Comprehensive Chemical Engineer with 32 years of national and international experience both in brownfield and greenfield from concept through execution, commissioning, startup and stabilization, Shutdowns and Turnaround of Plants and equipments in which I have worked: 13 years as a Process design consultant; 5 years in Planning, evaluation and execution of projects leader and 14 years in Operations and R&D; in the chemical (Phtalic Anhidride, PVC Additives, METOH), Oil & Gas Upstream, Midstream and downstream: treatments and Pipelines industries: specialist in gas, Technical Authority in Heavy Crude and EOR (cyclical and continuous steam injection); Petrochemical: Ammonia, polymers, resins, paints and coatings and refinery: atmospheric and vacuum distillation, Hydrocracking, Hydrotreatment, LPG, FCCU, Amines, sour waters, etc.; Renewables and biofuels and energy generation and management. Technical Skills
• Chemical Engineer: Technical and scientific principles, physicochemical, thermodynamic and unit operations laws. Resolution of technical issues.
• Processes’ Design: From Pre-feasibility studies up to EPCs, International Codes and Standards: GPSA, API, ANSI, ASME, NFPA, ISO, OSHA and statutory and regulatory specifications and good engineering practices.
• Design and evaluation Process simulation software's: Aspen HYSYS®, Instruclac®, Pipe Flow Expert®, Pipephase®, INPLANT®, PIPESIM®. And PRO/II®.
• Process Safety (PSM): Risk and hazard reviews and analysis (PHA) leader: SIMOPs, HAZIDs, HAZOPs, LOPA, What If, etc.
• Equipments, Packages, Utilities and essential services definitions: Criteria of Selection, Sizing, specifications; data sheets (DS), Plant and Equipment layouts and technical bid evaluations and tabulation of bid purchase offers.
• Generation, review, and approval of the Process deliverables: PFDs with H&MB, P&IDs, equipment specifications, Hydraulic, line sizing, relief and blowdown calculations and analyses; contingency analysis, design basis and criterias, process descriptions; Philosophies and Manuals of Operation and control; Listings: lines, Tie-Ins, relief summaries and Utilities’ consumption. Review and comment inter- disciplinary deliverables such as piping layouts, isometrics, 3D models, mechanical equipment specifications, etc in groups and multidisciplinary work teams. Reviewing requisitions and providing support to other disciplines.
• Project management: Maturation, Definition of scopes and Specifications, Coordination of multidisciplinary teams for the elaboration of deliverables in all phases: costs (CAPEX- Budgets), Purchases, Environmental, Land-Property, Social, Charter, SoR, SoW, WBS, Schedules, Risks, lessons learned, Engineering and specifications. Provide assistance and advice during procurement, construction and commissioning (Expert) activities.
• Plant Operations Manager: Perform process studies for troubleshooting of operational issues related to natural gas processing and liquefaction, Chemical Plants, R&D, Continuous improvement, KPIs, manuals, procedures. Conducting Process studies for production improvement and debottlenecking.
• MS® Office Tools: Advanced level use of Microsoft Office® office tools: Excel®, Word®, Power Point® and Visio®
• AutoCAD: Medium level
Soft Skills
Emotional intelligence, Resilience, Creativity, Integrity, Leadership and Influence, Initiative, Empathy and Flexibility, Continuous growth mentality, Analytical and critical thinking and Adaptation to Change. Work history
HATCH S.A., Bogotá D.C., Colombia.
SR PROCESS ENGINEER; August 2023 – Current
• Preconceptual Engineering director for the development of new fields in the Llanos HUB and expansion of CIS Technogy, DI for implemetation of Inteligence pulses water EOR Inyection. Massy Energy S.A.S.; Puerto Gaitan, Colombia
PROCESS AND OPERATIONS COMMISSIONING MASTER 2- (IM2) ENGINEER; August 2021 – December 2022 Contract: Staff hired; Customer Ecopetrol S.A. (Company where the works were carried out)
• Ideas were provided to simplify the process and define fewer teams for a successful start-up and against a 6- month delay Schedule in the two initial phases of the Project.
• Training, interaction, doubts were clarified and guidance and technical support was given to the entire team of Commissioning, Construction and Operations Engineers and technicians for mechanical completion and start-up as required.
• The basic and central equipment manuals were translated and diagrams and procedures were prepared for all site processes.
Worley Colombia S.A.S.; Bogota DC, Colombia
PRINCIPAL PROCESS ENGINEER; November 2020 – May 2021 Contract: Staff hired; Customer Ecopetrol S.A. (Company for which the work was carried out)
• The designs, specifications, standards and technical procedures and documents for the purchase and installation of 57 Measurement Systems in 16 Locations of 3 fields of the GMA (Lisama, Llanito and Province) were updated with a Detail Engineering where led a team of 10 Process Engineers; The works included visits to collect information in the field, interdisciplinary design review workshops Peer review and Design Review. Systematic and meetings with the Client.
• Ensure project specification details in FEED packages are feasible. Evaluate and compare various power pack documents and data sheets using scope of supply analysis.
• Supervise and review the performing, analysis and compatibility of the specific calculations and relevant deliverables the discipline including: diagrams: blocks, PFDs with Mass and Energy Balances, process equipment diagram (P&IDs): equipment data sheets / specifications, pressure-temperature diagrams; hydraulic calculations, Basis and Design Criteria, Process Description, reports; Philosophies and Operation Manuals; Listings: utilities, Industrial services, Equipment, lines and Tie-Ins.
• Apportion work among engineering staff according to training.
• Participate in the preparation of the Technical Document Register (TDR) for process activities, for all process deliverables. Identify and resolve discrepancies and divergences from original proposal through the instigation of technical queries to projects/client
• Supervise the verification of the integrity of the design (peer and design reviews) and identify discrepancies and inconsistencies and take corrective action when necessary.
• Organized and Led HAZOP Workshops for different projects in addition to the main assignment in Business Support.
HNA Engineering SA.; Bogota DC, Colombia
SENIOR PROCESS ENGINEER; September 2019 – April 2020 Contract: Staff hired; Customer Hocol S.A. (Company where the works were carried out)
• Operational emergency resolution for heavy crude oil with 5% BSW obtained from a drilling campaign, which forced a rapid and functional modification to optimize the Saldaña River treatment station with quickly equipment and Package units procurenment and utilities and essentials ampliations. Ingecontrol S.A.; Bogota DC, Colombia
PRINCIPAL PROJETS ENGINEER February 2018 – September 2019 Contract: Staff hired; Customer Ecopetrol S.A. (Company where the works were carried out)
• The objectives of starting drilling 57 wells in the Moriche field operated by MECL Mansarovar Energy Colombia were achieved to increase the production of Heavy Crude Oil with Improved Recovery with Cyclic Injection and to prepare the matrix for the start of continuous Steam injection acting as a Ripener. -Project Coordinator
(SoR, SoW, WBS) with a multidisciplinary team of Engineering, costs (CAPEX- Budgets), Purchasing, Environmental, Land-Premises, Social Management, Programming and Control (Organizational Chart, Schedules), Risks, construction and commissioning where I trained and mastered the process and the guidelines of Ecopetrol's EDP model.
• Identify the scope of work requirements, budgeted man hours, budgeted quantities, total number of deliverables, format of delivery, time schedules and other specifications for execution of the work. Recommend cost effective measures to reduce the overall project costs, ensuring technical and safety compliance.
Massy Energy S.A.S.; Acacias, Colombia
MASTER 2-COMMISSIONING PROCESS AND OPERATIONS ENGINEER; November 2017- February 2018 Contract: Staff hired; Customer Ecopetrol S.A. (Company where the works were carried out)
• Safe start-up, commissioning and stabilization of the equipment, units and systems of an In-Situ Combustion Unit (PIAR) with verification of all the specifications in the Mechanical Completion (Pre-Enlistment) indicated in the ID and in accordance with the contractual requirements. and the planning, programming, coordination and execution of procedures, functional tests and certificates. SGS Colombia; Corozal, Colombia
COMMISSIONING AND STARTUP LEADER: OPERATIONS AND PROCESSES October 2016 – March 2017 Contract: Staff hired; Customer: Summum Energy- HOCOL SA (Company where the works were carried out)
• The mechanical completion of all the equipment, systems and subsystems of the CPF-Bonga-Mamey Gas Plant in module 1 of 30 MMSCFD was ensured with the issuance of the Certification Matrix, Red Line and As built Plans by the builder and ensuring that all the systems and subsystems complied with the technical design standards and the Operation in all the processes.
• Commission and start all the units in a record time of two (2) months by using new strategies in the execution, planning and preparation of Start-up Procedures,
• The EHSS was assured, guaranteed and complied with, without putting people, assets, the process or the environment at risk.
AMEC-FOSTER WHEELER, Bogota DC, Colombia
FACILITIES, PROCESS & PROJECTS ENGINEER; June 2014 – October 2015 Contract: Staff hired; Customer Oxy-Occidental Colombia SA. (Company for which the work was carried out)
• LCI Field: Improvements and adjustments to all Processes: Restrictions, bottlenecks and failures in plants and stations were resolved. The crude treatment was increased from 16 to 32 KOPD (two direct fire heaters were installed (Fired Heaters of 25,000 BOPD each one). The gas system became independent and its use was changed from sales to electricity generation; where it interacted with customers and suppliers to define the scope and specifications of the projects, and prepare documents for purchases.
• Review of the ITB (Invitation to Bid) documents submitted in the proposals stage, provide process input to other disciplines, review techno-commercial vendor offers.
• Teca Field: Process Engineer: ID-Design and specifications were completed, the facilities of the main process and auxiliary services of the Extra-Heavy Crude Secondary Recovery Pilot with Continuous Steam Injection Technology were built and put into operation ( flood). HNA Engineering SA.; Bogota DC, Colombia
POSITION: SENIOR PROCESS ENGINEER AND STARTUP LEADER; July 2013 – November 2013 Contract: Staff hired; Customer HOCOL S.A. (Company where the works were carried out)
• Development of the IBE for all areas and process systems of the 60 MMSCFD Bonga-Mamey Gas Plant: Reception, storage-dispatch, stabilization and auxiliary Industrial services; in which I proposed and was approved the implementation of two independent trains of 30 MMSCFD Each one with the preparation of documents and Plans: Responsible for vendor packages like compressors, dehydration, sweetening, etc., ensuring package meets technical specifications. Also, responsible for issuing the inquiry and procurement of injection chemicals / catalysts / inert balls etc.
• Expansion of the fluid treatment capacity of the Ocelote Field CPF (Hocol) from 160 KB to 240 KBFPD with a safe and successful start-up.
Wood Group PSN SA; Bogota DC, Colombia
PROCESS ENGINEER; August 2011 – May 2013
Contract: Staff hired; Customer: Ecopetrol S.A.’ BarrancabermejaRefinery (Company for which the work was carried out)
• Transfer, expand, centralize and modernize the Storage System for Liquefied Gases (Propylene, LPG and Butanes) of the Barrancabermeja Refinery from 4k to 10K barrels as Leader of Engineering, Pre- commissioning, RSPA, Commissioning, Start-up, fine-tuning-stabilization and closure of the EPC project.
• 25% reduction in construction work with good planning, constructability analysis and execution. Energeticos (Energy Processes and Designs S.A); Bogota DC, Colombia PROCESS ENGINEER February 2010 – May 2011
Contract: Staff hired; Customer: OCENSA Pipeline (Company for which the work was carried out)
• Expand the capacity of the OCENSA Pipeline Pumping-transport systems from 430 to 560 KBPD and Modernize the Crude Fuel System at all stations with a drastic cost reduction of US$250,000 through leading improved equipment selection processes.
• As a commercial engineer I specialized in preparing Bids and offers for the development of engineering. SAR Enegy SA.; Bogota DC, Colombia
LEAD PROCESS ENGINEER; September 2009 – February 2010 Contract: Staff hired; Customer Hidrocasanare S.A.. (Company where the works were carried out)
• Modernization designs, assembly and installation supervision and 100% functional and safe start-up with good performance and efficiency of all the systems of a Primary distillation unit (Topping) of 10 kBPOD: Reception of crude oil, distillation column, stabilization and dispatch of products. TIPIEL S.A.; Bogota DC, Colombia
PROCESS ENGINEER; March 2009 – September 2009
Contract: Staff hired; Customer British Petroleum Colombia S.A.. (Company where the works were carried out)
• Increase and achieve the expansion of the production of the Cupiagua gas plant from 140 to 210 MMSCFD with a high impact of all items in time and cost with the elaboration of the FEED Engineering and an evaluation of design alternatives and financial feasibility. .
• Expand the production of extra-heavy crude oil at the Chichimene station from 10 to 20 KBPD with the implementation of naphtha dilution technology.
SNC Lavalin - ITANSUCA SA; Barrancabermeja, Colombia REFINERY AND PETROCHEMICAL PROCESS ENGINEER; July 2007 – March 2009 Contract: Staff hired; Customer: Ecopetrol S.A.’ BarrancabermejaRefinery (Company where the works were carried out)
• Execute improvements of the Processes and operations in all the plants of the Barrancabermeja Refinery with the development of Conceptual, Basic and detailed Engineering, Consultancies, Technical Support, Planning and execution of the Replacement and Investment Projects required with what was increased and plant safety and operability.
• Technical assistance to achieve shutdowns and maintenance rotations (Turnarounds) of safe Plants and with Schedule compliance.
Experience in Operations
FREELANCE- independent consultant -Tuberías Peruanas SAC; Lima, Peru DESIGNER, ASSEMBLER, STARTUP AND OPERATIONS LEADER March 2004 – December 2005 CARBOQUIMICA S.A.; Bogota, Colombia
PVC ADDITIVES PLANTS PRODUCTION AND OPERATIONS SUPERVISOR; October 1996 – May 1999 POLYCHEM S.A.; Guatire, Venezuela
PLANTS PRODUCTION AND OPERATIONS MANAGER; January 1995 – September 1996 PETROCHEMICAL SIMA S.A.; Charallave, Venezuela
PVC COMPOUNDS, PLASTICIZERS AND ADDITIVES PLANTS PRODUCTION AND OPERATIONS TECHNICAL MANAGER; July 1991 – September 1994
Education
BSC. CHEMICAL ENGINEER; Universidad Nacional de Colombia - Bogota D.C. – Colombia; July 1989 Graduation work: "Design, construction and operation of a VAM-acetic acid separation system by packet continuous distillation" Awarded with MERITORY MENTION PROJECT MANAGEMENT With MS Project applications and practices; Universidad Nacional de Colombia; Bogotá DC; June 2016
Courses
Universidad Nacional de Colombia, Bogota
• Microsoft Office®: Excel®, Word®, Power Point®, Project® and Visio®.
• Aspen HYSYS® 11.1, 2019.
• Cheese Making Technology, 2019
• Brewing Process and Management: Principles and Opportunities, 2018.
• Process Safety in the chemical industry, 2017
• Paints and Coatings (Theory and Practice), 2016
• Refining Processes: 05-06/2015 (Atmospheric and vacuum distillation, reforming, FCC, HDT and Mixtures)
SAP® and Access® Basic: CICCE Corporation -Bogotá DC – 03/2016
Industrial Automation: National University of San Marcos - Lima Peru, 10/2004
Fix Fundamentals: Intellution - Caracas – Venezuela, 06/1995 SENA- Bogota DC
• Control of Production and Improvement of Work Methods, 11/2003
• AutoCAD 2D and 3D, 04 -09/2002.
Languages Spanish: Mother tongue; English and Italian: Intermediate and German: Basic. Hobbies Playing Soccer, Woodworking and Traveling.