CAREER OBJECTIVE
Manager Experienced Professional looking for a position in an organisation where I can apply my knowledge & experience for the progress / growth of the Dept. & Organisation.
SKILLS:
•Solid understanding of aggregate Electrical Distribution Panels like HT, PCC, MCC, APFC, Sub-stations, DG, Transformers, and Thyristor controlled Battery Chargers, Earthing. PLC Panels with VFD (For Machineries), Machines, experience with electrical drawings for control systems, PLC based Machinery’s Utilities like Boilers, HVAC, Chillers, & Compressors. Fire fighting panels for hydrants & Sprinlers.
•Can write logic for Factory Automation.
• Sound knowledge of Mechanical.
•Excellent verbal, written and interpersonal communication skills and capable of developing and maintaining good relationships with company and regulatory agency personnel.
•Strong leadership skills; possess the ability to lead, manage and motivate; have a proven track record for creating employee ownership of safety, production and quality
•Excellent time management skills; ability to prioritize and manage multiple tasks; strong planning skills with 6S, Kaizen.
Planning and Budgeting:
. To ensure Engineering department service with the requirements of the unit for optimum output.
. To ensure Engineering cost within budgeted level.
To monitor, control and reduce the maintenance cost.
EDUCATIONAL QUALIFICATION:
Exam
Year of Passing
Board/University
Institute
Class
Diploma in Electronics & Telecom Engg.
May, 1991
Bombay Board
Bharati Vidyapeeth
1st Class
H.S.C. Science
March, 1987
Bombay Board
St. John The Baptist High School & Jr. College
52%
S.S.C.
March, 1985
Bombay Board
St.John The Baptist High School & Jr.College
58%
Professional Certificates & Practicing License in Electrical & Electronics from Engineering Institute of Zambia.
CAREER ACHIEVMENT’S:
Plant Operation Manager: Smooth running of plant - hot rolling mill (DANA STEEL - Nigeria) training the Control dept. / Operations / Maintenance Staff – 45
Kaizen - Received Appraisal letter, on furnace blower motor breakdown from Lloyds Metals. (Cold rolling Plant) Reduced BD, Energy Wastage, Manpower loss thus increasing Productivity (Mechanical Suggestion)
Installed & Commissioned specialised Mechatronics based Oil Packing Machines (pouches) & maintaining the same.
BIDCO - Kenya. Lots of Improvements done to increase production, Resolved mechanical issues for boilers and the Soap Plant
Commissioned multiple 11KV Substations, for Adani Willmar’s Coal Handling Project through Siemens in Mundra, Gujarat. – 4 contractors
Independently Handled carbonated soft drink plant with warehouse. (TANGY DRINKS - Zambia) (Increased Productivity by Process Change & Change Management - Lean Manufacturing, Six Sigma Application) – 150 workers
Giant Beverages (Frozen Syrup at 5 deg c to 7 deg c) looking after PPC, Manpower planning, preventive & predictive maintenance of the lines. Synchronised all conveyors with filling machines.
Attended training session on Team Building.
PROFIT GAINS
•Increased Profit $1200 per Shift by (Increased Productivity by Process Change & Change Management)
•Lowered cost per $400 per shift while evaluating Team members & creating a new Team with backup.
•Validated Billet pusher for acceptability of coupling with encoder providing a cost reduction of $ 500 per Breakdown.
Presently Working with an Engineering Company – In Assembly section of Canopy fabrication & Manufacturing.
In fabrication of Hydraulic systems assembly of 200 bar & 5 to 15 LPM. (Electrical follows)
I have worked with Tata Serien, Piramal Group, Raheja, Runwal Garden, Raymaonds Reality, on Fire panels (Sprinklers & Hydrant), Designing for cable tray route laying the same with HT / LT cables.
SR NO.
COMPANY NAME
FROM
TO
RESPONSIBLITIES
1
Engineering Companies like Shivsagar, Icon,
WTC As a Free lancer.
Jan-2016
TODAY
Tested in Factory & Commissioned Furnace on site (Sept – Nov 2019)
Resolved process issues cleaning brass caps
Tested in Factory & Commissioned Furnace on site – 2 nos. (2016-2017)
Giving continuous trial for 15 days
Material Handling Equipment’s --Tested in Factory & Commissioned Mono Rail Hoist – 4 nos. & Bridge Cranes -2nos (2017) (ONGC)
Offering Load Test to client on site (Mechanical)
Worked with a Panel manufacturing (Allen Bradley PLC) company as a freelancer in Production dept. in coordination Design Dept, auto cad operators, Shop floor team, Purchase, QC & Store Dept.
Panel Fabrications, Component layouts inside the panel’s
2
Giant Beverages Nigeria
(Reporting to MD)
SR. TECHNICAL ENGINEER
OCT 14
Sept 15
• Commissioned water line (Valmont) Which was Sand still
• Resolved major issues on Air conveyors, KHS Blowing Machine- Blowmax, LP compressor, in water line.
• Synchronised all conveyors in Vitamin Water line
3
TANGY DRINKS (ZAMBIA)
ELECTRICAL & ELECTRONICS ENGINEER.
Handled Plant Independently
Reporting to
MD
Mar-11
May-11
Inspection of new BEVERAGES machines in Mumbai & Baroda (INDIA)
4
May-11
May-13
Joined as an Electrical & Electronics Engineer, as need arises was been trained for Production & Quality of the product.
• Maintaining quality of products, ensuring regular Production & Maintenance activity.
• Independently & effectively managed labours, Machines, Raw materials, Purchase & Vendor.
• Demonstrated professional effectiveness through efficient time management, effective organisation of work and interpersonal interactions thus increasing efficiency of the Plant. Continuous Manufacturing Process line
• Trouble shooting and attending critical breakdowns• Coordinating with sales, Store & Purchase Dept.
• Provided recommendations and measures for improvement by utilizing 3 C’s (cause, concern and countermeasure).
• Also implemented conditioned base maintenance concept & concept of Root Cause Analysis that enabled Maintenance Dept. to reduce down time.
• Training the staff.
HANDLED PLANT INDEPENDENTLY.
Increased efficiency of the Plant.
5
AJAY ENGINEERING (SIEMENS UNIT)
ELECTRICAL ENGINEER
Aug-10
Feb-11
.
In EPC Dept. Coal Handling Project. In Erection OF 11 KV Multiple SUBSTATIONS. Coordination with Civil Dept. Stores & Purchase.
COAL HANDLING PROJECT
6
(KENYA)
Reporting to Engineering Team Leader
Feb-09
Feb-10
• Heading Control Dept.
• Pioneered and implemented conditioned base maintenance concept & concept of Root Cause Analysis that enabled service crew to reduce breakdowns remarkably.
• Installed & commissioned specialised Mechatronics oil packing machines (pouches) Continuous Manufacturing Process line.
• Continuous Improvements in Packaging Dept. to avoid double work.
• Vendor development.
• Attended training session on TEAM BUILDING
7
DANA STEEL
( Nigeria )
Hot Rolling Mill
Plant Operations Manager
Reporting to
GM -Operations
Dec-07
Dec-08
• Effectively managed Electrical & Control Dept.
• Completed time sensitive project in Finishing Line
• Supervised maintenance crews and scheduled overhaul of all equipment’s in the Plant.
• Identified own professional strengths and areas for growth as well as demonstrating professional development through formal and informal learning experiences
• Effectively managed day-to-day operations like inward & outward of the materials for the Mill. Supervising & Training over 40 employees.
Key Achievements: Commissioned & Maintained, Siemens PLC S7 300 in finishing line.
Continuous Manufacturing Process line
Due to too much BD of Billet Pusher, modified Billet Pusher for its smooth operation.
8
DUBAI PORT WORLD
Sr. Officer - Electrical
Feb-06
Nov-07
In Engineering dept. In maintenance of Rubber Tyre Gantry, Rail Mounted Gantry, & Quay-Cranes. Attending Break down for the same. The cranes were STEP -5 Siemens PLC based with remote I/O'S Connected with Profibus. PERFORMING SAFETY CHECKS
9
(Manufacturer of Packaging Machines of Milk, oil, Powder)
HFFS & VFFS
Coordinating with
GM – works, Production Manager
&
Design Manager
Apr-99
Feb-06
In Design Dept. In designing of Control panels (PLC Based with VFD'S), testing the same with machines, attending breakdowns, attending customers. DONE Lot of improvements on panels & machines by applying Six Sigma & Lean Manufacturing. Engineering and modify bills of material according to data sheet / order. Designing of Control Panels (writing logics for PLC based) & testing the same with machines. Preparation of P&ID, Instrument Index & I/O list, Motors and Sensors selection and integrations.
Liaise with the drawing office
Supply data to draft man and ensure drawings are in accordance with the data sheet specifications, expedite drawings from draftsmen.
Handle internal queries from sales, purchasing and production departments
Ensure the efficient and effective engineering of all non - standard bills of materials and their associated functions
Complete customer project documentation
Handling all queries from customers / suppliers
Planning
Read, check and generate drawings / documents
Attend to enquiries; update it.
Comply with and enforce all company policies and procedures
Assist fellow employees with daily functions as and when required
Carry out all other reasonable tasks that was delegated from time to time .
LLODYS METALS & ENGINEERS LTD.( COLD ROLLING PLANT )
Oct-96
Feb-99
In Electrical Maintenance Dept. Carrying out preventive & predictive Maintenance of DC Drives & its Panels, Utilities, Lighting System, Substation, Cranes, Annealing Furnace & attending Breakdown for the same. Received appraisal letter on air blower motor Mechanical breakdown
Continuous Manufacturing Process line
NETWORK Ltd.
Feb-95
Sep-96
In Servicing & attending breakdowns for Electronic Typewriters & Fax Machines.
Handling approximately 350 customers.
AFCOSET
Jan-92
Dec-92
APPRENTICE ENGINEER
AFCOSET
Jan-93
16-01-1995
ENGINEER
In Testing & Quality Control Dept. In testing of Thyristor Controlled Rectifiers (Battery charger, up to 800 Amps) POWER ELECTRONICS
Highlights:
33kv Substation – Nigeria,
11kv Multiple Substations – Coal Handling Project – Adani, Mundra, Gujrat
22kv Substation – Dubai port world, Nhava-Sheva, Navi Mumbai
11 KV Tata Reality (Serien)
Handled Plant Independently by maintaining quality of products & ensuring regular maintenance.
Independently manage production/ machines (Labour, output, quality, material)
Responsible for Vendor Management.
Knowledge in reparation of machines, troubleshooting and attending breakdown.
I have worked in top Management. I have worked in Engineering Dept. of different industries & handled Plant & other projects independently.
Can join immediately if selected immediately.
If I am given an opportunity to serve your Organisation, I will do my best for smooth running, Continuous improvement & progress of the Plant / Project
Regards,