Post Job Free
Sign in

Mechanical Engineering

Location:
Surrey, BC, Canada
Salary:
18
Posted:
September 08, 2024

Contact this candidate

Resume:

DARAMOLA NADEEB OMOLARA

(GLOBAL **** P&G CEO AWARDEE)

**** ******, ******, ** *** 1K8, CANADA.

+1-236-***-**** ******.********@*****.***

MECHANICAL ENGINEERING GRADUATE

LEAN MANUFACTURING PROGRESSIVE MAINTENANCE SAP PM

MAINTENANCE COST MANAGEMENT SYSTEMIC PROBLEM SOLVING

OBJECTIVE

Seek to be the best at all times through consistently striving for excellence and precision in all environments and in all situations.

CORE COMPETENCIES

LOSS ELIMINATION TOOLS SYSTEMIC ROOT CAUSE ANALYSIS PROCESS-

IMPROVEMENT AUTONOMOUS MAINTENANCE SPREADSHEET PROFICIENCY

LEAN MANUFACTURING TOOLS SAP PM PROGRESSIVE MAINTENANCE EXPERT

EDUCATION

2021] [ P&G DRY LAUNDRY [TOWER] PROCESS UNIVERSITY 2021 ] [Certificate in Dry Laundry Manufacturing Process]

[2010] [ Science Lord Consulting ] [ Palm-Groove, Lagos ]

[ Certificate/Business Modelling, Automation and Data Analysis using Excel 2007]

[2004-2009] [ University of Ibadan ] [ Ibadan, Oyo state ]

[ B.Sc/Mechanical Engineering]

[2nd Class Upper Division]

[2001-2003 ] [ The Polytechnic Ibadan ] [ Ibadan, Oyo state ]

[O.N.D/Mechanical Engineering]

[Upper credit]

[1994-2000 ] [ Iganmode Grammar School ] [ Ota, Ogun state ]

[Senior School Certificate Examination]

[Sport Prefect, 1999/2000 set]

[1988-1994 ] [ St. Paul African Church School ] [ Ilupeju, Lagos state ]

[First School Leaving Certificate]

[Health Prefect, 1993/1994 set]

HIGHLIGHT OF EMPLOYMENTS

[ JAN 2022-Aug 2024 ] [ Ugee Chemicals Limited, Ariel Detergent Making Synthetic Granule Dept. ] [ Ibadan, Nigeria ]

Role: Plant Transport Operations/ Maintenance Leader

Lead the planning, execution and performance review of all maintenance activities in the manufacturing plant. This include pumps, conveyors, reactors, mills, elevator, fans e.t.c

Lead maintenance of warehouse trucks, forklift and cranes

Lead analysis of equipment breakdowns and define basic actions to resolve and prevent reoccurrence

Lead the maintenance system for company vehicles for maintenance, servicing and repairs

Lead optimization of lubrication systems for vehicles to optimize cost.

Lead efforts to improve spares sourcing to optimize cost.

[ JULY 2017-JAN 2022 ] [ Procter and Gamble Nig. Ltd., Fabric & Home Care Plant. ] [ 1st Commercial Rd., Oluyole Industrial Estate, Ibadan, Oyo state ]

Role: Site Progressive Maintenance Leader/Maintenance Planner

Responsibilities:

Lead the planning and executions of monthly, quarterly and yearly maintenance of the factory equipment including pumps, belt and screw conveyors, mills, fans, elevator, mixers, hoists e.t.c

Lead the warehouse department in maintenance of shipment trucks, forklift and scissors lift.

Use SAP PM to plan, manage and lead execution of maintenance plan weekly, monthly and yearly

Train and retrain operators on how to use SAP PM for notification and order managements, backlogs management e.t.c

Lead weekly maintenance planning meetings to implement health checks om Maintenance Planning and Scheduling work processes.

Work with the storeroom to define right spares and manage vendors to optimize inventory management.

Lead the Maintenance Cost Management work process with the view as to optimize maintenance cost.

Provide the needed technical support, including leveraging external support to resolve production issues.

Defines the right spares for our technology in the storeroom and ensure that excess and obsolete inventories are eliminated.

Provides change management inputs and ensure that initiative FADO and minor spares scrap are done for the lines.

Defines the TBM for all tasks in our technology by leveraging local experience and best practices of other sites.

Ensures that SIMPTWW and JSAs are developed for all TBM tasks on the lines and that these are used for maintenance.

Ensures that the right functional location structure is developed and maintained for the site.

Coaches operating teams on BCC 6W2H and other problem-solving tools

Leads the execution of PM steps on the line and ensure that IWS criteria are met.

Leads weekly PR hoshin for the technologies and review with the ODM.

Develops training materials and procedures for all Area and ensure that operating teams are trained and qualified.

Attends weekly Progressive Maintenance planning meetings.

Delivers at least one improvement project for the area owned per month as a result of rigorous hoshin analysis.

Lead EOs and Project Start Ups for the lines.

Delivers Pillar IWS phase Expectations.

Shares crisp problem statements, root causes and action plans for top 3 losses on the lines on a daily basis in the DDS.

Conducts Safety tours (BOS/OFS/OGC/Hazard Survey) as per department/site schedule.

Backs up for the site process leader as needed in the DDS and PM meetings.

Delivers Pillar IWS phase Expectations.

Conducts Asset count for owned assets as per schedule and drive resolution of outages.

Conduct weekly HC of owned RTT DMS in the department/module, conduct gap analysis and execute countermeasures.

Complete and review 5rocks as per plan.

Role: MSG Team Leader

Responsibilities:

Leads and manage the running of both tower and admix operation for the team

Act as communication link between the operation and the line, departmental and module manager

Calculate, analyze and send shiftly report (including PR, rate, safety, quality, production, center-line, CIL e.t.c) to the plant management team

Confirm production for the shift on SAP

Co-ordinate and lead shift DDS meeting at the beginning of the shift

Plan daily production execution based on SAP production plan and co-ordinate resources to execute the production plan

Co-ordinate team members DDS systems to ensure right and timely execution

Plans team daily 24 action plan in the absence of plant technical planner.

Leads team shiftly end-of-the-shift critique and RCAs

Interact between the plant training system owner and team members to ensure timely completion of training

Allocate contract staff to respective floors based on availability

Communicate KPI index for contract staff with the management

Ensuring compliances across the plant including 5S, safety, quality, stewardship e.t.c

Leading self DDS systems assessment (Health check) for the team monthly to assess how well the systems are doing.

Training of new staffs and contract staffs in the team

Role: Shift Tower Leader (mechanical)

Responsibilities:

Consolidate production plan on SAP with material logistics and across-the-floors operations

Confirm actual production after production of formulation completes

Share defect handling results with the team and generate action plans including completion tracking

Update department result on Daily Management System owned on shiftly basis.

Carrying out hoshin analysis on losses on Autonomous Maintenance owned equipment and area losses

See to the effective running of the tower operation during the shift

Carry out shiftly inspection on all tower equipment

Fix all issues (stops, failures or breakdown) on all tower equipment during the shift

Carrying out Planned, corrective and autonomous maintenance as planned on all tower equipment.

Leading MCAs on breakdown and failures on any tower equipment and giving technical support to TSG (Technical Support Group) team on IFA (In-depth Failure Analysis) and Breakdown Elimination Program

Carrying out and implementing Quality Maintenance (QM) and Focus Improvement (FI) on tower equipment and process with view to reducing losses.

Ensure and see to safety, quality and Process Control Strategies (PCS) compliance on tower equipment

Researching and carrying out improvements and kaizens on tower equipment with view of reducing and elimination production and process losses.

Role: Add-mix Operation Leader

Responsibilities:

Oversee all manufacturing operation on the add-mix floor including minor solids addition, enzymes dumping, mixing operation and bulk solid supply to the crutcher

Carry out mechanical and electrical inspections on add-mix floor equipment including the mixer, remelt tank, tower nozzles, re-blend belt and carbonate screw conveyors

Lead Root Cause Analysis (RCA) in case on failure on add-mix equipment and processes

Lead Multi Cause Analysis (MCA) in case on Quality or Safety Incidents

Carrying out and implementing Quality Maintenance (QM) and Focus Improvement (FI) of Add-mix floor equipment and process with view to reducing losses.

Ensure and see to safety, quality and Process Control Strategies (PCS) compliance on Add-mix floor equipment

Researching and carrying out improvements and kaizens on add-mix floor equipment with view of reducing and elimination production and process losses.

Implementing on add-mix floor activities contributing to the Plant Compelling Business Need (CBN).

Partook in Planned Maintenance (PM) on floor equipment.

Add-mix floor Batch Production Record(BPR) co-ordination and documentations.

[ JULY 2008-JULY 2010 ] [ Procter and Gamble Nig. Ltd., Fabric & Home Care Plant. ] [ Ibadan, Oyo state ]

Role: L0 floor owner/Raw Material Logistics

Responsibilities:

In charge of all pumps in L0 and the boiler carrying out both Autonomous and planned maintenance on them.

Carry out mechanical and electrical inspections on L0 floor equipment.

Lead Root Cause Analysis (RCA) in case on failure on L0 equipment and processes.

Lead Multi Cause Analysis (MCA) in case on Quality or Safety Incidents.

Carrying out and implementing Quality Maintenance (QM) and Focus Improvement (FI) of L0 floor equipment and process with view to reducing losses.

Ensure and see to safety, quality and Process Control Strategies (PCS) compliance on L0 floor equipment.

Researching and carrying out improvements and kaizens on L0 equipment with view of reducing and elimination production and process losses.

Implementing on L0 activities contributing to the Plant Compelling Business Need (CBN).

Requesting and line-receipting of material into the MSG production line .

Coordinating brand changeovers.

Partake in Planned Maintenance (PM) on floor equipment.

Processing some raw-materials into usable form.

Overseeing and coordinating the pre-weighing operations at the solid pre-weigh area..

Batch production Record(BPR) co-ordination and documentations.

[ MARCH 2008-JULY 2008] [Akin-Abraham Electro-Mechanical Eng. Ltd. ] [ Ojota, Lagos state ]

Role: Industrial Attachment

Responsibilities:

Repair and servicing of reciprocating compressors.

Repair and servicing of generators.

Helped electrical department in dismantling and re-coupling of re-winded giant alternators.

[ FEBUARY 2007-JUNE 2007] [ TECHNODEV Eng. Ltd. ] [ Ikeja, Lagos state ]

Role: Industrial Attachment

Responsibilities:

Servicing and repair activities on Komatsu Bulldozers.

[ MAY 2006-NOVEMBER 2007] [ CRITALL-HOPE Aluminum and steels. ] [ Mushin, Lagos state ]

Role: Industrial Attachment

Responsibilities:

Hand-on training on machine tools including lathe, milling machine, grinding machine e.t.c

COMPUTER PROFICIENCIES

AUTOCAD MICROSOFT OFFICES SUITES MICROSOFT EXCEL 2007 VBA

DATABASE MANAGEMENT SOFTWARE ANALYTICAL SOFTWARES

SKILLS

Computer soft wares proficiency in Microsoft Access, Excel and words.

Programming ability with great use of Visual basics for Applications(VBA) in excel.

Expert Root Cause Analysis leader

Excellent communication skills.

Experience use of analytical procedures and software.

Autonomous and planned maintenance expert.

Excellent research skills with ability to make good judgments from available data.

Versatility with energy management and sustainability.

PROFESSIONAL TRAININGS

Leadership College, P&G training center, 2018

Progressive Maintenance School, P&G training center, 2018

7 habit of highly effect people, Franklin-Covey; P&G training center, 2018

Systemic Problem Solving Approach; P&G training center, 2008.

Autonomous Maintenance (AM) step 1-3 step processes, P&G training center, 2009.

Poka Yoke (preventing human errors), P&G training center, 2009.

Lean manufacturing tools implementation, Science Lord Consulting, 2008.

Microsoft Excel Functions and Tools, Science Lord Computing, 2009.

PROFESSIONAL BODIES

Graduate Member, Nigerian Society of Engineers (NSE) Registration number: G11195

Student Member, American Society of Mechanical Engineers (ASME)

PUBLICATIONS

Developing a national capability for the manufacture of activated carbon from agricultural waste, Pacific Journal of Science and Technology, Akamai University, U.S.A, vol. 10, number 2, November 09, fall edition. Link:

Activated carbon production from wastes: profitability index and product cost reduction method. AMERICAN JOURNAL OF SCIENTIFIC AND INDUSTRIAL RESEARCH, © 2010, Science Huβ,, ISSN: 2153-649X doi:10.5251/ajsir.2010.1.2.332.341

LANGUAGE

English (Fluent)

PAST LEADERSHIP ROLES

Public Relation Officer, Independence Hall Executive Council, University of Ibadan, Nigeria. 2007

Member, Independence Hall House of Assembly, University of Ibadan, Nigeria. 2006

Vice President, Association of Mechanical Engineering Student (AMES), The Polytechnic, Ibadan, Nigeria. 2004



Contact this candidate