Post Job Free
Sign in

Production Technician Ii

Location:
Cleveland, MS
Posted:
October 08, 2024

Contact this candidate

Resume:

Avis Gary

713-***-****

***********@*****.***

*** * ***** *** *********, MS 38732

Experience

Production Technician II Baxter Healthcare

May 2023-September 2024

Communicated effectively with department employees, management, and maintenance.

Operated assembly equipment

Set-up machine parameters per operating procedures.

Performed line clearance, quality checks, and required mechanical adjustments to machine.

Ensured raw materials, printing and packaging materials were ready for production.

Used blueprints, specifications, Bill of Materials, and Standard Operating Procedures to ensure product or process acceptability.

Reported abnormalities and corrective action to supervision.

Complied with Good Documentation Practices.

Participated in and complete all required training. Participate in the training of new personnel.

Maintain good housekeeping in the working area and lead 6S responsibilities as assigned.

Performed all other duties and responsibilities as determined by supervision/management.

Assured line is set up with proper materials per the Bill of Material (BOM), verify batch documents are correct per filling schedule and documents are maintained inside appropriate batch folder.

Determined staffing requirements to meet the production schedule and adjust staffing accordingly throughout the shift to meet plant goals.

Initiated batch and exception documents as required needed.

Performed production related task per appropriate procedure and verify all entries were documented correctly during your shift. Execute Batch/Code changes as well as sublots when assigned.

Performed required quality checks per appropriate Packing SOP and document results in Assemble Pack or appropriate batch documents.

Worked with the Production Technician 2 and/or maintenance, monitor all line equipment operations to optimize line performance.

Perform the job duties of other line personnel while relieving for breaks, if applicable. (Supporting batch change process on other lines…etc.)

Communicated with the Filling Line when situations arise that may affect quality, process scrap and/or daily production.

Maintained the Packing area in an audit ready state by using 6S principles daily.

Notified supervision and take appropriate action when a safety, quality, mechanical or personnel issue is identified immediately upon detection.

Documented daily production and equipment issues in shift notes if applicable.

Ensured all personnel performed tasks on your line are properly trained, certified, and/or qualified.

Trained new PTI’s on responsible processes.

Shipping and Receiving Clerk SPM Oil and Gas

July 2021-July 2022

Performed material handling and warehousing functions required in the receiving, processing, sorting, moving, packing, and shipping of parts, materials equipment, and supplies.

Loaded and unloaded incoming stock from trucks

Pull and palletized orders

Operated forklift

Performed other duties as necessary in support of team objectives

Shop Technician Magna Imperior Systems

April 2020-July 2021

Performed semi-skilled production work to assemble cells, including cutting membranes, mesh, spacers and soldering.

Ensure product and process quality and efficiency through appropriate inspection and continuous improvement problem solving activities.

Performed all work in compliance with Magna Imperior Systems

Performed other duties as necessary in support of team objectives.

Hose Assembler Magna Gates Engineering and Services

January 2020-April 2020

Assembled hoses.

Operated hose assembly equipment such as manual saws, automatic saws and hydraulic crimping machines.

Used measuring tools such as tape measures and calipers

Valve Technician Franklin Valves

January 2019-April 2019

Assembled D-711 Valves that contains bonnet, lower plate, slips, plug and an operator.

Knowledge with dashboard reading.

Welding Mechanic Alfa Laval

June 2017 -August 2018

Trouble shoot and repair compablocs, to the heart

Inspect, disassemble, repair, assemble and pressure test units

Follow the quality plan per job to repair products

Removed baffle cages, columns, top head and bottom head

Dye pinned heart of compabloc and nozzles

Tested compablocs : CP-20; CP-30-; CP-40; CP-75 ; CP-400 and CP- 500 up to 600 PSI

Separation Experience: Lynx 40; Lynx 400; and Lynx 500

Forklift Operator Pro Staff (Daikins)

October 2016-February 2017

Used material handling equipment such as cherry picker, stand up lift, sit down lifts and tugger lights to move components and material throughout work area

Assembler TPI Staffing

April 2016-September 2016

Made limit gears and torque switches

Built hand wheel shafts and retainer gears for housing of units

Data entry

Tear Down Technician TPI Staffing

December 2015-March 2016

Disassembled valves, sand blasted and sent for inspection

Assessed parts for defects

Assembler LK Jordan (C&J Energy)

February 2015-April 2015

Used material handling equipment to move components and material throughout the work area

Assembled pipeline for oil/gas

Actuator Assembler Lead Cameron

April 2013-August 2014

Cleaned corrosive deposits from parts using solvents

paint valve fitting and other devices.

Tested valves, actuators and level gauges for leaks.

Used Optimus operating system to process orders.

Used material handling equipment to move components and material throughout work area

Experience with CC20 chokes including blue print reading, triple SSS, keavernerss, CC 70 chokes,stainless steel valves, enkeniels valves, MA’s

Assisted with orientation and teaching other workers proper techniques and procedures.

Ensured that all components have been accepted and correspond to the assembly work order and blueprint while keeping parts organized

Tubing experience with gate valve and actuators

Inventory

Quality Control inspection

Burnett Staffing Cameron

March 2011- April 2013

Cleaned corrosive deposits from parts using solvents, compound 320, 220 and 180

paint valve fitting and other devices; test valves, actuators and level gauges for leaks.

Used Optimus operating system to process orders

Used material handling equipment to move components and material throughout work area; Used material handling equipment to move components and material throughout work area

Experience with CC20 chokes, triple SSS, keaveners, CC 70 chokes, stainless steel valves, enkeniels valves

Ensure that all components have been accepted and correspond to the assembly work order and blueprint while keeping parts organized

Valve Technician Valvtechnologies Incorporated

November 2005 -August 2010

Lapped and painted valve fittings.

Cleaned corrosive deposits from parts using solvents.

Utilized forklift to transport material and parts throughout warehouse.

Mixed compound 320, 220 and 180

Read mills off of endcap and balls

Education

A

Diploma, Ruleville Central High School

Skills

Leadership Data analysis Communication

Organization Problem-solving Inventory

Assembly Documentation Good Manufacturing Practices

Prioritizing Basic Computer Skills



Contact this candidate