Saudi Aramco: Public
Drilling Fluid Engineering Service
General Information
Oil Company: Saudi Aramco
Engineer name: Abdul Raqib
Engineer 2nd name: Abdul Rahman
Engineer family name: AL-Sharif
YEM Mob No: +967-*********
E-mail: *****.*********@*****.***
Nationality: Yemeni
Birth date: 01/01/1974
Language: Arabic & English
Education
Institution
Degree Earned
(attach copy of degree)
Major Completion Date
Sana'a University M.Sc. Preliminary year Petroleum Geology and Stratigraphy
1998/1999
Sana'a University B.Sc. in science Geology/Chemistry 1996 Drilling & Completion fluids related training
Subject
Certifica
te (attach
copy of
certificate
s)
Training Center
Completion
Date
Advanced Mud School Yes Sana'a - Yemen June,05
Virtual Hydraulics Yes Sana'a - Yemen June,05
Basic Mud School Yes Bombay, India Dec,04
Offshore emergency(Personal Survival Techniques) Yes Bombay, India Dec,04 Helicopter Underwater Escape (H.U.E.T) Yes Bombay, India Dec,04 One-Trax Competency Exam v.2003 Yes Sana'a - Yemen Dec,03 IFE Basic Concepts Yes Online Sana'a - Yemen Jan,08 IFE Centrifuge: Principles of Operation Yes Online Sana'a - Yemen April,08 IFE Fluid Volumes Yes Online Sana'a - Yemen June,08 IFE DWM Basic Equipment Yes Online Sana'a - Yemen June,09 IFE Centrifugal Pumps Yes Online Sana'a - Yemen June,09 IFE Completion and work over fluid Yes Online Sana'a - Yemen June,09 One-Trax Competency Exam v.2014 Yes Online Sana'a - Yemen Dec,2014 M-I SWACO Code of Business Conduct and ethics Yes Online- M-I SWACO Sep,08 H2S & SCABA level 2 Training Yes NEFT ENERGIES - Dhahran - KSA
Nov,3-2019
HAZCOM level-2 Training Yes NEFT ENERGIES- Dhahran - KSA
Nov,3-2019
KSA NEST,HSE Safety Training and SIPP
(Schlumberger Injury Prevention Program )
Yes ALkhobar -KSA Oct27-
31,2019
First Aid Basic Course Yes Sana'a- Yemen June, 07
Saudi Aramco: Public
H2S Course Yes Basra-Iraq Aug,08-Sep,12
Basic Fire Extinguisher Course Yes Sana'a- Yemen June, 07 Various QHSE Certifications
On line and Class.
QHSE MIO E0 Management System-QHSE MIO
Instructor Led Training- First Aid Basic
Course- First Aid & CPR- Fire Extinguisher
Course- QHSE Induction- Hazard
Identification Level 1- First Aid Level 1-
Fatique Management Level 1- Observation
Intervention level 1- M-I SWACO HOC-M-1
SWACO ES PTS Pressure Level 2-
Environmental Risk –Based Standard
&Environmental Plan- PPE Level 1&
Mechanical Lifting Level 1& Hazardous
Materials Level1 & H2S Safety Level 1&
Level 2& MEA-Hand Injury Prevention
Campaign & SLB GHS (Global Harmonized
System) Basic Training & Commentary Task
Assessment (SIPP)& Standard Work for
Field Operations & SLB-QHSE-S022 (Well
Integrity level 1)& Observation
Intervention Level 1& SIPP Level 2 (Non-
Office)
March,011-
Feb,015
Introduction to Drilling and Measurements
Technology Course
Yes Schlumberger Company-
Sana'a-Yemen
April,01
Directional Drilling and Measurements
Technology
Yes Schlumberger Company-
Sana'a-Yemen
Oct,2000
Primary Well Cementing Course Yes PEPA- Ministry of Oil& Minerals- Sana'a-Yemen
Aug,2000
Drilling Fluid Engineering Course Yes Feb,2000
Petroleum Applied Reservoir Engineering Yes Petroleum Training Center- Sana'a- Yemen
June,2000
Sedimentology and Sequence Stratigraphy for
Petroleum Exploration with Special Emphasis On
Yemen.
Yes Canadian Petroleum Yemen
Limited
Oct,2000
Employment History
Company Job title Date from: to: Location
Petroleum Exploration and Production
Authority (PEPA)- Ministry of Oil & Minerals
Senior Drilling Fluids
Engineer
Jan 2021- update Yemen
NES, M-I SWACO, A Schlumberger Overseas
LTD Company
Senior Drilling Fluids
Engineer
Oct 2019 – Dec 2020 Saudi
Arabia
Petroleum Exploration and Production
Authority (PEPA)- Ministry of Oil & Minerals
Senior Drilling Fluids
Engineer
Sep 2015 to Sep 2019 Yemen
M-I SWACO, A Schlumberger Overseas LTD
Company
Senior Drilling Fluids
Engineer
June 2002- Aug2015 Yemen-Iraq
Petroleum Exploration and Production
Authority (PEPA)- - Ministry of Oil & Minerals
Drilling Engineer Aug1997- May 2002 Yemen
Sana'a University- Science Faculty- Geology Assistant Teacher July 1996- July 1997 Yemen Saudi Aramco: Public
Field Experience (including mud types)
Operating
Company
Rig Name Field
Accomplishments (specify major
technical & operational procedures
implemented)
Date from:
to:
Technical and Operational Procedures
Senior Mud
Engineer, I worked
with all Operators
In KSA,Iraq and
Yemen:
ARAMCO
Hunt Yemen
Company Jana
Hunt Oil
Company-JHOC,
SEPOC, Total-
Yemen, OMV-
Yemen, VINTAGE
PETROLEUM YEM,
CNYL&CNPE,
OCCIDENTAL
YEMEN (OXY),
SOOGLE Yemen,
SIPC E&P Yemen,
KNOC, MIDAS,
Canadian Nexen-
Yemen, IPM-
Schlumberger-
ROOROO/BP, IDC-
South oil
Company-Iraq,
ENI-Zubair Field,
EXXON/Mobile
and Gazprom
Neft.
ADC 42 & ADC 64, ADC46
ADC67,ADC66,ADC 58, SENO 35
Nabors rigs, YD rigs,MB Rigs,
ZPEP rigs, JOECO rigs, RMG rigs,
DQ rigs and I DC rigs
ARAMCO/IDC (Ghawar
Gas & Ghawar Oil LSTK &
AFK Oil LSTK Project) –
Othmaniea HRDH,KHRS,
KRSN
Iraq(West Qurna-
Rumaila-Basra &South
Rumaila-Basra &North
Rumaila-Basra& Badra-
Alkut)
Yemen( Blocks-1,4,5,
,14,18,20,44,51,10,
71,78,S1,S2)-
Provided effective customer service
by providing information to rig-site
company men, superintendents
and drilling engineers regarding the
progress of the drilling as well as
creating and implementing
solutions to drilling problems,
Maintained and monitored
acquired fluid characteristics for an
efficient and safe drilling
procedures, Assembled Daily Mud
Report, Rig Site Reports, Product
Selection, Inventory Control, Safety
Awareness, and Preparation of final
well reports, Recaps& lessons
learnt.
.
1 June2002 to
update
Senior Mud
Engineer, I worked
with Petroleum
Exploration and
Production
Authority (PEPA)-
Ministry of Oil &
Minerals
All Yemen Blocks
Work completion fluids.
.
Sep,2015 to up
date
WBM Experience (KCl, Nacl, CaCl2, LSND, Inhibited Polymer, etc…) Saudi ARAMCO ADC67-ADC64 –ADC42,ADC -
66,,ADC 57,SENO35
Ghawar Gas & OIL
Ghawar LSTK Project,
AFK Oil LSTK
Spud mud, Hi Bentonite Mud,
KCL Polymer mud, PHPA
polymer, Slat (NaCL) polymer
mud,
Nov,2019 –
Dec 2020
Canadian Nexen YD-Rig1& Rig2 Block 14& 51,Masila- Spud Mud & PHPA POLYMER& Jan, 03 to Saudi Aramco: Public
(CNYL&CNPE ) Hadramout-Yemen Gel Polymer& Duo-Vis free Water & NaCL Polymer& KCL
March,04
OCCIDENTAL
YEMEN (OXY)
YD-Rig3 Block 44, Sayuin -
Yemen
Polymer Mud March,04-
May,04
Total-Yemen HTC-3 Block10, Kharir-
Masila-Yemen
5 %KCL, Nacl salt saturated May,04-
June,04
VINTAGE
PETROLEUM
YEM.
Nabors- Rig 825 Damis Block S1-
Shabwa-Yemen
SALT SATURATED July,04- Sep,04
OCCIDENTAL
YEMEN (OXY)
MB#1Rig Block20- Shabwa -
Yemen
SALT SATURATED Aug,04-Dec,04
CNYL&CNPE HTC- Rig1 Masilah-Block51-
Yemen
WBM/PHPA POLYMER Jan,05- April,05
OCCIDENTAL
YEMEN (OXY)
Nabors –Rig214 Block20- Shabwa -
Yemen
SALT SATURATED May,05-
March,06
OMV-Yemen Nabros-214 Block S2- Al-Ugla-
Shabwa, Yemen
Salt Saturated Polymer mud,
Kla Stop Salt saturated polymer
mud
April 06-Aug 06
SOOGLE Yemen JOECO-420 Shabwa Block 1-Yemen KCL/PHPA SALT SATUR. Apri,08 – June,08
SIPC E&P
Yemen
ZPEP-909 Hadramwat-Block71-
Yemen
8% KCL/PHPA SALT POLYMER July,08-
Nov,08
KNOC JOECO Rig Blok 4-Shabwah-
Yemen
SALT SATURATED/CaCl2 comp Nov,08- Jan,09
MIDAS JOECO Rig Blok 78-Hadramwat-
Yemen
POLYMER MUD April,2010-
May 2010
IPM-
Schlumberger-
ROO
ROO/BP
DQ Rig South Rumaila-Basra-
IRAQ
KCL/PHPA/G-SEAL PLUS
POLYMER
August 2011-
Sept,2011
EXXON/Mobile-
FOD-IPM-
Schlumberger
RMG,rig101 West qarnah-Iraq
South
kCL/Salt Polymer mud 1/10/2011-
15/11/2011
IDC-South oil
Company-Iraq
DQ South Rumaila-Basra-
IRAQ
KCL/PHPA/G-SEAL PLUS
POLYMER
15/11/2011-
30/12/2011
ENI-Zubair Field RMG,rig 103 Zubair-Iraq South KCL/PHPA/G-SEAL PLUS POLYMER
1/1/2012 –
30/1/2012
Gazprom Neft DQ 40,41,43 Badra-kut-Iraq KCL Polymer& Sault Saturated 1/2/ 2012 30/3/2013
OBM Experience (Invert Emulsion, All Oil, etc…)
Saudi ARAMCO /
IDC
schlumberger
ADC67 –ADC42,,ADC-66ADC-
58, SENO35
Ghawar Gas &
Ghawar oil LSTK
Project & AFK oil
LSTK
Versa Drill- Rheliant Nov,2019 –
Dec 2020
HUNT Oil
Company
Nabros-226 Block 18- Maribe-
Yemen
Versa Drill- OBM 1/6/2002-
30/12/2002
Saudi Aramco: Public
Jana Hunt Oil
Company-JHOC
Nabors-1,JOECO-720,JOECO-
520
Block5- Shabwa-
Yemen
Versa Drill- OBM 30/8/2006-
15/12/2007
15/7/2009 &
15/7/ 2011
SEPOC Nabors#226,HTC#5,ZPEP#505 Block18- Maribe-
Yemen
Versa Drill- OBM 1/5/2013-1/4/
2015
Loss of Circulation (Highest concentration of LCM, types of losses, etc…) Saudi ARAMCO ADC67-ADC64 –ADC42,
ADC-66.ADC-58, SENO35
Ghawar Gas &
Ghawar Oil LSTK
Project – AFK Oil
LSTK
Losses from seepage to complete
Mixed assorted regular LCM pills
with 100-200 lb/bbl
Mixed FORMA PLUG Pill. Mixed
Sulfake LCM pill. Mixed and
pumped Mud CAP.
Nov,2019-Dec
2020
Total-Yemen HTC-3 Kharir Losses from seepage to complete. Mixed assorted regular LCM pills
with 100-200 lb/bbl
1/2/2005-
30/62007
OMV-Yemen Nabros-214 Al-Ugla-Shabwa Upper Intervals mixed assorted regular LCM with 100 ppb max
concentration. Used assorted
CaCO3 while drilling the reservoir
to treat seepage losses.
30/6/2007-
1/12/2010
OCCIDENTAL
YEMEN (OXY)
MB-1,Nabors-214 Shabwa Block20-,
Masilah-Block44-
Yemen
Losses from seepage to complete.
Mixed assorted regular LCM pills
with 100-200 lb/bbl .
Mixed Forma Plug Pill and
pumped it.
1/4/2004,15/3
/2006
Canadian
Nexen-Yemen
Different Rigs Masila Losses from seepage to complete. Mixed assorted regular LCM pills
with 100-200 lb/bbl. While drilling
continuously adding the LCM
direct to active system to cure
seepage losses.
30/4/2007-
1/7/2007
Hole Cleaning
Saudi ARAMCO ADC67-ADC64 –ADC42 –
,ADC66- -SENO35
Ghawar Gas& Ghawar
oil LSTK Project
Used Tandem Sweeps pill
(low Vis & High Vis) and
pumped sweeps as hole
dictated.
Inhibition with KCL/ PHPA.
Asphalt, Keeping CL at 50-70 K
with Salt helps Stabilizing Shale
Lubricant
Nov,2019-
Dec 2020
Saudi Aramco: Public
Total-Yemen HTC-3 Block 10,Kharir
Masila-Yemen
Used Sun Sweep with Hi Vis
Sweeps and pumped sweeps as
hole dictated.
15/5/2004-
30/6/2004
OMV-Yemen Nabros-214 Block S2, Al-Ugla
Shabwa- Yemen
Used Tandem Sweeps pill
(low Vis & High Vis) and
pumped sweeps as hole
dictated.
30/3/2006-
1/8/2006
SIPC E&P Yemen ZPEB -909 Henin& judayaah Used High Sweeps as needed and High weighted sweeps.
1/7/2008-
1/11/2008
Gaz Prom Neft DQ-41 & DQ-43 Badra-Kut-Iraq Drilled horizontal wells at 4,500 feet to 5,000 meter lengths.
High weighted mud to 21 ppg
with HEMATITE and BARITE
Hole cleaning was in good
conditions with the optimum
Rheology and pumping Tandem
pills of low viscosity/ low weight
followed by high viscosity / high
weight. Virtual hydraulic was
used daily for good hole
cleaning.
1/2/ 2012 -
30/3/2013
IPM-
Schlumberger-
ROO
ROO/BP &
EXXON/Mobile
DQ & RMG South Rumaila-
Basra-IRAQ & West
qarnah-Iraq South
Used 2-4 ppb Asphasol + 2-4
ppb G SEAL to prepare Hi Vis
sweeps and pumped 30 bbls
regularly to keep the hole clean.
15/8/2011-
30/9/2011
HTHP
Saudi ARAMCO /
IDC
Schlumberger
ADC67-ADC64 –ADC42 –
ADC66- -SINO35
Ghawar Gas LSTK HPHT wells with more than 300
F degree. Used OBM with MW
125 PCF. Kill mud with WM140
pcf.
Nov,2011 to
Dec 2020
SEPOC Yemen Nabors#226 Al-Raja, Meem,
Raydan &
Asad Al-kamel
Gas kick or Salt Water flow)
maximum Mud weight 17 ppg
and max temperature 200 F.
1/5/ 2013-1/4/
2015
Gaz Prom Neft DQ-41 & DQ-43 Badra-Kut-Iraq High temperature well with 300 F &high Mud Wight 21 ppg
1/2/ 2012 -
30/3/2013
High Overbalance and Stuck Pipe
Saudi ARAMCO /
IDC
Schlumberger
ADC66-ADC64 ––ADC67-ADC
57-SENO35
Ghawar Gas & LSTK
Project& Ghawar Oil
LSTK project
solved with CITRIC ACID pill
HCL pill
Nov2019-Dec
2020
SIPC E&P Yemen ZPEB -909 Henin& judayaah Experienced Stuck Pipes and key seat and solved with Asphasol
pill.
1/7/2008-
1/11/2008
Canadian
Nexen&
YD#2 – Nabors Rig#214 Masila- Block 14 &
Shabwa block 20 &
Experienced Stuck Pipes and key
seat and solved with Pipe Lax
30/4/2007-
1/7/2007
Saudi Aramco: Public
OCCIDENTAL
(OXY)& TOTAL
Yemen
Block 10 pill asper procedures.
Solids Control Equipment
Jana Hunt Oil
Company-JHOC
JOECO-720 Dhahab- Yemen Bring new rig without centrifuges
(barite recovery and low solid
centrifuge). We used OBM, I talked
with company man for use
centrifuge especially with OBM and
there is very important when we
use OBM. He agrees with me and
stop of drilling operation until bring
the centrifuges.
1/6/2002-
30/12/02
Gaz Prom Neft DQ-43 Badra- Iraq south Used salt saturated with hematite 21ppg. High gravity and high solids
come back into the suction active
tanks. I discussed many times
about bring centrifuges ( low solids
& barite recovery ) and this very
important for clean mud and keep
MW as program,after many
discussion between me and
company man, supervisor of Gaz
prom, all agrees for me about that,
then bring centrifuges and Pick up
after that the mud is looks very
clean and improve for properties.
1/2/ 2012 -
30/3/2013
Additional Accomplishments
Saudi Aramco: Public
Additional Information and/or comment
I'm senior Drilling Engineer with more 14 years' experience with all types of drilling fluids and more than I have good experience in HTHP well with high weighted MW to 125 pcf. I have good experience for solving any mud related problems. I had basic mud school, advanced mud school, Virtual Hydraulics school, Helicopter Under Water Escape training, Personal Survival Techniques school, Basic IFE concept, IFE Centrifuge principle of operation, Business Conduct and Ethics, Medical, driving school certificates up to date.
I have worked in Saudi ARAMCO in Ghawar Gas & Ghawar oil LSTK Project. I worked in most Yemen blocks and most customers, especially in exploration wells. I worked in IRAQ with Exxon Mobile, ROO, BP, ENI, IDC -South oil company-Iraq Gazpromneft in badra Iraq and IPM SLB. Excellent skills with ONE-TRAX, Virtual Hydraulics and other M-I SWACO Software. Honestly I want you to know that I will do my best to achieve the goals of your operation. Mud Engineer Name & Signature
Abdul Raqib AL-Sharif
Date: 01/03/2022
Mud Supervisor Name & Signature
Country Manager Name & Signature