Post Job Free
Sign in

Material Controller Manager

Location:
Manila, NCR, Philippines
Posted:
November 13, 2024

Contact this candidate

Resume:

RAYMUND O. ABAD

Desired Position: Material Controller

HIGHLIGHTS OF SKILLS AND QUALIFICATION:

. Total of work experience over 23.5 years in different field of work

. Over 8years working in Oil and Gas

. Over 3years Supervisory position in Garment Industry

. Over 5 years Site coordinator

. Over 1 year working with Business Center as front liner / Controller Document

. Graduated in Adamson University

. Course B.S. Industrial Engineering 1988-1992

. Communication Skills; English

. Computer literate – MS Word, Excel,

. Know how to drive and trouble shooting of car engine

. Some knowledge in Electrical Installation

EMPLOYMENT HISTORY:

Material Controller Supervisor May 29.2019 to Aug.03,2020

Tecnicas Reunidas

Haradh Hawiya Gastification Compresion Plant (HHGCP)

Maintains inventory, which includes keeping records in an inventory management system, acquiring additional stock as required, and distributing items from stock to fulfill requisitions.

Ensures safe operation of equipment used to move and transport materials to and from the storage areas of the facility.

Organizes and coordinates activities and staff schedules, ensuring fulfillment goals are met and that shipments are timely, accurate, and undamaged.

Collaborates with material manager and other departments to develop and modify materials handling processes and procedures.

Responsible for accuracy of documentation supporting the project.

Responsible for verification of all documentation on a daily and weekly frequency.

Working closely with Logistics and Manufacturing regarding incoming material and Project planning

Coordinate and supervise warehouse and laydown area personnel

Coordinate with the site supervisors

Coordinate with the different contractors for the free issue material

Perform the regular audit for the contractors warehouse and storage areas

Oversees the daily workflow and scheduling of the Materials Handling department

Performs other related duties as assigned.

Support the application of safe, healthy and environmentally sound working practices within the Operations team.

Material Controller Supervisor March 29.2016 to Nov.09,2017

Tecnicas Reunidas

Jazan Refinery and Terminal Project (JRTP) &

Jazan Integrated Gasification Combined Cycle (JIGCC)

P.O.Box: 379, Baish 45971

Kingdom of Saudi Arabia

Responsible of receiving materials in piping Preparation of location of material and proper handling.

Issuing of material

Report of OSD (Over, shortage, damage) materials.

Making of material inventory report as for stock of materials.

Sending material report to my material manager.

Make sure that materials being delivered have a packing list and correct identification number,

Material Manager Feb. 24 2014 – July 2014

Aztikintiyol Azerbaijan Baku

Aggregate and Asphalt

. Responsible for timely delivery of goods and gets receipt which ensures date and quantity of delivered goods.

. Oversees this facility directing its employees and coordinating the movement of all inventories.

. To make sure that warehouse is properly arrange and safe keeping.

. Weekly report must be done to make sure that all stock is still available.

. Make report of OSD (over, shortage, damage).

. Coordinate with the construction concerning advance material requirement.

. Implementing safety first before necessary inspection of materials.

. Check the data for update of all materials.

Logistic Coordinator / Material Controller Aug. 20,2011 – Jan. 31,2014

Housing Contractor

Manila Philippines

. Prepare and update monthly logistics, schedule to assure deliveries to production locations. Coordinate product delivery schedules with customers.

. Coordinates inventory of stock and ensure product adjustments are properly applied. Receives, sorts, logs, and distributes all incoming shipments. Identifies, locates, obtain, and arranges for shipment of requested replacement parts. Arranges warehousing and transportation of products to customers. May investigate and respond to inquire regarding distribution and shipping.

Material Controller Dec 9,2010 - June 04,2011

GS Engineering & Construction Corp.

Project: Saih Nihayda Depletion Compression (Phase1)

Muscat Oman

. Handling and Supervising the Company’s Over All Material Control System using (Material Control System) related to Material Receiving Report (MRR) as per project specification, Material Issuance, Over, Short, and Damaged (OSD Report), Material Transfer and Adjustment, Inventory Control, Running and Setting System Build Analysis (for workable Isometric Drawings), Site Requisitions and Producing different kind of System Reports. Strictly implementing the Material Issue System as per Drawings.

Coordinating with the Engineering and Construction for Site Queries and site instruction with regarding to the status of materials, preparing and issuing materials related to revisions as per specification required, look for possible substitution of materials if found shortage to avoid delay of Construction and reviewing Piping Specification used.

. Handling different kind of queries coming from different respective department

. Responsible of receiving and out going materials.

. Checking of materials packing list.

. Checking of the status of all materials.

. Inventory report and daily report.

. Make sure that all materials are properly handle.

. Make report for LOSD ( Lost,Over,Shortage,Damages) Materials.

. Received stores and accurately check them off against manifest and

purchase order, updates computer records accordingly and prepare and

distribute a Material Received.

. Coordinate with construction concerning advance material requirements and set up . . Responsible for the management of the stores and for the storage of stock items.

Material Controller Jan. 20, 2009 -Dec. 2010

Self Employed Housing Construction

Cainta Rizal

. Responsible of all materials to be used in the project.

. Make sure materials are in safe place.

. Make inventory of materials.

. Make delivery on time and checked delivered materials are complete.

Sr. Material Controller Dec.18, 2005- Dec.2008

Kentech Sakhalin Technical Services Limited, Sakhalin Russia

LNG 2 Booster Station

. Checking of materials incoming and out going

. Making of inventories

. Arrange in proper location of material.

. Ensure materials are well kept and stockpiled to avoid damage

. Coordinate with construction concerning advance material requirements and set up

. Coordinates inventory of stock and insure product adjustments are properly applied. Receives, sorts, logs, and distributes all incoming shipments. Identifies, locates, obtains and arranges for shipment of requested replacement parts. Arrange warehousing and transportation of products to customers. May investigate and respond to inquire regarding distribution and shipping.

. ETA’s (Estimated Time of Arrival) to avoid delays on material deliveries.

. Daily releasing of field material requests by construction personnel on site.

. Responsible for the systematic control of all spare parts, consumables and tools on the

FPSO, including the material received, issued, requisitioned and item sent from the

unit.

. Maintain precise computer records of the above using the FPSO stock control software

system.

. Received stores and accurately check them off against manifest and purchase order,

updates computer records accordingly. and prepare and distribute a Material Received.

. Issue material under the direction of the Maintenance Superintendent, record the issue

and update the computer record accordingly. Inform Maintenance Superintendent when

the stock level fall beneath the set minimum and prepare requisition and update the

computer record according to the approved requisition under the direction of the

Maintenance Superintendent.

. Systematically update Minimum and Maximum stock level under the direction of the

Maintenance Superintendent.

. Responsible for the management of the stores and for the storage of stock items.

. Maintain a close working relationship with the shore base buyer over material

procurement and logistics.

. Responsible for ensuring requisitions contain the maximum amount of information to

enable the onshore base buyer to quickly identify and procure the materials and

services and to reduce technical clarification and delay to the minimum.

Site Coordinator /Assistant Logistic 2002 - 2005

Free Lancer, Depend on project allocation ( Philippines)

. Checking of daily accomplishment of work.

. Checking materials on site

. Report daily activities.

. Check scoop of works

. Follow up all Materials that been purchase

Material Controller May 1998 – Oct. 2001

Tangent Power Corporation, Pateros Metro Manila (Philippines)

. To oversee all material deliveries and field material requisitions required on the project.

Prepare inventories/database for all received and released materials to be use in the

project.

. Generate reports on all missing and damage materials to avoid construction delays.

. Ensure materials are well kept and stockpiled to avoid damage.

. Systematically update Minimum and Maximum stock level under the direction of the

Maintenance Superintendent.

. Responsible for the management of the stores and for the storage of stock items.

. Maintain a close working relationship with the shore base buyer over material

procurement and logistics.

. Responsible for ensuring requisitions contain the maximum amount of information to

unable the onshore base buyer to quickly identify and procure the materials and

services and to reduce technical clarification and delay to the minimum

. Coordinate with construction concerning advance material requirements and set

up ETA’s (Estimated Time of Arrival) to avoid delays on material deliveries.

. Daily releasing of field material requests by construction personnel on site.

Operation Supervisor Nov. 1994 – Dec. 1997

Grand Style Apparel Garment, Pateros Metro Manila (Philippines)

. To oversee the flow of production and see to it that the operations were handled

properly.

. Make sure the delivery date was on time and in an efficient manner.

. Checking the cost of production is at a minimum but quality is taken into

consideration.

. Encoding the production reports on a daily basis prior to deliveries.

. Preparing payroll report for weekly production.

. Generate database concerning day to day production output and progress reports.

. Prepare billings for approval from the client based on delivered production output

Roustabout Oct.1992 – Nov. 1994

Parker Drilling Co. Int’l. Phil., Makati City (Philippines)

. Handle and maintain drill pipes, drill collar, pipe tubing.

. Handle and maintain tongs and spinning chains.

. Assist the derrick man at monkey board when tripping.

. Safe conscious while on work.

. Offloading supplies from the boat and moving them to the storage area.

. Maintain mud bucket and toolbox.

. Cleaning and scraping the deck, equipment at the working area.

. Stacking drill pipes.

. Mixing and conditioning drilling mud.

Front Liner / Document Controller Mar.1991 - May 1992

Fax N Parcel Business Center, Makati City (Philippines)

. To assist customers concerning day to day transactions.

. Handling all customer incoming documents, faxes, telex, parcels, and telephone

calls.

. Computer encoding and secretarial services plus document control.

. Review and process all documentation requirements per transactions.

. Generate transaction logs and reports on daily basis.

. Directly report to the operations manager concerning completed business

transactions.

Service Crew Mar.1990 – Sept.1990

Jollibee, Guadalupe Makati, City (Philippines)

EDUCATION:

Primary: Pasig Catholic College Pasig City 1978-1984

Secondary: Pasig Catholic College Pasig City 1984-1988

College: Adamson University San Marcelino Manila 1988-1992

Course: B.S. Industrial Engineering

TRAININGS AND SEMINARS:

Date: Training Course Training Center

January 01,2011 IFR PDO Training Passport

December18,2010 HSE Induction PDO Training Passport

January 19, 2003 Basic Introduction to Drilling Asia Pacific Well Drilling

Technology Hydrogen Sulfide Specialists

(H2S) and SCBA

Basic First Aid Training

Basic Rig Orientation and Safety

Awareness

April 6-18, 1998 Basic Safety Course Asia Pacific Maritime

Services Inc.

Personal Survival Technique

Fire Prevention and Fire Fighting

Personal Safety and Social Responsibility

Elementary First Aid

PERSONAL INFORMATION:

Date of Birth: 13th August 1971

Place of Birth: Manila

Nationality: Filipino

Gender: Male

Civil Status: Married

Height: 5’8 ft.

Weight: 140 lbs.

Permanent Address: # 32 M. Lozada St. Sto. Rosario Silangan, Pateros Metro Manila

Contact Numbers: +639*********/ +639*********

Landline: +632829199

Email Address: **********@*****.***

Skype Name: raymund0813

Passport Number: P9976813B

Date Issued: 08 May 2022

Valid Until: 07 May 2032

REFERENCES:

Jose Arvest Portero Arfsten (Digital Transformation)

Tecnicas Reunidas

*******@****************.**

+346******** ext,79830

Joon Lee (Material Manager)

GS Engineering & Construction Inc.

*******@*******.**.**

+968********

Peter Leonard Project Manager

Kentech Sakhalin Technical Services Limited

*****.*******@*******.**

+742********

Eng’r.Robert Tuazon Electrical Supervisor

Tecnicas Reunidas KSA

+966*********

Jaime Aguilar HR Department

Tecnicas Reunidas KSA

+966*********



Contact this candidate