SUMMARY OF SKILLS:

Over 10 years experience of constructions,

scaffolding,piping labor

Dependable, hardworking, with proven

records of success working on construction

commercial and industrial

Knowledgeable in general Site preparations

concrete foundation, Hand, power tools

CVS and education HIGH SCHOOL

WHMIS,CST,H2S, First Aid,OSSA orientation ossa confined space.

,Fire watch Certificates and fall protection, Ground disturbance

level 2 trained and ticked of SANDBLASTING,COATING

Physically fit to lift heavy objects unassisted and perform repetitive

tasks Excellent hand-eye coordination and well organized and reliable

communicate well in English,

Flexible, willing, able and ready to work various shifts and relocate if needed

three years of working experience as pipeline laborer in areas of: Jeeping, Coating,

Bending, Tie-ins, lower-ins, skit-mat, and so on

OBJECTIVE TO secure apprentice scaffold and construction labor,pipeline laborer

oj pipeline 2022 to 2024

pipeline labouror environmental crew access and pre cleanup and final cleanup crew

Banister pipeline feb 2022 jan 2022

pipeline laborer ditch crew lowering in crew

industrial scaffolding 2021 sep dec 2021

third year scaffolding peace river bridge

safeway aluma scaffolding as third year scaffolding

brock group and soogadin scaffolding

FLOUR Energy jan 2020 to june 2020

Performing as pipeline labour

TIE Ins Backfilling Dig ups drain tile

Installed concrete support for above ground pipes,painted

Being involve in all aspect of the construction of the pipe

Making tie, jeeping and coating

PEACERIVER HYDRO PARTNERS EARTH WORKS CONSTRUCTION

Performing such as digging using jackhammer backfilling

Assisting other crews in completing the jobs safely

Spotting heavy equipments and tools inspection slings

ALUMA SYSTEM SCAFFOLDING AUG 2019 TO MARCH 2020

performed my duties as apprentice scaff

older erecting,dismantling measuring leveling

working at hights with proper gear and tools

PILLAR RESOURCES Construction Laborer feb 2019 to June 2019

make concrete beams, columns, and panel

Rub cement in with sponge- rubber floater burlap

Fill roadways, Driveways, sidewalks, bridges,homes and parking lots

Use chemical additives to speed up drying process if necessary

Smooth out concrete in segments to ensure the concrete poured is level

Prepare surface with hammer and chose

clean up, materials transport general support of all trades assisted in framing painting

maintaining housekeeping and safe work practice

spotting heavy equiotments, using sign and good communication

LEDCOR GROUP construction and scaffolding Sep 2018 to jan 2019

As construction and pipeline labor I performed my duties and helping

Co-workers to built and installed pipes ties valve exchange and bolt up

Experience in some tools such as power tools chain saws and power saws

Skills and ability to communicate with public and co-workers around me

General basic clean up and maintenance

WORLEY PARSONS EnCana SATURN,NCLH Projects Dawson Creek july 2017 -Sep 2018

Scaffold Builder as Second year scaffolder, Hard working Team player

Erected and Dismantle scaffold. Repair and maintenance for contactors needs

work effectively in teams,make sure job sites clean and working safely

Able to recognize Hazards and find ways to mitigate those Hazards

Clear stream Energy construction pipeline labourer DEC 2016 -April 2017

Assisting coworkers inspect the pipeline to see if is measured and cut right, maintaining all

pipeline storage pumping system are kept at the right locvation

Ensuring that all water ways and wet lands are returned to the standards

Measured, cut and installed pipes according to plan and managed dirt gathering and

transported to appropriate location.

Communicated well with co-workers and meet all safety requirements applicable

Part of the team that inspected large part of pipeline and painted as well.

BROCK CANADA Cenovus christina lake feb 2016 TO july 2016

Building and dismantling scaffolding and helping the crew to practice safe work

Attended daily safety meeting filling FLHA

Secure my tools and scaffold items in safe place

BRUTE FORCE Cribbing construction laborer March 2015 to July 2015

Assisted the crew members to set up and planed the task

filling safety task card and assisted in identifying the hazards around the work area

maintained housekeeping after end of the job

CJ OILFIED CONSTRUCTION JUN 2014 -Feb 2015

Performed grinding measuring, bolt up, fabrication, assembling and rigging

Assisted in cutting and soldering pipes in appropriated places

Managed in pipe alternation and fabrication activities tested and installed pipes according specification

Performed hydro test and maintained tools used in fitting pipe systems

Assisted in repairing leaks and making adjustment to the pipe

Good housekeeping and maintain clean my area of the work

grinding,paving and cutting the steel according to the standard

SAIPEM CONSTRUCTION CANADA Husky Sun Rise oct 2013 April 2014 Assisted in

cutting and soldering pipe manage pipe alternation and fabrication

Assisted in repairing leaks and making adjustment to the pipe system

maintain tools and equipment used in fitting pipe systems

Target Safety Company Jun 2013 - Oct 2013 husky upgrade/Cenovus/Imperial oil cold Maintain a safe

working condition for the workers, Explain health and safety, attending CSE safety watch

documenting the workers entering cse working closely with ERT team for any emergency

Procedures to all construction workers, Documented of hazards assessment and report to

supervisor