Post Job Free
Sign in

Traveling Superintendent Ground Up

Location:
Chicago, IL
Salary:
130.000
Posted:
September 24, 2024

Contact this candidate

Resume:

EDWARD J PRZYBY

630-***-****

********@******.***

Chicago IL.

Lamacchia Group. Oct 22-Present

Open remodel credit union just under 1 mil.

Just finishing off ground up credit union 2 mil.

BCCG June 2021 -June 2022

Built ground up Frito lay warehouse 3 mil.

Built ground up FedEx warehouse 8 mil.

WTR. Jan 2021-May 21. Open store remolded dicks sporting goods

Builtech LLC

Traveling superintendent

January 2020 till now.

Pet food store buildout 200,000

Burlington open store remodel 1.5 mil

Ranger benson

Sept 2018 through October 2019

Traveling superintendent

Dry Good Stores a high end lady clothing store a total of 4 each

Doing a total demo on the space to new HAVC, plumbing, carpentry, electric.

A lot of of high end and detail work. Also took care of warranty work at 5 stores

Advantage cost per store 1 mil to 1.5 mill

Did a little civil work work for them before I was let louse .

Horizon Retail Construction

2017 through 2018

Traveling superintendent

Medical Rehab center

Total demo and a complete rebuild new HAVC, plumbing, electric, carpentry

Cost 375,000

Party city

A total demo job then overseen the work of new plumbing, sprinkler system, HVAC, carpentry, new store front.

Cost 1.5 mil

Safe light auto glass

2 stores one in Oceanside California and one In Katy Texas

Both were total demo, new electric, plumbing, HAVC, carpentry, new overhead doors cut into the walls.

Cost for stores 230.000 and 270,000

Loccitane lady’s oil and perfume store

Store front, carpentry, electric, flooring, HVAC

Cost 150,000

Sherwin Williams

2 stores both rebrand

60,000 each

Retail contracting group

May 2015 through 2017

Traveling superintendent

Loppipops Candy Store

Was hired to replace the original superintendent who walked of the job.

Walked into a mess it was a complete build out took 3 weeks to straighten out ad get back on line.

Cost 180,00

America Best eye ware

A total of 4 stores

Complete gut and everything new, plumbing, electric, carpentry, HVAC.

Cost between 270,000 to 325,000

Sun Glass Hut

Store refresh

Paint, carpentry, electrical

Cost 90,000

Scrubs

Store refresh

New flooring, paint, carpentry cost 70,00

IHOP Restaurant

This was a old Panara, total demo

New plumbing, carpentry, HAVC, electric

500,000

Franchise one was so impressive gave the company 3 more to do

Evereves. High end lady’s fashion

Took this from a shell in a new strip mall, put in new electric service, plumbing, carpentry package, store front, HVAC. This was done running on a generator and completed in 3 months awaiting electric to come into the strip mall.

Cost 450.000.

Carpenter contractor

2011 through 2015

Self employed

Worked as a freelance carpenter for different companies till the economy picked up again

JTL construction inc

2004 through 2011

Owner

Preformed bidding, quality control, ran a office of 3 people and 10 carpenters

Company preformed day to day maintenance work along with commercial build outs

Small and large work. From 60,000 through 250,000

Built from the ground up in some cases wood and heavy metal framing while concrete was in place

Organic bakery 450.000

Medical office buildout 350,000

Chiropractic office

Took new space and built a 6 office space, bathrooms, break room, poured concrete floors throughout.

Cost 400,000

Ballard protection system. 500,00

Window replacement school 300,000

Overseen asphalt and concrete work 250,000

Inland Reality

1999 through 2004

Project manager

Assisted 10 property managers and took care of small repair work to tenant build outs

Ran a large underground water detention repair project 1.5 mil

Above parking garage structure concrete repair project. 180.000

Tenants buildout from 30,000 through 350,00

Back round

Spent 20 in the military

3 years active

17 national guard

Was a licensed contractor in the city of Chicago and other city’s and states

Was a licensed contractor to put up metal storage buildings

I work with procor construction program

High school diploma

Various training through out both my military and civilian carriers.

Have no problem working as a traveling superintendent and do not need to come home every few weeks.

Recap of list of projects

Pet super market 200,000

Burlington 1.2 mil

4. Dry Goods stores 1-1.5 mil

Party City 1.5 mil

Medical Rehab Center 370,000

2 . Safe Lite Auto 230-270

Loccitane 150.000

2 Sherwin Williams 60,000 each

4 Americans Best Eye ware 270,000-350,000

Sun Glass Hut 90,000

IHOP Restaurant 500,000

Evereves lady’s Clothing 450,000

Organic Bakery 450.00

Chiropractic office 400,000

Medical Offices 350,000

Ballard Protection 500,000

Window Replacement 350,000

Asphalt And Concrete. 250,000

Water Underground Detainson 1.5 mil

Parking Garage Repairs 180,000

Tenant Build Out 30,000 – 350,000

.



Contact this candidate