Post Job Free
Sign in

Recruitment Team Project Site

Location:
Quezon City, Philippines
Posted:
October 01, 2024

Contact this candidate

Resume:

DANTE SABANGAN DELOS REYES

BLOCK ** LOT **, ILANG-ILANG ST., MALIGAYA PARK SUBDIVISION,

NOVALICHES, QUEZON CITY 1118. METRO MANILA.PHILIPPINES TELEPHONE NUMBERS: +639*********/+639*********

PERSONAL INFORMATION:

AGE : 60 years old

BIRTH DATE : SEPTEMBER 26, 1963

BIRTHPLACE : POBLACION, ARITAO, NUEVA VIZCAYA

CIVIL STATUS : MARRIED

HEIGHT : 1.688 METERS

WEIGHT : 65 KILOGRAMS

EYES : BLACK

HAIR : BLACK

SEX : MALE

RELIGION : ROMAN CATHOLIC

NUMBER OF CHILDREN : FOUR (4)

LANGUAGE SPOKEN : ENGLISH, TAGALOG AND ILOCANO (LOCAL DIALECT)

PASSPORT NUMBER : P178909B

PLACE ISSUED : DFA NCR NORTH

DATE ISSUED : May 25, 2019

DATE OF VALIDITY : May 24, 2029

YASREF I.D. : C-720016

DATE OF VALIDITY : JANUARY 26, 2014 (SURRENDERED)

SAUDI GOV’T. I.D. : 225-***-****

CITIZENSHIP : FILIPINO

SPOUSE : NORLINDA MAGO DELOS REYES

ADDRESS : BLK. 31 LOT 23 ILANG-ILANG ST., PECHAYAN KANAN, MALIGAYA

PARK SUBD., NOVALICHES, QUEZON CITY, METRO MANILA

OCCUPATION : MERCHANDISER

FATHER : ANTERO VILLAFUERTE DELOS REYES

MOTHER : HEDELIZA SABANGAN DELOS REYES

Government Certificate : Civil Service (80.20%)

CURRENT LOCATION : QUEZON CITY, PHILIPPINES

STRENGTHS: MOTIVATED AND DISCIPLINED, CAN EASILY ADOPT JOB SYSTEMS, RESOURCEFUL, CREATIVE, ORGANIZED, POSITIVE AND HARDWORKING, WIDE KNOWLEDGE OF VARIOUS WORKS.

EDUCATIONAL BACKGROUND:

ELEMENTARY

SCHOOL NAME : ARITAO CENTRAL SCHOOL

SCHOOL ADDRESS : POBLACION, ARITAO, NUEVA VIZCAYA

SCHOOL YEAR : 1970 – 1976

STATUS : GRADUATE

SECONDARY t.c

SCHOOL NAME : SAINT TERESITA’S ACADEMY

SCHOOL ADDRESS : POBLACION, ARITAO, NUEVA VIZCAYA

SCHOOL YEAR : 1976 – 1980

STATUS : GRADUATE

COLLEGE:

COLLEGE/UNIVERSITY : GREGORIO ARANETA UNIVERSITY FOUNDATION DE LA SALLE

ADDRESS : VICTONETA PARK AVENUE, MALABON CITY, METRO MANILA

COURSE : BACHELOR OF SCIENCE IN MECHANICAL ENGINEERING

SCHOOL YEAR : 1981 - 1984

STATUS : UNDERGRADUATE

PREVIOUS JOBS:

COMPANY : PRIME BMD

ADDRESS : SOLAIRE, VERTIS NORTH, BAGONG PAG- ASA, QUEZON CITY

METRO MANILA. PHILIPPINES

POSITION : GENERAL FOREMAN – FORMWORKS

INDUSTRY : CONSTRUCTION

DURATION : FEBRUARY 19, 2020 TO JANUARY 13, 2021

PROJECT : RESIDENTIAL, MIDRISE AND HIGHRISE BUILDINGS, COMMERCIAL,

AND INDUSTRIAL BUILDINGS AND INFRASTRUCTURE.

DUTIES AND RESPONSIBILITIES:

1.AT YARD

-SUPERVISION OF UNLOADING OF FORMWORKS MATERIALS,PROPER PILING AND STORAGE OF MATERIALS, PREPARATION OF MATERIALS TO BE FABRICATED.

-CONDUCT SAFETY TOOL BOX MEETING, ORIENTATION ON PROPER MATERIALS AND TOOLS TO BE USED IN FABRICATING FORMWORKS REQUIREMENTS TO THE SITE.

-SCHEDULE MANPOWER FOR EVERY FORWORKS SYSTEM TO BE USED AS PER GIVEN REQUIRED ITEMS TO BE DELIVERED IN ACTIVE AREAS AT PROJECT SITE

-QUALITY INSPECTION OF FABRICATED MATERIALS AND SUPERVISION OF LOADING MATERIALS FOR SITE DELIVERY.

2.AT PROJECT SITE

-LOCATING AREAS AND INSPECTION OF PIRORITIES FOR INSTALLATION.

-SUPERVISE ERECTION, INSTALLATION OF FORMWORKS.

-DETERMINE THE STRENGTH AND QUALITY OF FORMWORKS SYTEM (HORIZONTAL AND VERTICAL) INSTALLED AND ERECTED AS PER CALCULATED DESIGNS AND DRAWINGS.

-FINAL CHECKING WITH THE QUALITY DEPARTMENT AND REPRESENTATIVE FROM THE FORMWORKS COMPANY FOR ITS FINALITY FOR CONCRETE POURING.

-PROPER STRIPPING, RE-SHORING FOR HORIZONTAL STRUCTURES, PROPER CLEANING, PILING AND STORAGE OF MATERIALS IS ALWAYS CONDUCTED.

-PROPER REPORTING OF ALL ACCOMPLISHED ACTIVITIES FROM YARD TO PROJECT SITE TO DETERMINE ANY AREAS TO BE PRIORITIZED AND PUNCH LISTS.

COMPANY : PERI ASIA PHILIPPINES, INC.

ADDRESS : 9/F NOLTower, Commerce Avenue corner Acacia Avenue,

Madrigal Business Park, Ayala Alabang,

1770 Muntinlupa City

POSITION : FORMWORKS/ SITE INSTRUCTOR

INDUSTRY : FORMWORK SCAFFOLDING ENGINEERING

DURATION : FEBRUARY 01, 2016 to June 15, 2019

PROJECT : INDUSTRIAL, COMMERCIAL,MIDRISE AND HIGH RISE

BUILDINGS AND INFRASTRUCTURES.

DUTIES AND RESPONSIBILITIES

-GIVE PROPER ORIENTATION, INTRODUCTION AND TRAINING FOR THE PRODUCTS OF PERI ASIA PHILIPPINES FOR FORMWORKS AND SCAFFOLDING SYSTEM INTRODUCED TO THE GENERAL CONTRACTOR’S SITE PERSONNEL INVOLVED IN FORMWORKS AND CONRETING ACTIVITIES AT THE PROJECT SITE.

-TIME TO TIME INSPECTION AT PROJECT SITE TO MAKE SURE THAT DESIGNS AND DRAWINGS WERE STICTLY FOLLOWED FOR ITS IMPLEMENTATION.

-CONDUCT FINAL CHECKING WITH THE QUALITY DEPARTMENT OF GENERAL CONTRACTOR AND ITS CONSULTANTS BEFORE FINAL APPROVAL FOR CONCRETE POURING.

COMPANY : EEI COPRORATION

ADDRESS : Bagumbayan, Quezon City

INDUSTRY : CONSTRUCTION AND ENGINEERING

POSITON : STRUSTURAL SUPERVISOR

DURATION : September 07, 2015 to November 07, 2015

PROJECT : METRO MANILA SKYWAY STAGE3

DUTIES AND RESPONSIBILITIES

Report directly to Construction Superintendent on his work area.

1.Conduct meeting on safety, quality and productivity targets on the assigned work area.

2.Read and familiarized on the scope of works, specifications, quality and productivity.

3.Prepare 3-weeks look ahead of schedule with forecast quantities and resources loading based on milestone targets.

4.Prepare materials requisition/withdrawal and distributes to his foreman (men).

5.Responsible for timely delivery of manpower, tools and equipment, materials requirement in his assigned work area.

6.Conduct in process and final quality inspection of his project area activities.

7.Review of daily accomplishment specification.

8.Conduct regular tool box meeting.

9.Uphold the Company’s Code of Business Conduct and Ethics, Fraud, Policy, Conflict of Interest and ensure his team’s compliance thereto.

COMPANY : BONATTI SPA BRANCH COMPANY-KSA

ADDRESS : 2nd Floor, Bseel Center, Feras Bin Nadher Street, Al Olaya Area, P.O. Box 1988 Al-Khobar 31952-Kingdom of Saudi Arabia

INDUSTRY : OIL and GAS and ENERGY POWER

POSITION : MECHANICAL SUPERVISOR ( STRUCTURAL STEEL)

DURATION : July 27, 2008 to July 27, 2013

STATUS : CONTRACT-FINISHED

DUTIES AND RESPONSIBILITIES (Steel Structural) – MODULE : PRE – ASSEMBLY AND ASSEMBLY

AT SITE: (SUPERVISE STEEL STRUCTURAL ERECTION AND ASSEMBLY)

10.Report directly to Construction Superintendent on his work area.

11.Responsible for meeting on safety, quality and productivity targets on the assigned work area.

12.Read and familiarized on the scope of works, specifications, quality and productivity.

13.Prepare 3-weeks look ahead of schedule with forecast quantities and resources loading based on milestone targets.

14.Prepare materials requisition/withdrawal and distributes to his foreman (men).

15.Responsible for timely delivery of manpower, tools and equipment, materials requirement in his assigned work area.

16.Conduct in process and final quality inspection of his project area activities.

17.Review of daily accomplishment specification.

18.Conduct regular tool box meeting.

19.Uphold the Company’s Code of Business Conduct and Ethics, Fraud, Policy, Conflict of Interest and ensure his team’s compliance thereto.

AT LAYDOWN AREA and OFFICE:

1. Coordinate with the Technical Department and Planning Department to check any priotized plans and drawings.

2.Check reports of erected materials to determine the following:

a.The materials being erected according to its piece mark

b.The verticality and horizontal elevation of any structure erected and installed.

3.Coordinate with the material man and material expediters to ensure that the materials to be sent are fitted for the structural erection at the project site.

4.Making daily time sheets for my code and their job codes.

5.Make production report from the materials erected by each foreman and his group in different work sites and report or submit to my immediate superior (superintendent).

JOBSITES:

1.MUBARRAZ OPTIMIZE PROJECT

A.GOSP 1

B.GOSP 2

C.GOSP 6

D.GOSP 7

E.GOSP 8

PERIOD: JULY 2008 TO JUNE 2010

2.SHEDGUM FLARE POJECTS

3.UTHMANIYA FLARE PROJECTS

PERIOD: JUNE 2010 TO AUGUST 7, 2011

4.ABU ALI PRODUCING PLANT

PERIOD: AUGUST 08, 2011 TO FEBRUARY 2012

5.YASREF-YANBU SINOPEC REFINERY PROJECT

PERIOD: FEBRUARY 2012 TO AUGUST 04, 2013

SUMMARIZED ACCOMPLISHMENTS IN THE COMPANY:

1.Erection of Pipe Racks (Super Structures), Multiple platforms for various Mechanical Equipments, Multiple Miscellaneous Supports, Fabrication and Erection of Rundown Tank Platforms for GOSP 7 & GOSP 8. Team Leader for various shutdowns (GOSP 7, GOSP 8, GOSP 2 and GOSP 1 - pipes replacement, blinds and receptacles replacements)- optimize projects.

2.Erection of Multiple Miscellaneous Supports for GOSP 1, GOSP 2, GOSP 6, Wip 1 and Wip 2. Modifications and Erections.

3.Erection of Pipe Racks (Super Structures), Multiple platforms for various Mechanical Equipments, Erection of Lube Oil Seal Drums (LOS drums), Miscellaneous Supports and Multiple service access. (SHEDGUM GAS PLANTS)-Flare Projects.

4.Mobilization and demobilization Projects. Abu Ali Plant and Abu Adhrea – Demolition and Erection of various buildings. (Fabrication Shop Buildings, Civil Work Shop Buildings, Warehouse Buildings, Workshop Buildings, Painting Shop Buildings. Removal an Installation of Overhead Cranes.

5.Mobilization and Demobilization project at YASREF-Bonatti lay down area. Erection of Fabrication Shop Building, Office Building, Workshop Building (Modified and Erected), Warehouse Building.

6.Storage and energize of Mechanical Equipments.

7.Mobilization of Manpower (workers). Tasking and Posting for Civil and Mechanical workers.

8.Erection of Pipe Racks (Super structures), Miscellaneous Supports, Platforms at UTB Area, Sea Water Area. – Yanbu Sinopec Refinery Project.

ABOUT MYSELF:

-I AM A PERSON WITH FULL OF GOALS, PRECISE AND ACCURATE WORKING IS MY ATTITUDE IN ANY GIVEN JOB FOR ME. I DON’T WANT TO WASTE ANY TIME DURING WORKING PERIODS AT SITE AND IN THE OFFICE. I AM A PERSON WHO ALWAYS WANTS AN UPDATED RESULT FROM MY JOBS AND FROM MY GROUP TO SATISFY THE COMPANY AND ITS PROPONENT REGARDLESS OF TIME WHEN IT IS URGENTLY NEED. I HAVE THE ABILITY TO READ DESIGNS, PLANS IN ITS DESCRIPTIVE POSITONS AND LOCATIONS. A MUST KNOW HOW AND COMPETENCY ARE THE FACTORS FOR ME TO UNDERTAKE ANY JOBS. PROFICIENCY AND INITIATIVE IS A COURSE THAT ALWAYS CARRIES ME TO A GOOD PERFORMANCE.

MY GOAL FOR THE COMPANY:

-I WANT TO SHOW A MAN’S ABILITY AND SKILLS IN THE FIELD OF DISCIPLINE THAT I WANT TO WORK FOR AND SHARE WHATEVER KNOWLEDGE THAT I HAVE WITH MY CO-WORKERS TO BOOST A BETTER PRODUCTION FOR THE COMPANY. A JOB WITH A GOOD LEADER IS A SUCCESS OF ONE GOOD COMPANY.

-TO JOIN IN ONE COMPANY IS NOT VERY EASY IF YOU DON’T CARRY THE KNOWLEDGE AND SKILLS IN THE FIELD OF DISCIPLINE THAT YOU ARE WORKING FOR.

TRAINING AND SKILLS: (ARAMCO I.D. NO. 8844935-1-SURRENDERED)

TRAININGS:

1.SAUDI ARAMCO WORK PERMIT RECEIVER CERTIFICATE.

DATE: NOVEMBER 08, 2008 TO NOVEMBER 08, 2010.

2.SAUDI ARAMCO FIREWATCH TRAINING.

DATE: JANUARY 20, 2010 (ARAMCO I.D. NO. 8844935-1).

3.ORIENTATION FOR EMERGENCY RESPONSE PLAN (E.R.P.) SHEDGUM GAS PLANT (SGP).

DATE: JUNE 22, 2010 TO JUNE 22, 2013.

4.ORIENTATION FOR EMERGENCY RESPONSE PLAN (E.R.P.) UTHMANIYA GAS PLANT (UGP).

DATE: JUNE 22, 2010 TO JUNE 22, 2013.

5.“SAUDI HEART ASSOCIATION” (AFFILIATED WITH “AMERICAN HEART ASSOCIATION”) – FIRST AID AND HEART SAVER.

DATE: NOVEMBER 2010 TO NOVEMBER 2012

6.SAUDI ARAMCO-ABU ALI PRODUCING DEPARTMENT QUALITY ASSURANCE GROUP SAFETY ORIENTATION GROUP.

DATE: AUGUST 17, 2011 TO AUGUST 17, 2013.

7.BONATTI S.P.A. UPGRADE ABU ALI PLANT PROJECT SAFETY DEPARTMENT (HYDROGEN SULFIDE SAFETY AWARENESS TRAINING)

DATE: AUGUST 17, 2011 TO AUGUST 17, 2013.

8.RAS TANURA REFINERY CONTRACTOR EMPLOYEE SAFETY ORIENTATION. (ARAMCO I.D. NO. 8844935-1-SURRENDERED)

DATE: DECEMBER 19, 2011 DECEMBER 19, 2012.

9.YASREF (YANBU SINOPEC REFINERY COMPANY SAFETY TRAINING AND ORIENTATION)

DATE: JANUARY 26, 2013 TO JANUARY 26, 2014 (LATEST I.D -SURRENDERED).

SKILLS:

1.DESIGNS AND PLANS READING AND ANALYSING

2.MATERIAL EXPEDITER

3.MANPOWER AND MANHOUR COST ESTIMATOR

4.AT HEIGHT SUPERVISION

5.MATERIAL ENCODER

6.PROGRESS REPORTING

7.LEGIBLE IN TRANSACTING TO PROPONENTS AND CLIENTS

8.COMPUTER LEGIBLE

OTHER WORK EXPERIENCES:

COMPANY: PACIFIC METAL CORPORATION (PAMECO)

PROJECT: HANJINN SHIPYARD

ADDRESS: CAWAG, ZAMBALES

POSITION: STRUCTURAL STEEL COORDINATOR

DURATION: SEPTEMBER 21, 2007 TO JANUARY 21, 2008

STATUS: PART TIME JOB

DUTIES AND RESPONSIBILITIES:

1.Responsible in scheduling every foreman their respective job assignment.

2.Work system for the whole project is one of my responsibility. There should be an accurate system on executing jobs on prioritized area of the project.

3.Checking of materials and tools for the supposed project.

4.Assigning of manpower for the scheduled job to determine the duration and its supposed accomplishment.

5.Checking and analyzing of drawings and plans to locate the proper location of the structural erection.

6.Checking their verticality and horizontal elevation.

7.Making reports of the materials used, installed and erected to determine their total weight.

COMPANY: SELF-EMPLOYED

DURATION: 2003 TO 2007

NATURE: CONSTRUCTION

COMPANY: CAMPBRIDGE INSURANCE AGENCY, INC.

ADDRESS: PAG-IBIG BUILDING, EDSA CORNER EAST AVENUE, CUBAO, QUEZON

CITY, METRO MANILA

POSITION: PRODUCTION MANAGER/INSURANCE POLICY UNDERWRITER

INDUSTRY: NON-LIFE INSURANCE

DURATION: AUGUST 2000 TO JANUARY 2003

COMPANY: STRIDE INSURANCE AGENCY, INC.

ADDRESS: KAMIAS ROAD, WEST KAMIAS, CUBAO, QUEZON CITY, MM.

POSITION: PRODUCTION MANAGER/CORPORATE SECRETARY/

INSURANCE POLICY UNDERWRITER

INDUSTRY: NON-LIFE INSURANCE

DURATION: MARCH 22, 1995 TO SEPTEMBER 1999

COMPANY: P&H INSURANCE AGENCY INC.

ADDRESS: 302 FRANCISCO GOLD CONDIMINIUM BUILDING,

EDSA NEAR KAMIAS ROAD, CUBAO, QUEZON CITY, MM.

POSITION: PRODUCTION ASSISTANT MANAGER/POLICY UNDERWRITER

FIRE INSURANCE INSPECTOR

DURATION: FEBRUARY O1, 1990 TO FEBRUARY 1995

COMPANY: EASTERN ASSURANCE AND SURETY CO., INC.

ADDRESS: PEDRO GIL ST., MALATE, MANILA

POSITION: INSURANCE POLICY UNDERWRITER/ FIRE INSURANCE INSPECTOR

DURATION: MARCH 1986 TO SEPTEMBER 1989

REFERENCES:

1.Mr. Peter Faustino

Consultant/Training Manager

Peri Asia Philippines

Mobile no: +639**-***-****

+639**-***-****

2.Mr. Roque Ilio

Senior Sales Manager

Doka Philippines

Mobile no.: +639*********

3.Mr. Dawnie Ray Maputi

Regional People OPS Manager – APAC

Mobile no. : +639*********



Contact this candidate