Post Job Free
Sign in

Reservoir Engineer Project Management

Location:
Humble, TX
Posted:
November 10, 2024

Contact this candidate

Resume:

PATICA ROMAN

Humble, Texas ******.*****@*****.***

346-***-**** linkedin.com/in/patica-roman-7b55a514 EXECUTIVE SUMMARY

An experienced, and motivated Senior Reservoir Engineer and Leader, with experience of working for leading, high- profile companies.

SUMMARY OF QUALIFICATIONS

Extensive experience in all facets of reservoir engineering, including strategic planning, project management, reservoir surveillance and optimization, reservoir modeling, economic evaluation, reserve estimation, and production forecasting for both conventional and unconventional reservoirs.

Proven expertise in formulating and implementing production and development strategies, driving operational efficiency, and delivering results across various reservoir environments. CORE COMPETENCIES

Reservoir Engineering Reserve Calculations Operational Insight

Asset Development Material Balance Project Leadership

Steamflooding Well Testing: RTA, PTA Decline Curve Analysis

Waterflooding Data Management Team Leading

Economic Analysis Reservoir Modeling CCUS

PVT, RCAL, SCAL Analysis Software Management MS Office: Word, PowerPoint, Excel PROFESSIONAL EXPERIENCE

AERA ENERGY (Shell & ExxonMobil JV), Bakersfield, California - Senior Reservoir Engineer 2011 – 2023

Led production monitoring activities in the South Belridge and Lost Hills fields, optimizing production rate on: o Heavy Oil reservoir – 3k BOP, keeping the annual decline rate at less than 10%. o Diatomite reservoir – 20k BOPD, keeping the annual decline rate at less than 4% through effective Voidage Management.

Led asset development initiatives:

o Heat-mining infill project on South Field Section 18 – more than 20 vertical wells; 80% success rate with production more than 15 BOPD, without steam injection support. o Down-dip steamflood expansion on South Belridge Field, Section 20 – 16 producers and 4 steam injectors on 4 injection patterns; producers reached peak production of more than 20 BOPD. o Identified more than 2300 producers (replacement and infill/expansion type) on Belridge and Lost Hills fields Diatomite reservoir, as part of the multi-annual reserves master development plans.

Led the reserves review and booking process for Base production (PDP) and Development projects (PUD): o Production forecasting – type curve generation and forecasting at vintage level. o Investment and Operations Cost evaluation.

o Economic analysis.

o Projects planning and scheduling.

Analyzed pressure data IHS RTA and production expectancy for: o Different frac designs – gate decision on developing Southeast Lost Hills field. o Facilities upgrades – pressure reduction in the gathering system on Lost Hills Williamson field – 2 million investment, 80 BOPD production increase, for 10 psi pressure decrease.

Evaluated the company's reservoir portfolio for CCUS opportunities – resulted in identifying the storage site in Middle Belridge, with the storage target of 1.6 million metric tons of CO2 per year. CHEVRON (San Joaquin Valley Business Unit), Bakersfield, California – Reservoir Engineer 2008 – 2011

Led production monitoring activities in the Coalinga Field – optimized production rate on an area with 2,9k BOPD, keeping the annual decline rate at less than 10%.

Led asset development initiatives:

o Heat-mining infill project on Coalinga Field Section 25 – 5 wells with horizontal laterals between 800 and 1500 ft: four wells coming on production with more than 25 BOPD, without steam injection support. o Down-dip steamflood expansion on Coalinga Field Section 36 – 6 producers and 5 steam injectors; producers reached peak production of more than 20 BOPD.

Led the reserves review and booking process for Base production (PDP) and Development projects (PUD): o Production forecasting – type curve generation and forecasting. o Investment and Operations Cost evaluation.

o Economic analysis.

o Projects planning and scheduling.

Applied innovative technology equipment to address operational challenges – used MeshRite completion in high-temperature producers due to steam breakthrough, on Coalinga Field, Section 24; mechanical failure rate decreased by 75%.

ADDITIONAL RELEVANT EXPERIENCE

PARADIGM GEOPHYSICAL CANADA – Reservoir Engineer

TECHNICA PETROLEUM LTD – Reservoir Engineer

OMV – PETROM SA – Reservoir Engineer, Production Engineer TECHNICAL PROFICIENCY

Production Forecasting: DSS, OFM, PEEP, Mosaic, ARIES, ComboCurve

Reserves Review and Booking: PRMS, Mosaic, ARIES

Well Testing: WellTest, Interpret

Data Management: Access, SQL, IHS Harmony

Data Visualization: ArcGIS-ArcPro, Power BI, Tableau, Open Works, GEOLOG

Reservoir Modeling: GOCAD

Fracture Modeling: GOHFER

Well Design/Planning: Sysdrill

Petroleum Economics: PEEP, Mosaic, ARIES, ComboCurve EDUCATION

Master of Science in Petroleum Engineering – Oil and Gas University of Ploiesti, Romania TRAINING AND DEVELOPMENT

ComboCurve – Reserves Certification (ComboCurve), DQ - Decision Quality (SDG), GOHFER – Frac Simulator (Barree and Associates), Applied Reservoir Simulation - NEXT (Schlumberger), Subsurface Heat Management (Integrated Services Group), Oil and Gas Reserves Evaluation (PetroSkills), Petroleum Risk and Decision Analysis (PetroSkills), Reservoir Management (PetroSkills), PEEP (Aera Energy), DSS V2006 (Chevron), Crystal Ball (Introduction and Advanced, Chevron), PEEP AND DTK (Chevron), Reservoir Heat Management (Chevron), Basic Principles of Thermal Recovery (SJVBU, Chevron), GOCAD (Paradigm Geophysical Canada Ltd), GEOLOG (Paradigm Geophysical Canada Ltd).



Contact this candidate