Yussuf hassan
# 207-*****-** street Edmonton AB
Ph. 587-***-**** Email;********@*****.***
SUMMARY OF SKILLS:
Over 10 years experience of constructions,
scaffolding,piping labor
Dependable, hardworking, with proven
records of success working on construction
commercial and industrial
Knowledgeable in general Site preparations
concrete foundation, Hand, power tools
CVS and education HIGH SCHOOL
WHMIS,CST,H2S, First Aid,OSSA orientation ossa confined space.
,Fire watch Certificates and fall protection, Ground disturbance
level 2 trained and ticked of SANDBLASTING,COATING
Physically fit to lift heavy objects unassisted and perform repetitive
tasks Excellent hand-eye coordination and well organized and reliable
communicate well in English,
Flexible, willing, able and ready to work various shifts and relocate if needed
three years of working experience as pipeline laborer in areas of: Jeeping, Coating,
Bending, Tie-ins, lower-ins, skit-mat, and so on
OBJECTIVE TO secure apprentice scaffold and construction labor,pipeline laborer
oj pipeline 2022 to 2024
pipeline labouror environmental crew access and pre cleanup and final cleanup crew
Banister pipeline feb 2022 jan 2022
pipeline laborer ditch crew lowering in crew
industrial scaffolding 2021 sep dec 2021
third year scaffolding peace river bridge
safeway aluma scaffolding as third year scaffolding
brock group and soogadin scaffolding
FLOUR Energy jan 2020 to june 2020
Performing as pipeline labour
TIE Ins Backfilling Dig ups drain tile
Installed concrete support for above ground pipes,painted
Being involve in all aspect of the construction of the pipe
Making tie, jeeping and coating
PEACERIVER HYDRO PARTNERS EARTH WORKS CONSTRUCTION
Performing such as digging using jackhammer backfilling
Assisting other crews in completing the jobs safely
Spotting heavy equipments and tools inspection slings
ALUMA SYSTEM SCAFFOLDING AUG 2019 TO MARCH 2020
performed my duties as apprentice scaff
older erecting,dismantling measuring leveling
working at hights with proper gear and tools
PILLAR RESOURCES Construction Laborer feb 2019 to June 2019
make concrete beams, columns, and panel
Rub cement in with sponge- rubber floater burlap
Fill roadways, Driveways, sidewalks, bridges,homes and parking lots
Use chemical additives to speed up drying process if necessary
Smooth out concrete in segments to ensure the concrete poured is level
Prepare surface with hammer and chose
clean up, materials transport general support of all trades assisted in framing painting
maintaining housekeeping and safe work practice
spotting heavy equiotments, using sign and good communication
LEDCOR GROUP construction and scaffolding Sep 2018 to jan 2019
As construction and pipeline labor I performed my duties and helping
Co-workers to built and installed pipes ties valve exchange and bolt up
Experience in some tools such as power tools chain saws and power saws
Skills and ability to communicate with public and co-workers around me
General basic clean up and maintenance
WORLEY PARSONS EnCana SATURN,NCLH Projects Dawson Creek july 2017 -Sep 2018
Scaffold Builder as Second year scaffolder, Hard working Team player
Erected and Dismantle scaffold. Repair and maintenance for contactors needs
work effectively in teams,make sure job sites clean and working safely
Able to recognize Hazards and find ways to mitigate those Hazards
Clear stream Energy construction pipeline labourer DEC 2016 -April 2017
Assisting coworkers inspect the pipeline to see if is measured and cut right, maintaining all
pipeline storage pumping system are kept at the right locvation
Ensuring that all water ways and wet lands are returned to the standards
Measured, cut and installed pipes according to plan and managed dirt gathering and
transported to appropriate location.
Communicated well with co-workers and meet all safety requirements applicable
Part of the team that inspected large part of pipeline and painted as well.
BROCK CANADA Cenovus christina lake feb 2016 TO july 2016
Building and dismantling scaffolding and helping the crew to practice safe work
Attended daily safety meeting filling FLHA
Secure my tools and scaffold items in safe place
BRUTE FORCE Cribbing construction laborer March 2015 to July 2015
Assisted the crew members to set up and planed the task
filling safety task card and assisted in identifying the hazards around the work area
maintained housekeeping after end of the job
CJ OILFIED CONSTRUCTION JUN 2014 -Feb 2015
Performed grinding measuring, bolt up, fabrication, assembling and rigging
Assisted in cutting and soldering pipes in appropriated places
Managed in pipe alternation and fabrication activities tested and installed pipes according specification
Performed hydro test and maintained tools used in fitting pipe systems
Assisted in repairing leaks and making adjustment to the pipe
Good housekeeping and maintain clean my area of the work
grinding,paving and cutting the steel according to the standard
SAIPEM CONSTRUCTION CANADA Husky Sun Rise oct 2013 April 2014 Assisted in
cutting and soldering pipe manage pipe alternation and fabrication
Assisted in repairing leaks and making adjustment to the pipe system
maintain tools and equipment used in fitting pipe systems
Target Safety Company Jun 2013 - Oct 2013 husky upgrade/Cenovus/Imperial oil cold Maintain a safe
working condition for the workers, Explain health and safety, attending CSE safety watch
documenting the workers entering cse working closely with ERT team for any emergency
Procedures to all construction workers, Documented of hazards assessment and report to
supervisor