Post Job Free
Sign in

Mechanical Engineer Lead

Location:
Taman Sari, 11150, Indonesia
Posted:
September 08, 2024

Contact this candidate

Resume:

Career Resume

Page *

Mochammad Setiyo Wahyudi

Principle/Lead Mechanical Engineer

Name : MOCHAMMAD SETIYO WAHYUDI

Nationality : Indonesian

Location/Address : Jakarta 12510, Indonesia

Mobile Number : +62 813-806 -80762

E-mail Address : ************@*****.***

****.******@*****.***

Status : Married with 3 children

Educational Background :

- 1999 – 2004 Bachelor Degree in Mechanical Engineering, Graduated Institute of Technology Sepuluh Nopember, Surabaya, Indonesia.

- 1983 – 1986 Technical Diploma 3 years Program of Mechanical Engineering, Polytechnic of Brawijaya University in Malang – East Java, Indonesia Career and Capability Summary:

I have experience about 31 (thirty-one) years include as Head of Department Mechanical Static and Package Engineering, as Lead Mechanical Static & Package Engineer, as Lead Combustion Engineer, as Principle Mechanical Engineer and as Mechanical Field Lead Engineer for Static equipment, Fired equipment and Package equipment for FEED, EPC Project mostly for Oil & Gas sector include LNG plant, Petrochemical plant for onshore and offshore plant (FLNG and FPU) facilities project. In Company corporate responsible, I have extensive experience as Haed of Department of Mechanical Static & Package Engineering and Principle Mechanical Engineer and Mechanical Subject Matter Expert (SME) to service all Project of Mechanical scope and to handle all include technical aspect, project document quality, engineering cold eye review, involve in project technical problem solving, project manning plan review, project CTR review, recruitment new personnel, project technical audit, mechanical personnel development and all mechanical department activities. My experience and expertise as Lead Mechanical Static & Package Engineer mostly to review and approve all project documents such as mechanical data sheet, specification, request for quotation

(RFQ), technical bid evaluation (TBE), design calculation, vendor documents/drawings for all static equipment, package equipment, fired equipment and the other parts my experience are selection of h

(Adopted from Ne

w D. E. Org.

Chart)

Career Resume

Page 2

qualified vendor/supplier, inter-disciplines coordination, external interface coordination with client and clarification with vendors as well. During FEED project, involve in feasibility study, conceptual design, and other disciplines study.

Involve in 3D model review up to 90% progress, equipment lay-out/plot plan review, mechanical handling study for maintenance access include lifting plan and involve in HAZOP/LOPA evaluation of all equipment static equipment, combustion equipment and package equipment as part of my responsible as Lead Mechanical Static & Package Engineer. My experience as Lead Mechanical Static and Package Engineer to handle Static equipment, Combustion/fired equipment and Package equipment such as, Static equipment: Pressure Vessel

(normal Vessel and Column), Heat Exchanger (Shell & Tube Heat Exchanger, Air Cooled Heat Exchanger, Plate Frame Heat Exchanger), API650 Field Erected Storage Tank, Electric Heater and Combustion equipment: Elevated Flare Stack, Packaged Boiler, Heat Recovery Steam Generator

(HRSG), Waste Heat Boiler, Deaerator, Thermal Oxidizer/Acid Gas Incinerator Package, Reaction Furnace, Desuperheater, Ducting System and other of combustion equipment, and also to handle package equipment: Water Treatment Package, Waste Water Treatment Package, Nitrogen Generation Package, Electrochlorination Package, Instrument Air Package (include Dryer & Compressor), Desalination Package, Hydrocyclone package, CPI Separator, Overhead Crane, Marine Loading Arm and HVAC.

In general, my experience to handle Static Equipment, Package Equipment, Fired/Combustion Equipment for Oil & Gas include LNG and Power Generation starting from feasibility study, FEED, EPC (detailed engineering) and also support Procurement, Construction and Commissioning activities. I have extensive experience for inspection, expediting during equipment shop fabrication also have experience for field engineering and problem-solving during site erection/construction for combustion equipment, static equipment and package equipment including mechanical completion to support commissioning activities.

I have experience assessment of fired equipment (fired heater, boiler, thermal oxidizer, flare package) include associated parts include burner, expansion below, refractory check condition for existing plant facilities.

I am familiar to design static equipment by using engineering software Compress, PV elite, AMETank. Familiar with international standards & codes for static equipment, package equipment and combustion equipment design such as ASME (Section I, II, V, VIII & etc.), API (Standard 521, 530, 537, 560, 650 & etc.), TEMA, NFPA & etc. standards/codes. I know that I was not young anymore but I always in healthy condition and I am able to work in project remote area in under pressure condition and multi-tasking matric work load to handle multiple projects in same time.

Foreign Experience and Assignment during in JGC Indoensia: Feb. 2000 – Mar. 2000 : Overseas assignment at site for field engineer, Installation and Commissioning supervision of Incinerator for Zeneca GC Project in Nantong - China.

March 2002 – July 2002 : Overseas assignment at JGC – Yokohama office, Japan for “Qatar Gas To Liquid Project”

May 2002 – Oct. 2002 : Overseas assignment at JGC – Yokohama for “Haradh Gas Project” Career Resume

Page 3

Oct. 2002 – March 2003 : Overseas assignment at JGC – Yokohama office, Japan for “FCC Gasoline Project”

Feb. 2005 – Aug. 2005 : Overseas assignment at JGC – Yokohama office, Japan for Early Engineering work of “Tangguh LNG Project”

Career Highlights:

A. Working Experience Summary Done in Worley SEA Indonesia: 1. March 2023 – Present, Job assignment for Compression, FEED Tangguh Ubadari Carbon Capture PROJECT as part of Tangguh LNG Plant facilities as Lead Mechanical Static & Package Engineer for the following responsibilities:

- Manage Mechanical Static and Package Engineering team to handle deliverable scope for Package Equipment, Fired Equipment, Static Equipment, Mechanical Handling Study and HVAC for FEED Onshore work execution.

- Mechanical Static and Package Scope equipment include Pressure Vessel, Column, Shell

& Tube Heat Exchanger (STHE), Air Cooled Heat Exchanger (ACHE), Electric Heater, Filter, Field Erected Storage tank, Waste Water Treatment Package, Nitrogen Generation Package, Chemical Injection Package, TEG Package, Condensate Polishing Package, Insrument Air Package (include Air Dryer and Air Compressor), Combined Cycle Power Plant min. 171 MW capacity include Heat Recovery Steam Generator (HRSG), Air Cooled Condenser Package

(ACC), Overhead Crane, Cold Vent Stack, etc.

- To review and approve all key Project documents as Mechanical Static and Package scope include Mechanical Data Sheet, Project Specification, Requisition (RFQ), Mechanical Strength Calculation, STHE/ACHE Thermal Rating, Technical Bid Evaluation (TBE), Design Basis, Mechanical Handling Study Report and etc.

- Involve in 3D Model review, and Mechanical Handling study for 30%, 60% progress.

- Involve in Plot Plan review with all disciplines.

- Involve in HAZOP and LOPA study for Static, Package and combustion equipment. B. Working Experience Summary Done in Chiyoda International Indonesia: 2. December 2021 – February 2023, Job assignment for 3.8 MPTA LNG Tangguh Expansion Project Train-3 as Mechanical Field Lead Engineer for the following work load and responsibility:

- Manage Mechanical Field Engineering team to handle scope of Package Equipment, Static Equipment and Fired Equipment installation and Construction.

- All equipment under responsible include Static Package & Fired equipment of Pressure Vessel

(Column Vertical Vessel), Heat Exchanger (STHE, ACHE, MCHE, Electric Heater, PFHE), Above ground storage Tank, etc. Package equipment of Water Treatment, Waste Water Treatment Package, Desalination Package, Electrochlorination Package, Nitrogen Generation Package, Chemical Injection Package, Air Cooled Condenser Package, Marine Loading Arm, Over Head Crane and etc. Combustion Equipment of Flare Package, Package Boiler, HRSG, Acid Gas Incinerator/Thermal Oxidizer, Deaerator.

- To keep all final detail engineering to be implemented on actual mechanical equipment installation and construction.

Career Resume

Page 4

- To handle installation and construction problem solving for all scope of mechanical equipment include any modification, strength calculation verification, evaluate actual condition at site, and etc.

- To control and ensure all HAZOP recommendation well to be implemented onto all Mechanical equipment installation.

- To ensure all mechanical equipment ready and there is no problem, outstanding for Mechanical Complation.

- To involve during mechanical equipment pre-commissioning, commissioning and to ensure all the support activities running well.

- Always ready, stand-by to support Commissioning team till mechanical equipment ready for start-up and normal operation.

C. Working Experience Summary Done in PT. Tripatra Engineers and Constructors (Local Oil

& Gas EPC Company), Jakarta - Indonesia:

From January 2011 – August 2021

1. June 2020 – August 2021, job assignment for FEED Sakakemang Block (Indonesia BU) Project as Mechanical Principle Engineer for the following work load and responsibility:

- Mechanical Scope equipment include Pressure Vessel, Column, Shell & Tube Heat Exchanger (STHE), Air Cooled Heat Exchanger (ACHE), Shop Fabricated Storage tank, Waste Heat Recovery Unit Package, Pipeline, etc.

- To review all key Project documents as Mechanical scope include Mechanical Data Sheet, Project Specification, Requisition (RFQ), Mechanical Calculation, STHE/ACHE Thermal Rating, Technical Bid Evaluation (TBE), and etc.

- Involve in 3D Model review and Mechanical Handling study for 30%, 60% and 90% progress. 2. October 2020 – April 2021, job assignment for DED Wilmar - Crude Biodiesel Downstream Processing Project as Mechanical Lead Engineer and Principle Engineer for the following work load and responsibility:

- Mechanical Scope equipment include Pressure Vessel, Column, Shell & Tube Heat Exchanger

(STHE), Plate Frame Heat Exchanger (PFHE), Shop Fabricated Storage tank, Sand Filter, Chiller Package, Cooling Tower Package, etc.

- To review all key Project documents as Mechanical scope include Mechanical Data Sheet, Project Specification, Requisition (RFQ), Mechanical Calculation, Technical Bid Evaluation (TBE), and etc.

- Involve in 3D Model review and Mechanical Handling study for 30%, 60% and 90% progress.

3. July 2020 – March 2021, job assignment for DED Wilmar – GAC Project as Mechanical Principle Engineer for the following work load and responsibility:

- Mechanical Scope equipment include Pressure Vessel, Column, Shell & Tube Heat Exchanger

(STHE), Plate Frame Heat Exchanger (PFHE), Shop Fabricated Storage tank, Filter, Cooling Tower Package, Jet Mixer, etc.

- To review all key Project documents as Mechanical scope include Mechanical Data Sheet, Project Specification, Requisition (RFQ), Mechanical Calculation, Technical Bid Evaluation (TBE), and etc.

Career Resume

Page 5

- Involve in 3D Model review and Mechanical Handling study for 30%, 60% and 90% progress.

4. September 2020 – August 2021, job assignment for FEED and DED Revamping THERMAL Destilate Hydrotreating (TDHT) Unit RU IV Cilacap as Mechanical Principle Engineer/Mechanical Technical Advisor position as the following work load and responsibility:

- Mechanical Scope equipment include Pressure Vessel, Column, Shell & Tube Heat Exchanger

(STHE), Air Cooled Heat Exchanger ACHE), Revamping Existing Fired Heater, Reformer, Field Erected Storage Tank Internal Floating Roof Type, Aluminum Dome Roof, Fixed Dome Roof, Fixed Supported Cone Roof, Water Treatment Package, CPI Separator, etc.

- To review all key Project documents as Mechanical scope include Mechanical Data Sheet, Project Specification, Requisition (RFQ), Mechanical Calculation, Technical Bid Evaluation (TBE), and etc.

5. January 2018 – June 2020, job assignment for Emily 1 Project (Fuel Terminal & Jetty Project) as Mechanical Principle Engineer/Mechanical Technical Advisor position as the following work load and responsibility:

- Mechanical Scope equipment include Field Erected Storage Tank Internal Floating Roof Type, Aluminum Dome Roof, Fixed Dome Roof, Fixed Supported Cone Roof, Sea Water Reverse Osmosis, API Separator.

- To review all key Project documents as Mechanical scope include Mechanical Data Sheet, Project Specification, Requisition (RFQ), Mechanical Calculation, Technical Bid Evaluation (TBE), Vendor Selection, Vendor Document Review, Support QC for Equipment Vendor Shop Fabrication, Support Construction for Equipent site erection and problem solving.

6. June 2017 – December 2018, job assignment for PT. Jakarta Tank Terminal Phase-2A Project

(Vopak Project) as Mechanical Principle Engineer/Mechanical Technical Advisor position as the following work load and responsibility:

- Mechanical Scope equipment include Field Erected Storage Tank Internal Floating Roof Type, Fixed Dome Roof, Fixed Supported Cone Roof, Sea Water Reverse Osmosis, API Separator.

- To review all key Project documents as Mechanical scope include Mechanical Data Sheet, Project Specification, Requisition (RFQ), Mechanical Calculation, Technical Bid Evaluation (TBE), Vendor Selection, Vendor Document Review, Support QC for Equipment Vendor Shop Fabrication, Support Construction for Equipent site erection and problem solving

7. August 2016 – August 2021, job assignment for EPC of LNG Tangguh Expansion Project, 3.8 MPTA capacity for the following work load and responsibility for Combustion equipment including HRSG, Packaged Boilers, Acid Gas Incinerator/Thermal Oxidizer, Flare Package, Deaerator, Hazardous & Non-Hazardous Incinerator Package, Static equipment include Pressure Vessel, Heat Exchanger, Storage Tank and etc.:

- Prepare, review of project specification, mechanical data sheet, inspection data sheet, requisition, technical bid evaluation, vendor selection. Career Resume

Page 6

- Review vendor technical quotation and commercial proposal for Combustion equipment including HRSG, Package Boiler, Acid Gas Incinerator, Flare Package, Deaerator, and Hazardous & Non-Hazardous Incinerator Package.

- Review vendor documents and drawing for all combustion equipment package boiler, heat recovery steam generator (HRSG), deaerator, thermal oxidizer/acid gas incinerator, flare package, hazardous incinerator package, non-hazardous incinerator, fired heater.

- Inter-disciplines coordination, inter-disciplines check, to provide loading data for civil discipline.

- 3D model review, to review and evaluate equipment 3D model to consider mechanical handling study, accessible for maintenance in 30%, 60% and 90% progress.

- Involve in HAZOP and LOPA study for combustion equipment

- To support procurement for equipment shop fabrication inspection.

- To support construction for equipment site installation/erection up to mechanical completion.

- To support commissioning for combustion equipment pre-commissioning, commissioning and start-up activities.

8. January 2016 up to July 2016, job assignment for several proposal project for the following work load:

- Gas Treating Plant of Jambaran Tiung Biru EPC Proposal Project as mechanical static engineering Mechanical Principle Engineer, to handle as below work load: a. Review project specification, mechanical datasheet b. Mechanical combustion equipment (package boiler, thermal oxidizer, reaction furnace, waste heat boiler, flare & ignition system, deaerator); Mechanical static equipment scope including pressure vessel/column, shell & tube heat exchanger, air cooled heat exchanger, storage tank (shop fabricated and field erected), filter, pig trap; Mechanical package equipment including water treatment, air cooled condenser. c. Technical clarification to Vendors

d. Review Vendor proposal for both technical and commercial proposal e. Review Technical Bid Evaluation (TBE) for all static equipment includes combustion equipment and package equipment.

f. Review budget of all mechanical static scope

- FPSO SANTOS Ande Ande Lumut Proposal Project as lead mechanical static engineer, to handle as below work load:

a. Review project specification, mechanical datasheet b. Mechanical static equipment scope including pressure vessel/column, heat exchanger, package equipment, combustion equipment.

c. Technical clarification to Vendors

d. Evaluate Vendor proposal for both technical and commercial proposal e. Review Technical Bid Evaluation (TBE) for static equipment includes combustion equipment and package equipment.

9. December 2014 up to December 2015, job assignment for FEED LNG Tangguh Expansion Project 3.8 MPTA capacity as Lead Combustion Engineer to handle Package Boiler, Fired Heater, HRSG, Career Resume

Page 7

Flare stack including flare tip with ignition system, Thermal oxidizer/Acid Gas Incinerator, Deaerator, Hazardous Incinerator and Non-Hazardous Incinerator and Static Equipment include Pressure Vessel, Heat Exchanger (Shell & Tube HE and Air Cooled HE), Storage Tank, etc. The Client name BP and FEED scope of work for this project to prepare and review up to final approval by Client, as below:

- Project specification

- Mechanical Data Sheet

- Inspection Data Sheet (Inspection Test Plan)

- Requisition/RFQ (Request For Quotation)

- Technical bid evaluation, to evaluate Vendor technical proposal to get optimum cost and proper equipment design.

- To support other disciplines process study and simulation for plant optimum design.

- To support Procurement to provide equipment cost budgeting

- 3D model review, to review and evaluate equipment 3D model to consider mechanical handling study, accessible for maintenance.

- Involve HAZOP and HAZID evaluation that related with mechanical equipment. 10. June 2014 up to January 2015, job assignment for JKK FPU Jangkrik Project as Lead Mechanical Static Engineer in PT. Tripatra Engineers and Constructors consortium with Saipem, and Chiyoda to handle static equipment including Pressure Vessel, Column, Shell & Tube Heat Exchanger, Plate

& Frame Heat Exchanger, Hair Pin Heat Exchanger, Pig Trap, Filter, Sea Water Outfall Vortex. The Client name: Eni.

The EPC scope of work in this project including:

- Project specification

- Mechanical Data Sheet

- Inspection Data Sheet

- Requisition/RFQ (Request for Quotation)

- Technical bid evaluation (TBE) to select proven Vendor to supply static equipment

- Review Vendor document, drawing and procedure

- To support Procurement and QC for equipment inspection and expediting during fabrication

- To support Construction to solve the problem during equipment installation and construction

- To support Commissioning to solve problem during commissioning activities.

- Involve 3D model review include equipment layout review, Mechanical handling study and maintenance access/routing.

- Involve HAZOP and HAZID evaluation that related with mechanical equipment. 11. February 2013 up to September 2014, job assignment for FEED FLNG Offshore Inpex Masela Project as Lead Fired/Combustion Engineer in PT. Tripatra Engineers and Constructors consortium with Saipem, Chiyoda and PT. Rekayasa Industri, SBM to handle Flare stack including tip & ignition system, Package Boiler, etc. include Static equipment. The Client name Inpex International. The scope of FEED deliverable and FEED activities for this project as below:

- Project specification

Career Resume

Page 8

- Mechanical Data Sheet

- Inspection Data Sheet (Inspection Test Plan)

- Requisition/RFQ (Request for Quotation)

- Technical clarification with Supplier/Vendor

- Technical bid evaluation (TBE)

- To support other disciplines Process to perform study

- Involve 3D model review include equipment layout review, Mechanical handling study and maintenance access/routing.

- Involve HAZOP and HAZID evaluation that related with mechanical equipment. 12. August 2012 up to December 2013, job assignment for Senoro Gas Treating Project as Mechanical Principal Engineer for detail engineering design of combustion equipment including static equipment and package equipment, the equipment scope including thermal oxidizer, flare & ignition system, air cooled condenser, packaged boiler, shell & tueb heat exchanger, air cooled heat exchanger, pressure vessel, storage tank, etc. Responsible :

- To advise mechanical static to execute project for all combustion equipment & static equipment scope as per project master schedule and within project budget.

- To review datasheet, requesition, specification, technical bid evaluation for critical and long lead static & combustion equipment until selection vendor, loading data for civil foundation design, vendor documents & drawing review.

- Scope static and combustion equipment are Pressure Vessel, Column, Filed Erected Tank, Shell

& Tube Heat Exchanger, Air Cooled Heat Exchanger, Thermal Oxidizer, and Water Treatment Package.

13. March 2011 up to December 2013, job assignment for Oil Production Processing Facilities of Banyu Urip Project EPC-1 as Lead Mechanical Engineer in PT. Tripatra Engineers and Constructors consortium with Samsung Korea. The work starts from early engineering work and continue detail engineering execution. The mechanical static and combustion equipment scope of supply and scope of work for this project as below.

- Equipment scope : Package Boiler, Heat Recovery Steam Generator (HRSG), Deaerator, Thermal Oxidizer completed with Waste Heat Boiler, Reaction Furnace completed with Acid Burner & Waste Heat Boiler, Elevated Flare Stack, Pressure Vessel, Column, Shell & Tube Heat Exchanger, Air Cooled Heat Exchanger, Plate & Frame Heat Exchanger, Field Erected Tank, Filter, Wet Surface Air Cooled Heat Exchanger Package, Desuperheater, Hydrocyclone, Boiler Feed Water Treatment Package, Waste Water Treatment Package, CPI Separator, Pig Launcher/Receiver, Internal Vessel & Column, Sulfur Seal Leg and etc.

- Providing equipment datasheet, technical specification, requisition for all static equipment.

- Technical bid evaluation for qualified Vendor selection to supply all static equipment.

- Selection qualified Vendor (Indonesia local Vendor and International Vendor) to supply all static, combustion and package equipment.

- Executing strength calculation for pressure vessel, column, and field erected tank, shell & tube heat exchanger.

- Executing thermal rating/equipment sizing for shell & tube heat exchanger by using HTRI. Career Resume

Page 9

- Interdiciplines check including P&ID review, Plot Plan review, process datasheet review, design review.

- Providing equipment loading data for civil foundation design for all static equipment.

- Executing vendor document, vendor drawing, detail strength calculation and procedure review.

- Supporting QC to execute equipment shop inspection including factory acceptance test (FAT), site acceptance test (SAT).

- Supporting to Procurement for inland transportation limit study on oversize static equipment.

- Supporting to construction for static equipment site construction and erection/installation, including field engineering and problem solving.

14. January 2011 – December 2012, job assignment for South Sumatra NGL Project as Technical Advisor (Principal Engineer) for detail engineering design of static equipment and combustion equipment, such as Pressure Vessel, Shell & Tube Heat Exchanger, Flare Package, Fired Heater, Field Erected Tank, and etc.

C. Work done at PT. JGC INDONESIA

Work Experience and Overseas Assignment during working for PT. JGC Indonesia: 1. October 2008 up to January 2011, job assignment for Mechanical Static Department manager to control general mechanical static work activities, several job project execution and proposal job execution in JGC Indonesia Jakarta head office, as the following responsibilities :

- Managerial work as Mechanical Static Department Manager and Combustion Group Manager.

- Engineering work as engineering auditor and principal engineer, to review all mechanical design engineering product, engineering execution plan, to review vendor selection during project execution for all mechanical scope of all on going project.

- Feasibility study, Constructability Study, FEED of several Oil Refinary Plant Projects for Pertamina RU-III Plaju, RU-IV Cilacap, RU-V Balikpapan, RU-VI Balongan.

- Mechanical Lead Engineer for proposal job of CPP Gas Processing Plant Gundih Project/PPGJ Project.

- Mechanical Lead Engineer for proposal job of Oil Processing Plant MCL Banyu Urip EPC-1 Project.

- Mechanical Lead Engineer for Coal Slurry Demo Plant Project. 2. August 2005 up to October 2008, job assignment for Tangguh LNG Project as Senior Combustion Engineer for engineering work in Jakarta Project Office, for job and responsibilities :

- Providing equipment datasheet, technical specification, requisition for all combustion equipment.

- Technical bid evaluation for qualified Vendor selection to supply all combustion equipment.

- Design and review for all vendor document and drawing include procedure, general assembly drawing, and detail drawing for all equipment.

- Review vendor document and vendor drawing for fired heater, Vent Stack, Flare Stack, Package Boiler, Heat Recovery Steam Generator, Incinerator, Deaerator, Fired Heater and other of combustion equipment.

Career Resume

Page 10

- Coordination among of inter disciplines project team, coordination with BP/client and coordination with vendors also coordination with construction project site for equipment installation.

- Field engineering work and problem solving during combustion equipment and static equipment installation at Papua Project site.

- Field problem solving during pre-commissioning of combustion equipment and static equipment.

- Supporting work on procurement activities, i.e. expediting and vendor’s shop inspection for combustion equipment fabrication.

- Involve in document preparation and during HAZOP study for combustion equipment. 3. February 2005 up to August 2005, On the job assignment in JGC Corporation Yokohama-Japan Office for early engineering of Tangguh LNG Project Train-1 and Train-2 for 2 x 3.8MTPA Plant Capacity, as Senior Mechanical Engineer with job and responsibilities :

- Prepare and review requisition, specification, and equipment data sheet for Flare stack, Incinerator, Fired Heater.

- Prepare and review of vendor technical evaluation report for Flare stack, Incinerator/Thermal Oxidizer, Fired Heater to get BP/client approval.

- To evaluate and select qualified vendor for Flare stack, Incinerator, Package Boiler, Deaerator, Heat Recovery Steam Generator, Fired Heater.

4. March 2002 up to March 2003, On the job assignment in JGC Corporation YOKOHAMA-JAPAN Office for several Oil & Gas Project, as Senior Mechanical Engineer with job and responsibilities :

- Design and preparation document of Fired Heater, Stack and another combustion equipment.

- Prepare and review strength calculation for Fired Heater, Stack/Flare Stack and other combustion equipment.

- Prepare BM/BQ of Fired Heater, Stack and another Combustion Equipment for project construction information data.

- Review vendor document and drawing for Fired Heater, Stack/Flare Stack and other of combustion equipment.

5. July 1995 up to 2002 in PT. JGC INDONESIA, as Senior Mechanical Engineer and Lead Mechanical Engineer with job and responsibilities :

- Design and review of the strength calculation for static equipment & combustion equipment such as pressure vessel, column/tower, heat exchanger, tank, vent stack, flare stack & fired heater with related standard & code.

- Design and review of engineering drawing, detail drawing/shop drawing and data sheet for static equipment and for fired heater also other combustion equipment.

- Review of equipment data sheet, project specification and requisition for static equipment and combustion equipment.

- Technical evaluation of vendor proposal to select the recommended vendor.

- Technical coordination with vendor, client and inter disciplines project task. Career Resume

Page 11

- Prepare BM/BQ, estimation engineering man-hour and manpower mobilization planning, proposal document scope of static equipment and combustion equipment for proposal/estimation work.

- Expediting and Inspection work during process fabrication of pressure vessel, heat exchanger, platform/ladder, steel structure, storage tank, fired heater, incinerator, stack, flare stack, ducting system, etc.

2002 – 2010

1. Project : Tangguh LNG Project Train #1 & Train #2 Project Location : Papua, Indonesia

Plant Owner : BP Berau Ltd.

Position held : Senior Furnace & Combustion Engineer Responsible for :

- Design and Review vendor drawing & document for Incinerator, Flare Stack, Fired Heater.

- Coordination among inter disciplines project team, coordination with BP/client and coordination with Vendors, also coordination with construction at site for equipment installation.

- Construction work

- Prepare requisition, data sheet, specification, technical vendor evaluation and vendor selection for Flare Stack, Fired Heater, Incinerator and other of combustion equipment

- Design and Review vendor drawing & document for Incinerator, Flare Stack, Fired Heater and other of combustion equipment

- Coordination among inter disciplines project team, coordination with BP/client and coordination with Vendors, and coordination with construction at site for equipment installation.

- Field engineering work and problem solving during combustion/static equipment installation at Papua project site.

- Field



Contact this candidate