Resume of
Md. Harisuzzzaman
B.Sc. In Mechanical Engineer
Contact Number 017******** & 017********
NDT Level-II (VT, MT,PT,UT and RT)
Career Summery &Objective
After passing B. Sc In Mechanical Engineering from kuet, I have worked in several organization and playing several rules since 2007. During my service period, I have worked several organization with playing several activities .Some have mentioned bellow according to job responsibility step by step .But at BBS PLC, all head of activities under my scope Head of
activities
Core responsibility
Administrative
1.Report the overall factory activities to MD Sir
2. Maintain the visitor at project client and also banking issue 3. Handle the representative of ASE, BAEC and Max for the RNPP Project 4. Maintain the meeting minors with client
5. Maintain the communication for the Any type of government issue such as REB, Department of inspection for factories and establishment,
(Shrom and kolkharkhana odidoptor, Fire department, court and police station
6. Monitoring the any types of manpower issue
7. Monitor monthly salary. Also make analysis report in between salary & production production verse consumption of electricity, production verse consumption of oxygen, welding wire & road, grinding Disc, Productivity man power verse production
8. Fire, Safety & security
9. Materials receiving & outgoing record
10. Ensure the supply against the demand of erection department Delivery
&
Logistic
Monitor the delivery & logistic department to control the delivery and unloading cost by allocation the type of vehicle and unlading crane and also job selecting according to vehicle optimize the number of transportations
QA &QC
1. Make ITP according to client requirement and necessity 2. Ensure product quality according to AWS D1.1 and D 1.5 3. Maintain NDT testing, specially UT and VT
4. WPS, WPQR, WQT according to AWS D 1.1
5. Check the materials grade by testing the Yield & tensile strength 6. Ensure Surface roughness before painting and during short blasting 7. Monitoring the WFT during painting to optimize the over/less paint and also maintain DFT
8. Follow up the API 570 for the process piping and API650 for the tank fabrication
9. Familiar about AWS API 1107
10. Gost standard for RNPP Russian standard
Production
1. Make monthly production Schedule, Production plan 2. Monitor the production process line
3. Allocating the production consider to client requirement and machine capacity also follow the type of works
4. Control the production verse consumption
5. Monitor the production process to optimize rectification and also delay time
Maintenance
1. Monitor the preventive & corrective maintenance to optimize the breakdown of machine.
2. Modification of the Magnetic drill machine
3. Monitor the maintenance works of truck, hydra and fork lift 4. Maintenance of Engine, Generator, pump and propulsion. Water cooling system, hydraulic system at shipbuilding sector
5. Hull construction & hull repairing works at shipbuilding sector Project
1. Estimation, costing, budgeting, planning and implementation 2. Fabrication, erection of the fuel tank, fire water tank at power plant sector, Ashugonj and Khulna power plant.
3. Fabrication of the product hopper, aspiration ducting, HVAC duct 4. Fabrication and erection of the water system, hot water, cold water steam line in out system etc
5. Installation of the machineries and piping system at samudha chemical industries ltd,TK group power plant, shipbuilding sector. Fabrication erection and commissioning of the Acid plant at ASMA chemical plant. 6. Project planning & project implementation
7. Drawing and design of the pump house, engine room piping system by Auto cad 2D
8. Collection of the vendor for execute the project works and also handling the project client
9. Construction of the LPG carrier vessel, bullet tank, cargo vessel, passenger ship and also fishing vessel
10.In charge approximate 35 nos 1850 ton capacity cargo vessel,repair and modification of Fishing vessel, Freezing system. During that time fabrication and erection & welding works according to classification society of RINA, GL, BV, IR,AWS D.1. D. 1.5, API570, API650, API1107, B31.1
11. Sand blasting and painting works
My Goal
I am looking better organization where I can apply my previous experience with honestly, integrity and hardworking and also learn more to make myself for the better position on the new organization. Working Experience
During My service period I have worked several organizations with playing several responsibilities according to organization requirement. Some focal responsibility has mentioned bellow
Sl. No Name of the
organization &
type of business of
this Organization
Designation
& Duration
of my job
Responsibility
01
Bangladesh Building
System Ltd (BBS-PC)
Type of business:
Design, supply and
construction of the
prefabricated steel
building
AGM (In
charge plant
& Production
)
Job duration:
19 December -
2020 to
07 July2024
1.Report to each and every thing on factory
relevant issue to MD Sir.
2. Consist the monthly production plan,
consumption & productivity
3.Monitor the QC team to ensure quality as per
AWS standard and structural D1.1
4. Monitor the administrative and financial
activities at factory
4. Arranging WPS and WQT
5. Ensure product quality by VT, MT, PT, UT
and RT method according to ASNT
6. Deal with ASE, BAEC (Bangladesh Atomic
Energy commission) and Max regarding
production, Quality and other issue for the
materials of the turbine building
7. Follow up the preventive and corrective
maintenance on all machineries
8. Development of the production capacity by
ensuring the proper utilization of the machine
and manpower
9.Fire and safety issue
10. Maintain the relation with REB for electric
power, Maintain the relation with
11.Maintain the project client and Bank
02
Name of the
organization:
Sabik Engineering &
logistics
Type of Business:
Engineering
consultant on
shipbuilding sector,
Fishing vessel. Oil
and gas sector, Rent
of the construction
equipment such as
Bulkhead,Dreger,
Position :
AGM
Duration :1st
February-18 to
18/12/2020
1.Design of the propulsion system at cargo and
fishing system
2. Design of the freezing system, fuel storage
system and fish loading system including
implementation at fish mark Fishing vessel
3. Fabrication and erection of the 03 nos 5000
m
3
Fuel tank at 250 MW, duel fuel power
plant at Khulna power plant
4.QA & QC ( Activities;
Forming project schedule, Weld Map,
(Work plan), Prepare WPS and WQT,
ITP(Inspection and testing plan), selecting the
RT point. Follow up VT, UT, DPT and MPT.
Hydro testing.
5. Monitoring the Shot blasting and painting
works according to SA2.5
crane, Excavator,
drum truck,
6. Monitoring the ducting and insulation works
7.Erection of steel structure at solar power
plant, Manikgonj, Dhaka
8. Estimation & costing of various project such as tank fabrication, piping works, steel structure,
equipment erection and installation, jetty,
shipbuilding, LPG project etc
9. planning and project scheduling
10. Coordination between vendor & Classification
society such as RINA,GL, BV
03
Name of the
Organization :
Radiant Ship Yard
Ltd
Type of business :
Ship construction (
Construction of Cargo
ship, passenger ship,
LPG carrier vessel,
Bullet tank, Pontoon
,jetty and gangway
construction, Ship
Repair also docking
& undocking )
Position :
Project
Manager (LPG,
Project
Bashundhara,
BM Energy &,
Petro Max )
Job duration :
9th April 2017
to January-
2018
1.Co-operation between, contractor,
designer & Classification society
2. Estimation & costing of various project
such as steel structure,piping & ship
construction
3. Prepare & Monitoring the project
schedule Follow up the project schedule
4. Draw the production drawing by auto cad
2D
5. Meeting with project owners/ owners’
team
6. Form WPS according to materials grade
and rules of classification society
7. Installation of the bullet tank
8. Follow up the project administrative
activities
9.Follow up the fabrication works of pre-
fabricated steel building project
10. Follow up the slipway construction
works
11. to make rectification plan according to
rules of assign classification society
12. Estimation and costing of civil works
according to company necessity
04
Name of the
organization :T.K.
Ship Yard Ltd.
Type of business :
Ship Construction,
ship repair & Docking
& undocking )
Position:
Manager
(Production)
Duration:
5th April -2013
to 9th April
2017
1. Report the overall shipyard activities to MD
Sir and TD Sir
2. Other responsibilities & activities as like
Radiant shipyard ltd. Thats why not mention
here
Note : Radiant shipyard was the partner of TK.
Shipyard ltd
05
Name of the
organization:
Shun shing ship yard
Ltd. Sister concern of
Seven Circle
(Bangladesh) Ltd.
Type of Business:
Position:
Engineer (Ship
Construction)
Duration:
1
st
November-
2010 to 5th
Firstly, Seven circle (Bd) ltd make their own
ship and docking and undocking works from
out -side shipbuilding company. Only Hull,
propulsion rudder system and hydraulic system
maintaince works at their WTD. After that we
have consisted shipyard including docking and
undocking facility. That’s why my
ship construction,
Ship Repair, Docking
& Un-docking
April 2013 responsibilities have in three phase once development of the shipyard and slip way,Once
ship construction and another ship repair
docking and undocking
Development of the shipyard & Slipway
1.Demarcation of the required area for the
facility of 06 nos ship construction at a time and construction 3500 ton capacity slipway
2. Make layout of shipyard with keeping the
facility of the materials stock yard, materials
fabrication, sand drying area, workshop,
materials shifting and lifting on ongoing
construction ship, side shifting for launching
the new ship
3. to make organogram for the shipbuilding
4. Monitoring the slipway construction works.
5. To make trolley for ship docking and
undocking
6. To ensure back pulling system for undocking
7. Make layout of the internal road of
shipbuilding area and also docking and
undocking area
8.Setup the works to ensure making 22 rft
length shaft for propulsion system
9. Anchoring system for docking and
undocking
10. Report to COO Sir
Ship Construction
1.Eastimation & costing to make 2200 ton
capacity cargo vessel
2. To make & implementation of the project
schedule
3. Make fabrication drawing for the hull and
propulsion system
4. Production drawing for the casting of the
bush materials at propulsion and rudder shafting
5. Requite manpower for the construction and
repair
6. Maintain the communication with ship
surveyor, DG hipping and also design house
Docking & undocking
1.To make docking & undocking schedule
considering to water tide and also hull
condition with following the requirement of
ship for carrying the fly ash and clincer
2. To make docking & undocking plan
considering the ship length, weight and also
design of ship
3. To make side shifting procedure (SOP)
4. To make repair plan by checking the hull and
under water condition of the ship
5. To make launching plan of the new ship
6.Production drawing for the casting of the bush
materials at propulsion and rudder shafting
system
7. Paper works forming and submitted to COO Sir
Maintenance section
1. Monitor the hull and engine room, ruder
system, navigation system windlass
system, propulsion system, etc
06
Name of the
Organization:
Bangladesh
Development and
Design Engineers
(BDDE)
Type of Business :
Drawing Design,
fabrication and
erection of the
industrial sector
.Consultancy of power
sector,industrial
sector,
Pharmaceutical sector.
textile sector etc
Position: Sr.
Engineer
(Project &
Operations)
Duration : 1st
July 07 to
October -2010
1.Construction of the fire & Safety system wall
at Austelia High commission, Gulshan -01
2. Drawing, design,
3.Estimation & Consting
4.Project planning & implementation
5.Make fabrication drawing
5.Supervission of the fabrication works
Name of some complete exclusive project
Sl.
No
Project name Project location Under company
01 Fabrication of the Steel building at RNPP Project
( Roopur Nuclear power plant ) by following Gost
standard
Pabna BBS PLC
02 Installation HCL plant of the ASM chemical industries limited
Konobari,
Gazipur
BDDE
03 Fabrication and erection of piping works at 1MW Generator of Samuda Power ltd”
Meghna ghat,
Gozaria,
Munshigonj
TKSL
04 Erection & Fabrication of the fuel tank “Samuda Chemical complex ltd”
05 Installation of the Floating loader and un-loader system at Holcim (BD) ltd
TKSL
06 Repair and extension of the piping system at “Samuda chemical complex ltd”
07 Fabrication and installation of the Aspiration ducting, heavy ducting, product hopper for plush processing plant at “Sobnom vegetable oil Mills Ltd”
Tarabo,
TKSL
08 Fabrication of the 20 Ton capacity overhead crane at Khulna shipyard ltd
Khulna
09 Installation of the chiller at X ceramics index group, Gazipur
Surer chala,
Masterbari,
Gazipur
BDDE
10 Installation of 1MW generator including piping system BDDE 11
Installation & Fabrication of the steam line, Condensate line, portable water line, overhead tank Installation & Compressed air line with loop system and fire fitting system of the General Pharmaceutical
12 Tank fabrication at Ashugonj power plant Ashugong, Bhoirob
13 Fabrication of the Curved beam for Meghna 2nd Bridge project and Gomuti Bridge
Meghna &
Gomoti ghat
Mazda
Corporation
under BDDE
14 Supervision of the internal road at Shun Shing Shipyard Ltd.
Kaligonj,Gazipur
Seven Circle
(BD) Ltd
15 Construction of the 10 nos cargo vessel. Capacity-1850 Ton
Ghorashal,
Munshigonj,
Fatulla
narayangonj
16 Supervision of the sand blasting and painting works 17 Firefighting line at seven circles (BD) ltd Gorashel 18 Fly ash unloading system
19 Installation of the overhead crane at GPH Shitakundo Chittagong
Sabik
Engineering &
logistics
20 Installation of the grantee crane at Samuda chemical complex ltd, Seven circle (bd) ltd and BIWTA project Ghorashal,
Meghnaghat
Seven Circle (bd)
ltd and TK
Shipyard ltd
Educational qualification
Name of the
Examination
Major subject Board/Institute Passing
year
Result
S.S.C Science Jessore 2000 *1st division (75%)
H.S.C Science Jessore 2002 2nd division (59.3%)
B.Sc Engineer Mechanical Khulna University of
engineering &Technology
2007 CGPA 2.56
Project & thesis
Project & Thesis
Design and Construction of an Air Foot Pump”
Supervisor on this project
Dr. T.P. Bhowmick
Professor
Department of Mechanical Engineering
Khulna University of Engineering and Technology (KUET) Computer skill MS word, MS excel, Auto cad 2d &3 D, Tekla for the structural modeling
Professional certification ASNT Level-II (VT, UT, MT, PT and RT), Fire, Lifting signal, Fire and safety and under process of AWS CWI
On going certification AWS CWI API-1107, D1.1
Language performance Good communication skill over Bengali and English. Personal information
Father Name Late Md. Abdul Hannan Biswas Mother Name Mrs.Sufia Begum Date of Birth 24/09/1985 Nationality Bangladeshi
Marital status Married Religion Islam
Permanent Address Vill &Post: Hatboalia. Thana: Alamdanga, Dist: Chuadanga, Bangladesh
REFERENCE
1. Dr. Mohammad Mashud
Professor
Department of Mechanical Engineering.
Khulna University of Engineering Technology
(KUET)
Phone: 88-041-769471Ext405 (office)
Cell: +880**********
2. Engr. Hasan Morshed Chowdhury
Managing Director
Bangladesh Building system, PLC
(BBS PLC)
Contact Number: 017********
3. Engr. Sayeed Monzur Hossain
Managing Director
Sabik Engineering & logistic
Contact number :018********
4.Engr.Khamruddin Chowdhury
Managing Partner
Sabik Engineering & Logistic
Cell No:017********
With best regards
Md. Harisuzzaman