Post Job Free
Sign in

Project Site Mechanical Engineering

Location:
Govardhanpur, Gujarat, India
Posted:
November 13, 2024

Contact this candidate

Resume:

Navin Prajapat (Mechanical Engineering)

Email :***************@*****.***

Contact: +91-900*******,748-***-****

Career Vision

Work in a challenging environment demanding all my skills and efforts and hence realizing my potential so l can get the job satisfaction and safety pace professional growth.

ProfessionalExperience in M/s Lasern and toubro pvt. ltd.

Project Site

Duration

Work

M/S Reliance industries pvt. Ltd.

Aug. 2024 to till now

Pv solar piping and structute fabrication and erection work

ProfessionalExperience in M/s Faricators and Erectors pvt. ltd.

Project Site

Duration

Work

M/s Ambuja Cements Ltd.(A UNIT Of Maratha Cements Ltd.), Upperwahi, chandrapur, Maharastra

Feb. 2023 to may 2024

WHRS Project (AQC Boiler, Ph Boiler, TG, ACC, Pipe Rack and Piping)

Professional Experience in M/s Good fellow Engineering services

Project Site

Duration

Work

M/s Welspun India Limited, Anjar, Gujrat

Sep-2021 to jan 2023

Fabrication and erection of IBR and NIBR piping’s& pipe rack (550 ton) as per QAP.

Execution of work as per target with pre-Commissioning and commissioning.

Man power allotment as per planning and schedule.

M/s JK Cement Ltd.(Nimbahera- Udaipur,Raj.)

(Feb-2021 to Aug-2021)

Fabrication and erection of IBR and NIBR piping’s& pipe rack as per QAP.

Maintenance and shutdown work carried out.

Dismantling and fabrication of structure and cone.

Changing tube of AQC boiler heater and also commissioned.

M/s Indian rayon,veraval (Grasim ltd.)

(110 TPH)

(Jan -2021 to feb-2021)

Maintenance and shutdown work carried out.

Maintenance of Screw Conveyor, APH, ESP, GENERATOR COOLER,BELLOW REPLACEMENT,MDC etc. work carried out.

M/s Trident Goup

(36 TPH)

(Jan-2021 )

Maintenance and shutdown work carried out.

Execution of work as per target.( BET TUBE REPLACEMENT WORK)

M/s Heidelberg cement (Mycem cement )

(Nov-2020 to dec-2020)

Maintenance and shutdown work carried out.

Execution of work ( replacement of 236 nos. condensate tubes at AQC -03)

M/s Jk super cement ltd. (muddapur,kar.)

(SNCR – 25 MW –CPP)

(FEB-2020 to oct-2020)

Fabrication and erection of SS piping’s& pipe rack (5 TON) as per QAP.

Erection of PMR & PMW pumps with plc, mcc and pu-10 units.

Execution of work as per target.

M/s Grasim Industries Ltd. (Nagda, M.P.).

( WHB BOILER – CS2)

(Jan-2020 to feb -2020)

Maintenance and shutdown work carried out.

Execution of work ( replacement of 144 tubes with hydro test).

M/s Jubilant Life Science (Gajraulla, U.P.)

(90 tph – CPP)

(Nov.-2019 to Dec – 2019)

Maintenance and shutdown work carried out.

Bet tube replacement (hydro test was done at 87 kg)

Fabrication and erection of IBR and NIBR piping’s& pipe rack as per QAP.

M/s Vardhman fabric (Budhni).

( 18 MW - CPP)

(Feb-2018 to nov.-2019)

Fabrication and erection of IBR and NIBR piping’s& pipe rack (350 ton) as per QAP.

Execution of work as per target.

Man power allotment as per planning and schedule.

Maintenance and shutdown work carried out two times in feb.2018 &feb. 2019.

M/s Grasim Industries Ltd. (Nagda, M.P.).

( 18 MW - CPP)

(Nov.-2017 to Feb.-2018)

Fabrication and erection of IBR and NIBR piping’s& pipe rack as per QAP.

Execution of work as per target.

Man power allotment as per planning and schedule.

Maintenance and shutdown work carried out two times in feb.2018 &feb. 2019.

M/s Shree cement (Ras,Rajasthan).

(27 MW - CPP)

(Aug-2016 to nov.- 2017)

Fabrication and erection of IBR and NIBR piping’s& pipe rack as per QAP.

Site target and Progress report preparation and monitoring.

As a site in-charge site team monitoring for achieved the target.

Maintenance and shutdown work carried out.

Job roles and responsibilities

Preparation of schedule for the total project.

Monthly planning for fabrication and erection of structure and pressure parts.

Manpower allocation as per schedule.

Daily review meeting held with site team.

Weekly review meeting held with customer against target and actual work progress.

Job execution as per customer quality standard.

IBR and NIBR welder test carried out with customer (3G and 6G).

IBR document preparation for CIB (Ground inspection report, Hydro test report).

Ensuring Pre-heating, post heating, SR and RT as per QAP.

Monthly protocol and bill preparation against work completion.

CoreQualification

Proficient in production and maintenance techniques.

Familiar with different varieties of production and quality.

Ability to perform other physically strenuous work.

Proficient in Microsoft Office word.

Proficient in Microsoft Office Excel.

EducationalQualification

Class/Degree

Board/University

Institute

Year

Percentage

B.Tech

Rajiv Gandhi Technical University(RGTU)

Swami Vivekanand College Of Engineering, Indore

June,2016

72.00

XII

M. P. Board

A. B. H. S. S., Nagda

March,2012

79.00

X

M. P. Board

A. B. H. S. S., Nagda

March,2010

81.10

PersonalDetails

Date of Birth : January 26, 1995

Father’s name : Mr. Ramlal Prajapat

Hobbies : Managing, Playing chess& Listening to Music.

Personal traits : Self Motivated, Adaptable & Team Player.

Weaknesses : Punctuality

Languages Known : English & Hindi

Blood Group : B+

Permanent address : X-03, biral gram nagda (m.p.), 456331

Declaration

I hereby declare that the above mentioned information is correct to the best of my knowledge in case of any discrepancy then I will be responsible.

Date:

Place: UJJAIN NAVIN PRAJAPAT



Contact this candidate