William Kevin Whitley
Rockingham, NC 28379
910-***-**** (H), 910-***-**** (CELL)
************@*****.***
Objective:
To receive as position as a Mechanical Engineer or Cad Designer.
Work Experience:
Quality Beverage (Leland NC) February 2018 – October 2024
General Manager
Manage and oversee all operations for Cheerwine in Leland NC
Piedmont Cheerwine Bottling Company (Raeford, NC) March 2009 – February 2018
Salesman: March 2010 – February 2018
Create Sales and merchandise numerous stores
Warehouse Manager: March 2009-March2010
Oversee all operations and manage warehouse personnel.
Check in all trucks. Both transports and company trucks.
Print off Sales orders and assign to personnel.
Check Sales orders against inventory, sales receipts and returns/damaged merchandise.
Account for all monies received and deposit.
Load outgoing merchandise trucks and account for all merchandise.
Responsible for company grounds and assets.
Ritz-Craft of NC (Hamlet, NC) July 2005 – February 2009
AutoCAD Manager
Oversee and manage all aspects of the Engineering Department.
Direct the department employees in providing fabrication prints to the production facility develop confirmation prints and furnish state submittal sets.
Assign all work to the CAD operators.
Review all work of the CAD operators.
Update and track all prints coming in and going out per the Print Status.
Implement and execute cross training of the CAD operators.
Track progress/productivity of the CAD operators.
Draw production packages, state submittal sets, and Floor plans.
Review all revisions from the builders make sure of capabilities.
Review all change orders against submittal sets and production package.
Update all AutoCAD blocks, templates, standard floor plans and library.
Set drawing standards for CAD operators.
Crestline Homes (Laurinburg, NC) May 2005-July 2005
CAD Operator
Produce submittal packages for modular homes with AutoCAD Architectural Desktop.
Submittal Packages consist of Criteria Sheets for States, State inspector sheets (if necessary), ResCheck data, Plan Views, Elevation drawings, Area Calculations, Electrical drawing and schedules, Supply Plumbing drawing, Drain Plumbing drawing, Foundation drawings, HVAC drawings, and Cross Section details.
Produce building packages for modular homes with AutoCAD Architectural Desktop.
Building packages consist of Floor layouts, Exterior wall layouts, Partition wall layout, and Roof truss layout.
Order all cabinets.
Kitchen, Bath, Utility, and Entertainment centers
ISM/Trane (Rockingham, NC) September 1998-May 2005
Engineering/Manufacturing Liaison, December 2003-May 2005
30%-40% of time spent on engineering projects.
Interpreting customer specification
Produce working drawings (i.e. base layout with BOM, wall, roof and interior layout with BOM, piping, electrical and control schematics) with AutoCAD.
Produce take off with AutoCAD.
Research specifications for testing and setup.
Unit inspections and Quality Control.
Check working drawings.
Prepare equipment list and notes from purchase orders.
Understand equipment operation to allow proper clearances.
Design and layout air washer spray banks and tanks.
Prepare piping diagrams with BOM.
60%-70% of time spent on shop support
Answer engineering and technical questions from Manufacturing. Questions vary from an Engineering design or error, vendor equipment error or submittal error, or a Manufacturing process error. Manufacturing questions occur in fabrication, base steel, assembly, piping, electrical, and controls.
Solutions are derived from my decision-making or with the assistance of the Lead Engineer within thirty minutes.
Responsible for making sure all rework is complete and is in manufacturing hands within a timely manner.
Responsible for as built drawings.
Drawing explanations. Mechanics are often uncertain of assembly processes or Engineering Standards and need assistance in interpreting working drawings.
Interaction with external customers during a visit. External customers vary from Sales Representatives, Engineers, and Owners of the product. Interaction consists of explanation of test procedures and construction of the unit
Working as shop support, one must have some knowledge in every process taken from beginning to end.
Production Supervisor, November 2003
Responsible for night shift supervision and Engineering support.
Responsible for personnel.
Assign work task.
Responsible for safety of personnel.
Oversee projects through completion.
Sales & Marketing, February 2002-October 2003
Provide design layouts with AutoCAD.
Interpret customer specification and schedules.
Provide equipment selections (i.e. coils, fans, humidifiers, filters, dampers, louvers, air blenders, and humidifiers) using selection programs.
Provide equipment pricing from vendors.
Assist in proposal packages for customers.
Value Engineering to reduce Engineering time and cost.
Budget pricing and preliminary unit designs. Unit designs consist of sizing the physical dimensions of the unit, equipment sizing and equipment performance.
Assist in job turnover from Sales to Engineering.
Verbal and written communication skills are required due to interaction with Sale offices and Engineering firms.
Cad Designer, September 1998-January 2002
Interpret customer specification.
Produce working drawings (i.e. base layout with BOM, wall, roof and interior layout with BOM, piping, electrical and control schematics) with AutoCAD.
Prepare equipment list and notes from purchase orders.
Understand equipment operation to allow proper clearances.
Design vibration isolator bases and spring selections.
Design and layout air washer spray banks and tanks.
Prepare piping diagrams with BOM.
Additional Training and projects: Six Sigma Fundamentals training with Demand Flow Technology. Projects include offset panel skin and testing projects. Twelve week interoffice training on basic Air Handling design and equipment sizing. Equipment selection program training. Microsoft Office training. Gas burner training. Electric motor training. Basic electrical, controls, and piping training.
Bobby’s Furniture (Hamlet, NC)
Assistant/Credit Manager, May 1994-September 1998
Collect Accounts Receivable and Sales
Industrial Sheet Metal (Rockingham, NC)
Sheet Metal Mechanic, October 1992-May 1994
Assist in building Custom Air Handling Units
Railroad Friction Products (Maxton, NC)
Dynamometer Engineer, September 1992-October 1992
Ran stopping time test on railroad brake shoes and pads on the Dynamometer Machine
Macafee Detailing (Rockingham, NC)
Structural Detailer, May 1992-September 1992
Produce Structural Steel Drawings from Master Steel Drawings provided by the customer
Education:
Kennedy Western University, Thousand Oaks, CA (July 1999-January 2002)
Mechanical Engineering
Course work is complete. Final project to be finished.
Richmond Community College, Hamlet, NC (December 1995- June 1999)
Associates in Arts with emphasis in Accounting & Business Administration
Richmond Community College, Hamlet, NC (August 1989-June 1991)
Associates in Mechanical Engineering Technology
Combined GPA: 3.7 on a 4.0 Scale
References:
Furnished upon request
Interests and Activities:
Golf, Softball, Hunting, Fishing, Remodeling, Landscaping Design, and Family time