RAYMUND O. ABAD
Desired Position: Material Controller
HIGHLIGHTS OF SKILLS AND QUALIFICATION:
. Total of work experience over 23.5 years in different field of work
. Over 8years working in Oil and Gas
. Over 3years Supervisory position in Garment Industry
. Over 5 years Site coordinator
. Over 1 year working with Business Center as front liner / Controller Document
. Graduated in Adamson University
. Course B.S. Industrial Engineering 1988-1992
. Communication Skills; English
. Computer literate – MS Word, Excel,
. Know how to drive and trouble shooting of car engine
. Some knowledge in Electrical Installation
EMPLOYMENT HISTORY:
Material Controller Supervisor May 29.2019 to Aug.03,2020
Tecnicas Reunidas
Haradh Hawiya Gastification Compresion Plant (HHGCP)
Maintains inventory, which includes keeping records in an inventory management system, acquiring additional stock as required, and distributing items from stock to fulfill requisitions.
Ensures safe operation of equipment used to move and transport materials to and from the storage areas of the facility.
Organizes and coordinates activities and staff schedules, ensuring fulfillment goals are met and that shipments are timely, accurate, and undamaged.
Collaborates with material manager and other departments to develop and modify materials handling processes and procedures.
Responsible for accuracy of documentation supporting the project.
Responsible for verification of all documentation on a daily and weekly frequency.
Working closely with Logistics and Manufacturing regarding incoming material and Project planning
Coordinate and supervise warehouse and laydown area personnel
Coordinate with the site supervisors
Coordinate with the different contractors for the free issue material
Perform the regular audit for the contractors warehouse and storage areas
Oversees the daily workflow and scheduling of the Materials Handling department
Performs other related duties as assigned.
Support the application of safe, healthy and environmentally sound working practices within the Operations team.
Material Controller Supervisor March 29.2016 to Nov.09,2017
Tecnicas Reunidas
Jazan Refinery and Terminal Project (JRTP) &
Jazan Integrated Gasification Combined Cycle (JIGCC)
P.O.Box: 379, Baish 45971
Kingdom of Saudi Arabia
Responsible of receiving materials in piping Preparation of location of material and proper handling.
Issuing of material
Report of OSD (Over, shortage, damage) materials.
Making of material inventory report as for stock of materials.
Sending material report to my material manager.
Make sure that materials being delivered have a packing list and correct identification number,
Material Manager Feb. 24 2014 – July 2014
Aztikintiyol Azerbaijan Baku
Aggregate and Asphalt
. Responsible for timely delivery of goods and gets receipt which ensures date and quantity of delivered goods.
. Oversees this facility directing its employees and coordinating the movement of all inventories.
. To make sure that warehouse is properly arrange and safe keeping.
. Weekly report must be done to make sure that all stock is still available.
. Make report of OSD (over, shortage, damage).
. Coordinate with the construction concerning advance material requirement.
. Implementing safety first before necessary inspection of materials.
. Check the data for update of all materials.
Logistic Coordinator / Material Controller Aug. 20,2011 – Jan. 31,2014
Housing Contractor
Manila Philippines
. Prepare and update monthly logistics, schedule to assure deliveries to production locations. Coordinate product delivery schedules with customers.
. Coordinates inventory of stock and ensure product adjustments are properly applied. Receives, sorts, logs, and distributes all incoming shipments. Identifies, locates, obtain, and arranges for shipment of requested replacement parts. Arranges warehousing and transportation of products to customers. May investigate and respond to inquire regarding distribution and shipping.
Material Controller Dec 9,2010 - June 04,2011
GS Engineering & Construction Corp.
Project: Saih Nihayda Depletion Compression (Phase1)
Muscat Oman
. Handling and Supervising the Company’s Over All Material Control System using (Material Control System) related to Material Receiving Report (MRR) as per project specification, Material Issuance, Over, Short, and Damaged (OSD Report), Material Transfer and Adjustment, Inventory Control, Running and Setting System Build Analysis (for workable Isometric Drawings), Site Requisitions and Producing different kind of System Reports. Strictly implementing the Material Issue System as per Drawings.
Coordinating with the Engineering and Construction for Site Queries and site instruction with regarding to the status of materials, preparing and issuing materials related to revisions as per specification required, look for possible substitution of materials if found shortage to avoid delay of Construction and reviewing Piping Specification used.
. Handling different kind of queries coming from different respective department
. Responsible of receiving and out going materials.
. Checking of materials packing list.
. Checking of the status of all materials.
. Inventory report and daily report.
. Make sure that all materials are properly handle.
. Make report for LOSD ( Lost,Over,Shortage,Damages) Materials.
. Received stores and accurately check them off against manifest and
purchase order, updates computer records accordingly and prepare and
distribute a Material Received.
. Coordinate with construction concerning advance material requirements and set up . . Responsible for the management of the stores and for the storage of stock items.
Material Controller Jan. 20, 2009 -Dec. 2010
Self Employed Housing Construction
Cainta Rizal
. Responsible of all materials to be used in the project.
. Make sure materials are in safe place.
. Make inventory of materials.
. Make delivery on time and checked delivered materials are complete.
Sr. Material Controller Dec.18, 2005- Dec.2008
Kentech Sakhalin Technical Services Limited, Sakhalin Russia
LNG 2 Booster Station
. Checking of materials incoming and out going
. Making of inventories
. Arrange in proper location of material.
. Ensure materials are well kept and stockpiled to avoid damage
. Coordinate with construction concerning advance material requirements and set up
. Coordinates inventory of stock and insure product adjustments are properly applied. Receives, sorts, logs, and distributes all incoming shipments. Identifies, locates, obtains and arranges for shipment of requested replacement parts. Arrange warehousing and transportation of products to customers. May investigate and respond to inquire regarding distribution and shipping.
. ETA’s (Estimated Time of Arrival) to avoid delays on material deliveries.
. Daily releasing of field material requests by construction personnel on site.
. Responsible for the systematic control of all spare parts, consumables and tools on the
FPSO, including the material received, issued, requisitioned and item sent from the
unit.
. Maintain precise computer records of the above using the FPSO stock control software
system.
. Received stores and accurately check them off against manifest and purchase order,
updates computer records accordingly. and prepare and distribute a Material Received.
. Issue material under the direction of the Maintenance Superintendent, record the issue
and update the computer record accordingly. Inform Maintenance Superintendent when
the stock level fall beneath the set minimum and prepare requisition and update the
computer record according to the approved requisition under the direction of the
Maintenance Superintendent.
. Systematically update Minimum and Maximum stock level under the direction of the
Maintenance Superintendent.
. Responsible for the management of the stores and for the storage of stock items.
. Maintain a close working relationship with the shore base buyer over material
procurement and logistics.
. Responsible for ensuring requisitions contain the maximum amount of information to
enable the onshore base buyer to quickly identify and procure the materials and
services and to reduce technical clarification and delay to the minimum.
Site Coordinator /Assistant Logistic 2002 - 2005
Free Lancer, Depend on project allocation ( Philippines)
. Checking of daily accomplishment of work.
. Checking materials on site
. Report daily activities.
. Check scoop of works
. Follow up all Materials that been purchase
Material Controller May 1998 – Oct. 2001
Tangent Power Corporation, Pateros Metro Manila (Philippines)
. To oversee all material deliveries and field material requisitions required on the project.
Prepare inventories/database for all received and released materials to be use in the
project.
. Generate reports on all missing and damage materials to avoid construction delays.
. Ensure materials are well kept and stockpiled to avoid damage.
. Systematically update Minimum and Maximum stock level under the direction of the
Maintenance Superintendent.
. Responsible for the management of the stores and for the storage of stock items.
. Maintain a close working relationship with the shore base buyer over material
procurement and logistics.
. Responsible for ensuring requisitions contain the maximum amount of information to
unable the onshore base buyer to quickly identify and procure the materials and
services and to reduce technical clarification and delay to the minimum
. Coordinate with construction concerning advance material requirements and set
up ETA’s (Estimated Time of Arrival) to avoid delays on material deliveries.
. Daily releasing of field material requests by construction personnel on site.
Operation Supervisor Nov. 1994 – Dec. 1997
Grand Style Apparel Garment, Pateros Metro Manila (Philippines)
. To oversee the flow of production and see to it that the operations were handled
properly.
. Make sure the delivery date was on time and in an efficient manner.
. Checking the cost of production is at a minimum but quality is taken into
consideration.
. Encoding the production reports on a daily basis prior to deliveries.
. Preparing payroll report for weekly production.
. Generate database concerning day to day production output and progress reports.
. Prepare billings for approval from the client based on delivered production output
Roustabout Oct.1992 – Nov. 1994
Parker Drilling Co. Int’l. Phil., Makati City (Philippines)
. Handle and maintain drill pipes, drill collar, pipe tubing.
. Handle and maintain tongs and spinning chains.
. Assist the derrick man at monkey board when tripping.
. Safe conscious while on work.
. Offloading supplies from the boat and moving them to the storage area.
. Maintain mud bucket and toolbox.
. Cleaning and scraping the deck, equipment at the working area.
. Stacking drill pipes.
. Mixing and conditioning drilling mud.
Front Liner / Document Controller Mar.1991 - May 1992
Fax N Parcel Business Center, Makati City (Philippines)
. To assist customers concerning day to day transactions.
. Handling all customer incoming documents, faxes, telex, parcels, and telephone
calls.
. Computer encoding and secretarial services plus document control.
. Review and process all documentation requirements per transactions.
. Generate transaction logs and reports on daily basis.
. Directly report to the operations manager concerning completed business
transactions.
Service Crew Mar.1990 – Sept.1990
Jollibee, Guadalupe Makati, City (Philippines)
EDUCATION:
Primary: Pasig Catholic College Pasig City 1978-1984
Secondary: Pasig Catholic College Pasig City 1984-1988
College: Adamson University San Marcelino Manila 1988-1992
Course: B.S. Industrial Engineering
TRAININGS AND SEMINARS:
Date: Training Course Training Center
January 01,2011 IFR PDO Training Passport
December18,2010 HSE Induction PDO Training Passport
January 19, 2003 Basic Introduction to Drilling Asia Pacific Well Drilling
Technology Hydrogen Sulfide Specialists
(H2S) and SCBA
Basic First Aid Training
Basic Rig Orientation and Safety
Awareness
April 6-18, 1998 Basic Safety Course Asia Pacific Maritime
Services Inc.
Personal Survival Technique
Fire Prevention and Fire Fighting
Personal Safety and Social Responsibility
Elementary First Aid
PERSONAL INFORMATION:
Date of Birth: 13th August 1971
Place of Birth: Manila
Nationality: Filipino
Gender: Male
Civil Status: Married
Height: 5’8 ft.
Weight: 140 lbs.
Permanent Address: # 32 M. Lozada St. Sto. Rosario Silangan, Pateros Metro Manila
Contact Numbers: +639*********/ +639*********
Landline: +632829199
Email Address: **********@*****.***
Skype Name: raymund0813
Passport Number: P9976813B
Date Issued: 08 May 2022
Valid Until: 07 May 2032
REFERENCES:
Jose Arvest Portero Arfsten (Digital Transformation)
Tecnicas Reunidas
*******@****************.**
+346******** ext,79830
Joon Lee (Material Manager)
GS Engineering & Construction Inc.
*******@*******.**.**
Peter Leonard Project Manager
Kentech Sakhalin Technical Services Limited
*****.*******@*******.**
Eng’r.Robert Tuazon Electrical Supervisor
Tecnicas Reunidas KSA
Jaime Aguilar HR Department
Tecnicas Reunidas KSA