Post Job Free
Sign in

Safety Manager Project Management

Location:
Houston, TX
Salary:
65000.00
Posted:
September 23, 2024

Contact this candidate

Resume:

DAVID KORY PARTON

**********@*****.*** Houston, TX 281-***-****

PROFESSIONAL SUMMARY

Operations Leader and Safety Manager known for fostering cross-functional collaboration, leading safety initiatives, and executing preventive maintenance programs that enhance performance and minimize risk.

● Demonstrated leadership in safety coordination, training initiatives, and project management.

● Skilled in leading multidisciplinary teams to deliver projects on time, within budget, while maintaining stringent safety and regulatory compliance.

● Known for exceptional problem-solving skills and the ability to optimize operational efficiencies.

● Strong communicator and relationship builder with a track record of building productive supplier relationships.

● Committed to ongoing professional development to stay at the forefront of industry best practices, currently pursuing CAPM.

AREAS OF EXPERTISE

● Safety & Compliance Management: Preparing and submitting safety compliance reports, conducting safety inspections, leading incident investigations, and maintaining equipment for regulatory compliance.

● Pipeline Operations: Operating and maintaining natural gas pipelines, conducting preventive maintenance, troubleshooting equipment, and ensuring pipeline efficiency.

● Instrumentation Systems: Installing, calibrating, and maintaining instrumentation systems using technical schematics, blueprints, and P&IDs for industrial and construction environments.

● Purchasing & Procurement: Managing procurement processes, negotiating contracts, and ensuring timely material delivery while maintaining strict budget and audit compliance.

● Cross-functional Collaboration: Working with diverse teams to meet project objectives and align safety and procurement activities with timelines and budgets. EXPERIENCE

Energy Transfer - Houston Pipeline, Houston, TX

SAFETY COORDINATOR OPERATIONS TECH May 2000- Present

● Prepare and submit multiple safety compliance reports to regulatory agencies, maintaining up-to-date documentation for all safety-related activities with zero discrepancies monthly.

● Ensure all safety equipment, including fire suppression systems, gas detectors, and PPE, is regularly inspected and maintained in optimal condition.

● Lead incident investigations, root cause analysis, and corrective action planning to prevent future incidents and improve safety performance.

● Monitor and maintain the operation of 90 miles of natural gas pipelines to ensure peak performance.

● Conduct routine inspections monthly, perform preventive maintenance, and troubleshoot pipeline equipment, including valves, meters, and compressors to reduce downtime.

● Train and perform emergency response duties, ensuring rapid and safe resolution of pipeline issues while adhering to safety protocols and environmental regulations.

● Collaborate with cross-functional teams to conduct monthly safety audits, identify system improvements, and implement corrective actions to mitigate risks to reduce safety incidents.

● Maintain accurate records of equipment maintenance, repairs, and operational changes in compliance with industry standards and company policies.

● Coordinate safety protocols and training programs, leading various safety initiatives that have improved operational safety by 6%.

● Conduct precise measurements and data collection to enhance pipeline efficiency as a previous Measurement Tech.

Zachary Construction, Fairfield & Mt. Enterprise, TX INSTRUMENTATION November 2000-January 2001 & January 2002-May 2002

● Adhered to industry safety standards and company policies, including OSHA regulations, to facilitate safe installation of instrumentation systems at 2 new build co-gen plants.

● Interpreted blueprints, wiring diagrams, and P&ID (Piping and Instrumentation Diagrams) to accurately install and configure multiple instrumentation systems according to project specifications. Parton Resume, p.1

● Calibrated instrumentation systems using tools such as multimeters, loop calibrators, and signal generators to ensure the accuracy and reliability of instrumentation components.

● Inspected, diagnosed and resolved malfunctions in over multiple instrumentation systems, using technical schematics and diagnostic tools, which reduced downtime and ensured continuous operation across multiple projects.

● Maintained accurate records and detailed reports of instrumentation installation, calibration, and maintenance activities to provide project managers for compliance purposes. Gregory & Cook Pipeline Construction., Houston, TX February 2001-January 2002 PURCHASING AGENT

● Managed procurement of materials, equipment, and services for pipeline construction projects, maintaining a 97% on-time supply rate, contributing to the on-time completion of several major projects.

● Established and managed multiple local charge accounts with suppliers and vendors, streamlining the purchasing process to secure timely access to necessary materials.

● Processed purchase orders and maintained accurate procurement records, ensuring compliance with company policies and audit standards, resulting in zero audit discrepancies over a 2-year period.

● Coordinated billing processes between local suppliers, the Houston office, and clients, providing accurate invoicing and payment reconciliation.

● Collaborated with project managers, engineers, and finance to align purchasing activities with project timelines and budget constraints, reducing project material costs by approximately 10%.

● Resolved supplier issues related to quality, delivery, and pricing discrepancies, minimizing disruptions to the construction schedule.

ADDITIONAL PROFESSIONAL EXPERIENCE

Sales: Fred Haas Toyota World, Spring, TX 1 year

Owner: Double K Transportation, Henderson, TX 1.5 years Floorhand: Rowan Drilling, Inc., Louisiana 1 year

Outside Sales: Wilson Supply, Alexandria, LA 2 years CONTINUING EDUCATION

Certified Associate in Project Management (CAPM): Project Management Institute In progress Process Safety Management: 360 Training 2023

Leadership Certification: University of Houston 2011 Fundamentals of Supervision & Management I & II: University of Houston 2010 Microsoft Project Certification: University of Houston 2010 PROFESSIONAL TRAINING

Fiber Optic Installer Certification: College of the Mainland 2001

● Demonstrated a strong understanding of the principles of fiber optic technology, including light transmission, refraction, and attenuation, ensuring efficient and accurate installations.

● Constructed and installed fiber optic cables in compliance with industry standards, ensuring the stability and performance of telecommunication and data networks. ROV Technician Pilot Certification: College of the Mainland 2001

● Safely managed and maintained high voltage electrical systems in accordance with International Marine Contractors Association (IMCA) standards, reducing the risk of electrical hazards in subsea operations.

● Piloted and operated ROV systems in real-time, performing underwater inspections, repairs, and data collection for offshore projects.

● Used Crosby rigging equipment to perform precise and controlled lifting of ROVs and related machinery, ensuring safe handling and operation.

Parton Resume, p.2



Contact this candidate