ASSAH MUZENYI
Address · **** Riddler way, Little Elm Tx 75068
Email · *******@*****.***
Cellphone : 469-***-****
FIELD TECHNICIAN
Diverse technical experience in hardware installation covering.
1-Indoor units installation in cabinets and racks
2-Grounding and powering of indoor units
3-Run ethernet, fiber and RF cables
4-Outdoor units installation
5-Antenna installation and alignment
6-Mini links integration
7-Equipment decommissioning and harvesting
8-Documentation-Daily reports, COPs, Bug Reports
9-DC power connections
EXPERIENCE
2022 – 2024
FIELD TECHNICIAN-CELNET PVT LTD
INSIDE SHELTER SOW for Indoor units (Mini -Link 6651/3)
· Install Mini -Link 6651/3 (Indoor Unit) to FIF Rack
· Run Power cable from 6651 to Main Power plant or Fuse panel provided on the Rack
· Terminate the power-to-Power plant
· Ground the Mini link’s
· Run -Ethernet cables to Site Boss and terminate
· Run Coaxial cable from the Mini Links to Radios on the shelter Rooftop
INSIDE SHELTER SOW for Outdoor units (Mini -Link 6363)
· Install 2-Mini -Link 6363 (Outdoor Unit) to inside the shelter wall
· Run Power, ground, Ethernet cables and Coaxial cables as needed for both the Mini- Links
ROOFTOP SHELTER SOW: -
· Assemble both the Antennas, and Align one Vertical and other Horizontal
· Once the Antennas are assigned, mount them to the poles.
· Install the Poles, Blocks, Antenna, and radios to shelter top,
· Ground the Radios
· Run the Coaxial cable from the radios to the Mini Link inside the shelter
Commissioning the Mini- Links SOW: -
· Using the O&M cable and Laptop, load and configure scripts
· Install all the Basic NE settings
· Set the basic NE IPv6 data parameters
· Finish Radio link Terminal (RL) Configuration
· Finish Carrier Termination (CT) Configuration
· Set the TX and RX frequencies
· Set the power outputs
· Enable transmitter
· Finish VLAN Configuration
· Final Antenna Alignment
COPS & REPORTS
2021-2022
WORKSHOP ASSISTANT-ROTA TRUCK & TRAILER
-BRAKE CHANGE
-TRAILER LIGHTS REPAIRS
-ABS REPAIRS
-TRAILER ROOF REPAIRS & BODY WORK
-OIL CHANGE
-WORKING WITH HYDROLIC, NEUMATIC, POWER TOOLS
2009 – 2021
PROJECT ENGINEER-ALTIMATE COMMUNICATIONS PVT LTD ZIMBABWE
Projects Team lead for [ Econet wireless,Telecel, Netone] 4G,3G, 2G,Microwave transmission deployment, New Site Builds, Antenna swaps, site integration, Site power upgrades, site surveys, site audits, network optimization, drive test, benchmarking. Civil works – tower construction, fencing equipment plinths.
Liquid Telecomms Zimbabwe – Ftth deployment, optical fibre installations, route surveys, WiMax Installation.CPE Installations
NEC Africa- Deployment of iPasolink VR4 links,Cyber security with Facial recognition capability at border posts in Zimbabwe for Interpol,Site surveys for link budgets design.
EDUCATION
2017
MSC IN PROJECT MANAGEMENT-UNIVERSITY OF LUSAKA ZAMBIA
2014
BSC TELECOMMUNICATIONS HONOURS – MIDLANDS STATE UNIVERSITY ZIMBABWE
SKILLS
Hands on engineer- hardware installation splicing and terminations
Stakeholder mgt and bus development
CDL A DRIVER -recently qualified
Team player and leader
Health Safety champion
Good Communication Skills
ACTIVITIES
Enjoys travelling