tie in points.

Ordered all material and fabrication for separator and meter sites.

Oversaw installation of separator piping and tying in meters to Enterprise LLC. hot taps.

QA for coating, lowering in, and backfilling.

Oversaw that paperwork and deadlines for multiple projects were up to specification and on time.

Applied Consultants, Longview, Texas- Welding Inspector - Encana Oil and Gas Gathering

2/10 – 7/10

Oversaw pipeline construction from clearing to final tie-in. coordinated 30+ inspectors performing various tasks.

Coordinated 30+ inspectors performing various tasks.

QC for onsite fabrication.

Oversaw dirt work for facility.

Oversaw and QC installation of flow lines and sales lines.

Witnessed stress relieving flow arms for high H2S concentration.

Wellsco Field Services, Houston, Texas- Welding Inspector – Bull Mountain Project

8/09 – 9/09

QC for testing all pipe coatings utilizing a holiday detector. Setting and lowering mainline pipe when results were verified.

Oversaw tie-ins.

Applied Consultants, Longview, Texas- Welding Inspector – Petrologistics Depropanizer Pipeline

12/08 – 03/09

Oversaw clearing right of way and laying mats.

QC for testing all pipe coatings utilizing a holiday detector. Setting and lowering mainline pipe when results were verified.

QC tie-in mainline valves and fabrication.

Oversaw hydro testing and pigging.

Moody International, Houston, Texas- Utility Inspector – Golden Pass Pipeline 42”

08/08 – 12/08

Work Scope I.

Marshland ditching.

Coating on the main line push rack.

Work Scope II.

Inspect all aspects of tie-ins, ditch, welding, coating, and backfill.

Tested all pipe coatings utilizing a holiday detector. Setting and lowering mainline pipe when results were verified.

Wilcrest Inspection, Houston, Texas- Utility Inspector – Cameron LNG 42” pipe

12/07 – 07/08

Witnessed clearing and laying mats.

QA/QC over stringing pipe, bending.

QA/QC over HDD’s.

QA on coating of mainline welds.

Gulf South Pipeline, Lafayette, Louisiana- Project Inspector-Gulf South Pipeline

04/07-12/07

Planned projects and coordinated with contractors.

Check in all material, check all Material Test Reports.

Tested welders with both low hydrogen and mild steel welding rods.

QA/QC on all aspects of the projects; ditch, welding, coating, testing, backfill, and cleanup.

Complete all paperwork upon completion of project.

Wilcrest Inspection, Houston, Texas- Tie-in Welding Inspector – Liberty Gas Storage 30”/20”

06/06 – 04/07

PQA on welding with lowering-in and tie-in crews, also testing all pipe coatings utilizing a holiday detector, coating, and wetland crossings (per FERC specifications).

Assisted testing crew with testing and running drying pigs.

Moved to station to work nights with x-ray.

Gale Reese, Inc, Houston, Texas- Utility Inspector – Northern Natural Gas

08/05 – 10/05

Covered dig ups.

Integrity work.

Changed out main line valves.

Universal Ensco, Inc., Houston, Texas- Utility Inspector – Equistar Pipeline

06/03 – 12/03

QA clearing, ditch, coating, testing all pipe coatings utilizing a holiday detector, lowering-in piping, backfill, and direction drilling using a Horizontal Directional Drill.

Some fabrication, CT Stations and clean up.

QIS Inspection, Goodwill, Oklahoma- Utility Inspector – Spread 8 Kern River Expansion 36” pipe

11/02 – 04/03

QA for clearing and grade, rough clean up, and final clean up.

Backfilling in Jean Pumping Station.

Wilcrest Inspection, Houston, Texas- Welding Inspector – Guardian Pipeline Project 36” pipe

Covered welding of pipe to be used in road bores.

Welding of pipe and final tie-ins.

Covered FERC wetland crossings.

EDUCATION

●Sam Houston High School, Moss Bluff, Louisiana 1995 Graduate

●McNeese State University, Lake Charles, Louisiana 1996-1998

CERTIFICATIONS

●Safeland training

●H2S Awareness

●NCCER – CSSS 100-hour safety training

●NCCER card number 13176823

●TWIC card



Contact this candidate