Post Job Free
Sign in

Project Engineer Mechanical Piping

Location:
Tripoli, Libya
Posted:
September 25, 2024

Contact this candidate

Resume:

CV FOR Sr. PROJECT CONSTRUCTION ENGINEER

PUSHPAKARAN PANDYATTU

Sr. Project Engineer

(Mechanical/ Piping)

Technical Department

(Engineering Design Div.),

Sirte Oil Company,

Brega, Libya,

North Africa

Mobile (Libya): +218-**-*******

Mobile (India): +91-974*******

WhatsApp & IMO+91-974*******

(Now Available in Libya)

PERSONAL DETAILS

Date of Birth : 18.09.1974

Marital status: Married

Nationality: Indian

Passport No. : Z6487869

Passport validity: 12.11.2033

Driving License: Libya/ Qatar/ Indian

Language: English/ Hindi/ Malayalam

Availability: 1 Month

Permanent Address

Pandyattu House, P.O. Choolissery, Thrissur,

Kerala,

India

Mobile (India): 00-91-974-***-****

E mail: ********@*****.***

***********.****@*****.***

Skype ID: pushpakaran.pandyattu

WhatsApp: +91-974*******

OBJECTIVE

Challenging and rewarding upper level position in a growth oriented organization, which offers diverse job responsibility in Mechanical/ Piping engineering and will fully utilize both my technical and managerial abilities.

SYNOPSIS

Pursuing Project Management Professional (PMP)

Post Graduate Diploma in Piping Engineering from Suvidya Institute of Technology (SIT), Mumbai

PDMS (Plant Design Management System) from SIT, Mumbai

Piping Engineering Certification from Indian Institute of Technology (IIT), Mumbai.

B Tech in Mechanical Engineering (Attested by UAE & Kuwait)

Diploma in Mechanical Engineering

More than 22 years’ experience in the field of Project management / Oil and Gas, sector which includes 18 years in Middle East and Africa (UAE, Qatar, Kuwait& Libya). Experienced in Oil & Gas Plants, Sugar Plants, Thermal Plants, Cement Plants, Cryogenic Tanks, Storage Tanks (Crude oil, Naphtha, Cement, Diesel, Water and Product Bins), Piping, Cross Country/ subsea Pipelines, flow lines, De-dusting plants.

Familiar with international codes & standards

Associated with the following Oil and Gas companies.

Libya: Sirte Oil Company

Kuwait: Kuwait Oil Company (KOC), KIPIC (Al Zour Refinery)

Qatar: Qatar Petroleum (QP), Dolphin Energy

UAE: ADMA, ADGAS (ADNOC Group Companies)

MAIN RESPONSIBILITIES HANDLED

Preparation of Scope of works and Tender Documents

FEED and Detailed Engineering (Piping and pipeline Line Sizing, Minimum Wall thickness calculations, Determination of remaining wall thickness of corroded pipe as per B31.G, Relief valve sizing as per API RP520, Tank Calculations as per API 620 and API 650, Gas Calculations, Saddle support calculations, 2 phase and three phase separator designs,

Preparation of Method statements and Lifting plans

Review, issues comments/ approvals for the contractors & vendor documents

Assist the project Manager for timely execution of the project with in the agreed time schedule and budget.

Technical Bid Evaluation (TBE) of suppliers’/ vendors submittals.

Review and approval of Design documents and proposals

Liaise with Client and arrange SIMOPS/ HAZID/ HAZOP/ Design Basis meetings.

Execution of projects in conjunction with relevant Contract documents, Client specifications, international codes & job related Method statements.

Sub-contracting Management:

Requesting for quotations, evaluation and registration of Subcontractors

Arranging meeting with sub-contractors, Preparation of minutes of meeting.

Negotiations, Preparation of Bid Tabulations, selection of sub-contractors, recommendation of subcontractors to senior management, conducting Pre-Contract Award Meeting, and placing sub contract orders.

Monitoring the work progress in line with the proposed schedule.

Ensuring all the Sub contractors are following the contractual obligations and Safety Policies of the Company and Client

Verifying the work accomplished by the Subcontractors, Review of payment certificates / payment applications of Suppliers/Subcontractors and recommending for payment.

Managing back-charges to Subcontractors

Monitoring payment to Subcontractors and maintaining the cash-flow

Assessing subcontractors and involving in Audits

Closing out of Sub contracts

JOB EXPERIENCE

I.Period: From July 2019 to Present

Company: Sirte Oil Company (Under the pay roll of Amazon), Brega, Libya

Division: Engineering & Design Division (Technical Department)

Position: Sr. Project Engineer

Sirte Oil Company is engaged in Exploration, Production, Manufacturing of Oil and Gas and doing all processes including Refining, Crude Oil, Naphtha& LNG exports. Being a Sr. Project Engineer with their Technical Department’s Engineering Design Division; I have actively involved in the following activities.

Preparation of Scope of Works and tender documents

Responses to vendor queries

Coordination for Bidder Site Visits

Technical Bid Evaluation

Technical services for departmental queries

Vendor/ sub-contractor Documents Review and approval

FEED/ Basic Engineering/ Detailed Engineering of piping and equipments

Project Management

II.Period: July 2018 to July 2019

Company: Al Jazeera Industrial Project, Kuwait

Position: Project Manager

Major Projects Handled:

Project: Kuwait Al-Zour Refinery Project_ Unit 2 & Unit 21 Piping & Insulation Works.

Main EPIC Contractor: Sinopec/ Technicas Reunidas (TR)

Client: Kuwait Integrated Petroleum Industries Company (KIPIC)

Scope of Work:

Fabrication and Installation of Piping/ Structures/ Pipe racks/ Equipment

Fabrication and Installation of Interconnecting Piping to equipment

Hydro testing

Painting of piping spools and supports

Insulation of Piping & Valve Boxes

III.Period: March 2017 to January 2018

Company: Mark OIL AND GAS Technologies WLL, Kuwait (Associated with Schlumberger)

Position: Sr. Project Engineer

Major Projects Handled:

EPIC for Jurassic Production Facilities (JPF) @ Sabriya to enhance the early

Production Facilities @ North Kuwait.

Client: Kuwait Oil Corporation (KOC)

Scope of Work:

Fabrication and Erection of 30 Nos. of Flow lines to Inlet Manifold

Fabrication and Installation of Pipe racks, Sub racks, Bridges, Access platforms, Pipe supports etc.

Pipe Rack & Interconnecting Piping

Erection of Flare & Incinerator

Modification of structure/ piping on vendor equipment

On skid & Interconnecting Piping to equipment such as HIPPS, Crude heaters, HP/MP/LP separators, Compressors, Turbines, fresh/ Potable/ Fire water Tanks, crude stabilizer, Re-boilers, De- salters, Hot oil system, Chemical Injection skids, Mechanical Refrigeration Unit, Gas Sweetening Unit, Gas Dehydration Unit, Plant air/ Instrument Air Package, Fuel gas package, Solvent Storage, Vapor Recovery Unit, Crude Tanks, Evaporation pond etc.

Tie-in to KOC facilities (Crude Export, Gas Export, Flow lines, Brackish, Export effluent water etc.

IV.Period: August 2011 to October 2016

Company: DOPET (Doha Petroleum Construction Co. Ltd), Qatar

Position: Sr. Project Engineer (Mechanical & Piping)

Major Projects Handled:

•EPIC for Additional Water Storage Facilities in Jabel Tank farm Dukhan, Doha Qatar.

(Client: Qatar Petroleum, Qatar. Consultant: Penspen)

Scope of work includes Demolition of 2 Nos. of old water storage steel tanks, Relocation of Fire water skid, construction of 2 Nos. of water storage Tanks (40m Dia. x 14m Height & 30m Dia. X 20m Height), Relocation of metering skid & related piping/ valve pit/ structures etc.

•EPIC for Integrated Oily water/ Sludge handling system, new drain system, Fire protection for Crude Oil Manifold & Pipeline Replacement in Halul Island.

(Client: Qatar Petroleum, Qatar. Consultant: Worley Parsons)

Main equipment’s are Surge Tanks, Open and closed drain tanks, produce water package, scale inhibitor injection package, Biocide injection Package, oil water analyzer, oxygen scavenger package, HDPE subsea pipeline etc. Familiar with HDFC fusion welding, Beach pull assistance, Barge/ Tugboat inspection, coordinating with underwater survey/ diving crew, offshore installations, concrete mattress fabrication and installations etc.

•Tie in to the Common Sulphur Project:

(Client: Dolphin Energy Limited, Ras Laffan Industrial City, Qatar)

This includes Construction of 1 No. 13.6 Mtr. dia x 14 Mtr Ht. Dome roof insulated Liquid Sulphur storage tank (Constructed with Jack up system & as per API 650) with all accessories such as Emergency vent, Roof and shell man way, steam inlet and out let connections, Application of heat trace cement, spiral walk way, plat form for Temp. Transmitter etc., 4 Nos. Sulphur transfer pumps, 1 Number metering skid, Jacketed &Skin effect electrical heat tracing (SEEHT) Piping, control valves etc.

V.Period: November 2008 to June 2011

Company: Costain Abu Dhabi WLL, (A subsidiary of Costain Group, Manchester, UK)

Position: Project Engineer (Mechanical & Piping)

Major Projects Handled:

•Flare Handling Emission Recovery (FHER) in LNG plant, Das Island (UAE Offshore). (Client: ADGAS Consultant: Fluor)

Executing the entire EPC project which covers all the critical activities such as Civil works, Equipment erection consists of 3 Knock out drums, Elevated plat forms, control valves/ Manual valves, Pumps, Support fabrication, pipe rack strengthening, piping spool fabrication & erection, sand blasting and painting, E&I work, Passive Fire Protection, Hydro testing and commissioning etc.

•Project of Offshore Associated Gases project (OAG-1) Location: Das Island (Offshore), UAE.

(Main Contractor: TECHNIP MEPI, Client: ADGAS, PMC: WORLI PARSONS)

•Major Overhauling of Crude Oil Storage Tanks 12, 10 & 17, ADMA-OPCO, Das Island. (Tank Diameter 80 m. Height 20 m.).

•Buried pipeline replacement (EPC)

Buried Pipe replacement project which includes replacement of flow lines, trunk lines, suction lines and delivery line to offshore installations.

VI.Period: August 2005 to September 2008

Company: Julphar Engineering Works LLC, Ras Al Khaimah, UAE

Position: Mechanical Engineer (Structural& Piping)

VII.Period: October 2004 to June 2005

Company: M/s. Gulf Cement Company Ras Al Khaimah, UAE (Working under M/s. Ayoki Fabricon Pvt. Ltd., Pune, India)

Position: Site in charge (Structural & Piping)

VIII.Period: August 1999 to October 2004

Company: M/s. Ayoki Fabricon Pvt. Ltd., Pune, India.

Position: Site in charge (Structural & Piping)

IX.Period: July 1993 to July 1995

Company: M/s. Cinzac Technical Services, Cochin, India (Dealer for Thermax Boilers, Kerala)

Position: Service Engineer

QUALIFICATIONS

PROJECT MANAGEMENT

•Pursuing Project Management Professional (PMP) – 35 Hours Contact Class is over and preparing for the examination.

•MS- Project from CADD Centre, Thrissur, Kerala, India, in March 2007.

PIPING ENGINEERING

•Post Graduate Diploma in Piping Engineering from Suvidya Institute of Technology, Mumbai in August 2011

•Piping Engineering certification course from Indian Institute of Technology (IIT), Mumbai

•Mechanical CADD (Auto Cad) from CADD Centre, Thrissur, Kerala, India, in 2007

•Plant Design Management System (PDMS) from Suvidya Institute of Technology Mumbai

ACADEMIC

•B Tech in Mechanical Engineering in 1999 from Institution for Skill Development and Certification (Attested by UAE & Kuwait)

•Diploma in Mechanical Engineering from Department of Technical Education, Government of Kerala, India, in 1993

•Diploma in Production Management from Annamalai University, Chidambaram, India in 2001.

•Advanced Training in Welding Fundamentals for Supervisors and Engineers conducted by Advanced Training Institute, Madras, Ministry of Labour, Government of India in 1996.

SAFETY/ OFFSHORE TRAININGS

•IOSH - Managing Safely conducted by TWI Middle East (Certificate No. 7538)

•Hazard Awareness for Juniors by Emirates Technical & Safety Development Centre (ETSDC)

•HUET/ SEA SURVIVAL Training

•H2S/ BA AWARENESS Training

•Confined Space Entry Training

•Familiar with Permit to Work System(PTW)and one of the Performing Authority for Abu Dhabi Marine Operating Company (ADMA-OPCO) in Das Island (UAE Offshore)

•PTW Level – II (Permit to Work System) for ADGAS.

•Advanced Safety Auditing – Fire Fighting- H2S Awareness- BA-from ADGAS

I hope, that the particulars that given above will meet with your requirements and I shall be called for the Interview. I am confident in my abilities and if selected, I can successfully discharge the duties assigned to me for the satisfaction of superiors and the company.

Place : Brega, Libya (North Africa)

Date : 24th September 2024

PUSHPAKARAN PANDYATTU



Contact this candidate