DANTE SABANGAN DELOS REYES
BLOCK ** LOT **, ILANG-ILANG ST., MALIGAYA PARK SUBDIVISION,
NOVALICHES, QUEZON CITY 1118. METRO MANILA.PHILIPPINES TELEPHONE NUMBERS: +639*********/+639*********
PERSONAL INFORMATION:
AGE : 60 years old
BIRTH DATE : SEPTEMBER 26, 1963
BIRTHPLACE : POBLACION, ARITAO, NUEVA VIZCAYA
CIVIL STATUS : MARRIED
HEIGHT : 1.688 METERS
WEIGHT : 65 KILOGRAMS
EYES : BLACK
HAIR : BLACK
SEX : MALE
RELIGION : ROMAN CATHOLIC
NUMBER OF CHILDREN : FOUR (4)
LANGUAGE SPOKEN : ENGLISH, TAGALOG AND ILOCANO (LOCAL DIALECT)
PASSPORT NUMBER : P178909B
PLACE ISSUED : DFA NCR NORTH
DATE ISSUED : May 25, 2019
DATE OF VALIDITY : May 24, 2029
YASREF I.D. : C-720016
DATE OF VALIDITY : JANUARY 26, 2014 (SURRENDERED)
SAUDI GOV’T. I.D. : 225-***-****
CITIZENSHIP : FILIPINO
SPOUSE : NORLINDA MAGO DELOS REYES
ADDRESS : BLK. 31 LOT 23 ILANG-ILANG ST., PECHAYAN KANAN, MALIGAYA
PARK SUBD., NOVALICHES, QUEZON CITY, METRO MANILA
OCCUPATION : MERCHANDISER
FATHER : ANTERO VILLAFUERTE DELOS REYES
MOTHER : HEDELIZA SABANGAN DELOS REYES
Government Certificate : Civil Service (80.20%)
CURRENT LOCATION : QUEZON CITY, PHILIPPINES
STRENGTHS: MOTIVATED AND DISCIPLINED, CAN EASILY ADOPT JOB SYSTEMS, RESOURCEFUL, CREATIVE, ORGANIZED, POSITIVE AND HARDWORKING, WIDE KNOWLEDGE OF VARIOUS WORKS.
EDUCATIONAL BACKGROUND:
ELEMENTARY
SCHOOL NAME : ARITAO CENTRAL SCHOOL
SCHOOL ADDRESS : POBLACION, ARITAO, NUEVA VIZCAYA
SCHOOL YEAR : 1970 – 1976
STATUS : GRADUATE
SECONDARY t.c
SCHOOL NAME : SAINT TERESITA’S ACADEMY
SCHOOL ADDRESS : POBLACION, ARITAO, NUEVA VIZCAYA
SCHOOL YEAR : 1976 – 1980
STATUS : GRADUATE
COLLEGE:
COLLEGE/UNIVERSITY : GREGORIO ARANETA UNIVERSITY FOUNDATION DE LA SALLE
ADDRESS : VICTONETA PARK AVENUE, MALABON CITY, METRO MANILA
COURSE : BACHELOR OF SCIENCE IN MECHANICAL ENGINEERING
SCHOOL YEAR : 1981 - 1984
STATUS : UNDERGRADUATE
PREVIOUS JOBS:
COMPANY : PRIME BMD
ADDRESS : SOLAIRE, VERTIS NORTH, BAGONG PAG- ASA, QUEZON CITY
METRO MANILA. PHILIPPINES
POSITION : GENERAL FOREMAN – FORMWORKS
INDUSTRY : CONSTRUCTION
DURATION : FEBRUARY 19, 2020 TO JANUARY 13, 2021
PROJECT : RESIDENTIAL, MIDRISE AND HIGHRISE BUILDINGS, COMMERCIAL,
AND INDUSTRIAL BUILDINGS AND INFRASTRUCTURE.
DUTIES AND RESPONSIBILITIES:
1.AT YARD
-SUPERVISION OF UNLOADING OF FORMWORKS MATERIALS,PROPER PILING AND STORAGE OF MATERIALS, PREPARATION OF MATERIALS TO BE FABRICATED.
-CONDUCT SAFETY TOOL BOX MEETING, ORIENTATION ON PROPER MATERIALS AND TOOLS TO BE USED IN FABRICATING FORMWORKS REQUIREMENTS TO THE SITE.
-SCHEDULE MANPOWER FOR EVERY FORWORKS SYSTEM TO BE USED AS PER GIVEN REQUIRED ITEMS TO BE DELIVERED IN ACTIVE AREAS AT PROJECT SITE
-QUALITY INSPECTION OF FABRICATED MATERIALS AND SUPERVISION OF LOADING MATERIALS FOR SITE DELIVERY.
2.AT PROJECT SITE
-LOCATING AREAS AND INSPECTION OF PIRORITIES FOR INSTALLATION.
-SUPERVISE ERECTION, INSTALLATION OF FORMWORKS.
-DETERMINE THE STRENGTH AND QUALITY OF FORMWORKS SYTEM (HORIZONTAL AND VERTICAL) INSTALLED AND ERECTED AS PER CALCULATED DESIGNS AND DRAWINGS.
-FINAL CHECKING WITH THE QUALITY DEPARTMENT AND REPRESENTATIVE FROM THE FORMWORKS COMPANY FOR ITS FINALITY FOR CONCRETE POURING.
-PROPER STRIPPING, RE-SHORING FOR HORIZONTAL STRUCTURES, PROPER CLEANING, PILING AND STORAGE OF MATERIALS IS ALWAYS CONDUCTED.
-PROPER REPORTING OF ALL ACCOMPLISHED ACTIVITIES FROM YARD TO PROJECT SITE TO DETERMINE ANY AREAS TO BE PRIORITIZED AND PUNCH LISTS.
COMPANY : PERI ASIA PHILIPPINES, INC.
ADDRESS : 9/F NOLTower, Commerce Avenue corner Acacia Avenue,
Madrigal Business Park, Ayala Alabang,
1770 Muntinlupa City
POSITION : FORMWORKS/ SITE INSTRUCTOR
INDUSTRY : FORMWORK SCAFFOLDING ENGINEERING
DURATION : FEBRUARY 01, 2016 to June 15, 2019
PROJECT : INDUSTRIAL, COMMERCIAL,MIDRISE AND HIGH RISE
BUILDINGS AND INFRASTRUCTURES.
DUTIES AND RESPONSIBILITIES
-GIVE PROPER ORIENTATION, INTRODUCTION AND TRAINING FOR THE PRODUCTS OF PERI ASIA PHILIPPINES FOR FORMWORKS AND SCAFFOLDING SYSTEM INTRODUCED TO THE GENERAL CONTRACTOR’S SITE PERSONNEL INVOLVED IN FORMWORKS AND CONRETING ACTIVITIES AT THE PROJECT SITE.
-TIME TO TIME INSPECTION AT PROJECT SITE TO MAKE SURE THAT DESIGNS AND DRAWINGS WERE STICTLY FOLLOWED FOR ITS IMPLEMENTATION.
-CONDUCT FINAL CHECKING WITH THE QUALITY DEPARTMENT OF GENERAL CONTRACTOR AND ITS CONSULTANTS BEFORE FINAL APPROVAL FOR CONCRETE POURING.
COMPANY : EEI COPRORATION
ADDRESS : Bagumbayan, Quezon City
INDUSTRY : CONSTRUCTION AND ENGINEERING
POSITON : STRUSTURAL SUPERVISOR
DURATION : September 07, 2015 to November 07, 2015
PROJECT : METRO MANILA SKYWAY STAGE3
DUTIES AND RESPONSIBILITIES
Report directly to Construction Superintendent on his work area.
1.Conduct meeting on safety, quality and productivity targets on the assigned work area.
2.Read and familiarized on the scope of works, specifications, quality and productivity.
3.Prepare 3-weeks look ahead of schedule with forecast quantities and resources loading based on milestone targets.
4.Prepare materials requisition/withdrawal and distributes to his foreman (men).
5.Responsible for timely delivery of manpower, tools and equipment, materials requirement in his assigned work area.
6.Conduct in process and final quality inspection of his project area activities.
7.Review of daily accomplishment specification.
8.Conduct regular tool box meeting.
9.Uphold the Company’s Code of Business Conduct and Ethics, Fraud, Policy, Conflict of Interest and ensure his team’s compliance thereto.
COMPANY : BONATTI SPA BRANCH COMPANY-KSA
ADDRESS : 2nd Floor, Bseel Center, Feras Bin Nadher Street, Al Olaya Area, P.O. Box 1988 Al-Khobar 31952-Kingdom of Saudi Arabia
INDUSTRY : OIL and GAS and ENERGY POWER
POSITION : MECHANICAL SUPERVISOR ( STRUCTURAL STEEL)
DURATION : July 27, 2008 to July 27, 2013
STATUS : CONTRACT-FINISHED
DUTIES AND RESPONSIBILITIES (Steel Structural) – MODULE : PRE – ASSEMBLY AND ASSEMBLY
AT SITE: (SUPERVISE STEEL STRUCTURAL ERECTION AND ASSEMBLY)
10.Report directly to Construction Superintendent on his work area.
11.Responsible for meeting on safety, quality and productivity targets on the assigned work area.
12.Read and familiarized on the scope of works, specifications, quality and productivity.
13.Prepare 3-weeks look ahead of schedule with forecast quantities and resources loading based on milestone targets.
14.Prepare materials requisition/withdrawal and distributes to his foreman (men).
15.Responsible for timely delivery of manpower, tools and equipment, materials requirement in his assigned work area.
16.Conduct in process and final quality inspection of his project area activities.
17.Review of daily accomplishment specification.
18.Conduct regular tool box meeting.
19.Uphold the Company’s Code of Business Conduct and Ethics, Fraud, Policy, Conflict of Interest and ensure his team’s compliance thereto.
AT LAYDOWN AREA and OFFICE:
1. Coordinate with the Technical Department and Planning Department to check any priotized plans and drawings.
2.Check reports of erected materials to determine the following:
a.The materials being erected according to its piece mark
b.The verticality and horizontal elevation of any structure erected and installed.
3.Coordinate with the material man and material expediters to ensure that the materials to be sent are fitted for the structural erection at the project site.
4.Making daily time sheets for my code and their job codes.
5.Make production report from the materials erected by each foreman and his group in different work sites and report or submit to my immediate superior (superintendent).
JOBSITES:
1.MUBARRAZ OPTIMIZE PROJECT
A.GOSP 1
B.GOSP 2
C.GOSP 6
D.GOSP 7
E.GOSP 8
PERIOD: JULY 2008 TO JUNE 2010
2.SHEDGUM FLARE POJECTS
3.UTHMANIYA FLARE PROJECTS
PERIOD: JUNE 2010 TO AUGUST 7, 2011
4.ABU ALI PRODUCING PLANT
PERIOD: AUGUST 08, 2011 TO FEBRUARY 2012
5.YASREF-YANBU SINOPEC REFINERY PROJECT
PERIOD: FEBRUARY 2012 TO AUGUST 04, 2013
SUMMARIZED ACCOMPLISHMENTS IN THE COMPANY:
1.Erection of Pipe Racks (Super Structures), Multiple platforms for various Mechanical Equipments, Multiple Miscellaneous Supports, Fabrication and Erection of Rundown Tank Platforms for GOSP 7 & GOSP 8. Team Leader for various shutdowns (GOSP 7, GOSP 8, GOSP 2 and GOSP 1 - pipes replacement, blinds and receptacles replacements)- optimize projects.
2.Erection of Multiple Miscellaneous Supports for GOSP 1, GOSP 2, GOSP 6, Wip 1 and Wip 2. Modifications and Erections.
3.Erection of Pipe Racks (Super Structures), Multiple platforms for various Mechanical Equipments, Erection of Lube Oil Seal Drums (LOS drums), Miscellaneous Supports and Multiple service access. (SHEDGUM GAS PLANTS)-Flare Projects.
4.Mobilization and demobilization Projects. Abu Ali Plant and Abu Adhrea – Demolition and Erection of various buildings. (Fabrication Shop Buildings, Civil Work Shop Buildings, Warehouse Buildings, Workshop Buildings, Painting Shop Buildings. Removal an Installation of Overhead Cranes.
5.Mobilization and Demobilization project at YASREF-Bonatti lay down area. Erection of Fabrication Shop Building, Office Building, Workshop Building (Modified and Erected), Warehouse Building.
6.Storage and energize of Mechanical Equipments.
7.Mobilization of Manpower (workers). Tasking and Posting for Civil and Mechanical workers.
8.Erection of Pipe Racks (Super structures), Miscellaneous Supports, Platforms at UTB Area, Sea Water Area. – Yanbu Sinopec Refinery Project.
ABOUT MYSELF:
-I AM A PERSON WITH FULL OF GOALS, PRECISE AND ACCURATE WORKING IS MY ATTITUDE IN ANY GIVEN JOB FOR ME. I DON’T WANT TO WASTE ANY TIME DURING WORKING PERIODS AT SITE AND IN THE OFFICE. I AM A PERSON WHO ALWAYS WANTS AN UPDATED RESULT FROM MY JOBS AND FROM MY GROUP TO SATISFY THE COMPANY AND ITS PROPONENT REGARDLESS OF TIME WHEN IT IS URGENTLY NEED. I HAVE THE ABILITY TO READ DESIGNS, PLANS IN ITS DESCRIPTIVE POSITONS AND LOCATIONS. A MUST KNOW HOW AND COMPETENCY ARE THE FACTORS FOR ME TO UNDERTAKE ANY JOBS. PROFICIENCY AND INITIATIVE IS A COURSE THAT ALWAYS CARRIES ME TO A GOOD PERFORMANCE.
MY GOAL FOR THE COMPANY:
-I WANT TO SHOW A MAN’S ABILITY AND SKILLS IN THE FIELD OF DISCIPLINE THAT I WANT TO WORK FOR AND SHARE WHATEVER KNOWLEDGE THAT I HAVE WITH MY CO-WORKERS TO BOOST A BETTER PRODUCTION FOR THE COMPANY. A JOB WITH A GOOD LEADER IS A SUCCESS OF ONE GOOD COMPANY.
-TO JOIN IN ONE COMPANY IS NOT VERY EASY IF YOU DON’T CARRY THE KNOWLEDGE AND SKILLS IN THE FIELD OF DISCIPLINE THAT YOU ARE WORKING FOR.
TRAINING AND SKILLS: (ARAMCO I.D. NO. 8844935-1-SURRENDERED)
TRAININGS:
1.SAUDI ARAMCO WORK PERMIT RECEIVER CERTIFICATE.
DATE: NOVEMBER 08, 2008 TO NOVEMBER 08, 2010.
2.SAUDI ARAMCO FIREWATCH TRAINING.
DATE: JANUARY 20, 2010 (ARAMCO I.D. NO. 8844935-1).
3.ORIENTATION FOR EMERGENCY RESPONSE PLAN (E.R.P.) SHEDGUM GAS PLANT (SGP).
DATE: JUNE 22, 2010 TO JUNE 22, 2013.
4.ORIENTATION FOR EMERGENCY RESPONSE PLAN (E.R.P.) UTHMANIYA GAS PLANT (UGP).
DATE: JUNE 22, 2010 TO JUNE 22, 2013.
5.“SAUDI HEART ASSOCIATION” (AFFILIATED WITH “AMERICAN HEART ASSOCIATION”) – FIRST AID AND HEART SAVER.
DATE: NOVEMBER 2010 TO NOVEMBER 2012
6.SAUDI ARAMCO-ABU ALI PRODUCING DEPARTMENT QUALITY ASSURANCE GROUP SAFETY ORIENTATION GROUP.
DATE: AUGUST 17, 2011 TO AUGUST 17, 2013.
7.BONATTI S.P.A. UPGRADE ABU ALI PLANT PROJECT SAFETY DEPARTMENT (HYDROGEN SULFIDE SAFETY AWARENESS TRAINING)
DATE: AUGUST 17, 2011 TO AUGUST 17, 2013.
8.RAS TANURA REFINERY CONTRACTOR EMPLOYEE SAFETY ORIENTATION. (ARAMCO I.D. NO. 8844935-1-SURRENDERED)
DATE: DECEMBER 19, 2011 DECEMBER 19, 2012.
9.YASREF (YANBU SINOPEC REFINERY COMPANY SAFETY TRAINING AND ORIENTATION)
DATE: JANUARY 26, 2013 TO JANUARY 26, 2014 (LATEST I.D -SURRENDERED).
SKILLS:
1.DESIGNS AND PLANS READING AND ANALYSING
2.MATERIAL EXPEDITER
3.MANPOWER AND MANHOUR COST ESTIMATOR
4.AT HEIGHT SUPERVISION
5.MATERIAL ENCODER
6.PROGRESS REPORTING
7.LEGIBLE IN TRANSACTING TO PROPONENTS AND CLIENTS
8.COMPUTER LEGIBLE
OTHER WORK EXPERIENCES:
COMPANY: PACIFIC METAL CORPORATION (PAMECO)
PROJECT: HANJINN SHIPYARD
ADDRESS: CAWAG, ZAMBALES
POSITION: STRUCTURAL STEEL COORDINATOR
DURATION: SEPTEMBER 21, 2007 TO JANUARY 21, 2008
STATUS: PART TIME JOB
DUTIES AND RESPONSIBILITIES:
1.Responsible in scheduling every foreman their respective job assignment.
2.Work system for the whole project is one of my responsibility. There should be an accurate system on executing jobs on prioritized area of the project.
3.Checking of materials and tools for the supposed project.
4.Assigning of manpower for the scheduled job to determine the duration and its supposed accomplishment.
5.Checking and analyzing of drawings and plans to locate the proper location of the structural erection.
6.Checking their verticality and horizontal elevation.
7.Making reports of the materials used, installed and erected to determine their total weight.
COMPANY: SELF-EMPLOYED
DURATION: 2003 TO 2007
NATURE: CONSTRUCTION
COMPANY: CAMPBRIDGE INSURANCE AGENCY, INC.
ADDRESS: PAG-IBIG BUILDING, EDSA CORNER EAST AVENUE, CUBAO, QUEZON
CITY, METRO MANILA
POSITION: PRODUCTION MANAGER/INSURANCE POLICY UNDERWRITER
INDUSTRY: NON-LIFE INSURANCE
DURATION: AUGUST 2000 TO JANUARY 2003
COMPANY: STRIDE INSURANCE AGENCY, INC.
ADDRESS: KAMIAS ROAD, WEST KAMIAS, CUBAO, QUEZON CITY, MM.
POSITION: PRODUCTION MANAGER/CORPORATE SECRETARY/
INSURANCE POLICY UNDERWRITER
INDUSTRY: NON-LIFE INSURANCE
DURATION: MARCH 22, 1995 TO SEPTEMBER 1999
COMPANY: P&H INSURANCE AGENCY INC.
ADDRESS: 302 FRANCISCO GOLD CONDIMINIUM BUILDING,
EDSA NEAR KAMIAS ROAD, CUBAO, QUEZON CITY, MM.
POSITION: PRODUCTION ASSISTANT MANAGER/POLICY UNDERWRITER
FIRE INSURANCE INSPECTOR
DURATION: FEBRUARY O1, 1990 TO FEBRUARY 1995
COMPANY: EASTERN ASSURANCE AND SURETY CO., INC.
ADDRESS: PEDRO GIL ST., MALATE, MANILA
POSITION: INSURANCE POLICY UNDERWRITER/ FIRE INSURANCE INSPECTOR
DURATION: MARCH 1986 TO SEPTEMBER 1989
REFERENCES:
1.Mr. Peter Faustino
Consultant/Training Manager
Peri Asia Philippines
Mobile no: +639**-***-****
2.Mr. Roque Ilio
Senior Sales Manager
Doka Philippines
Mobile no.: +639*********
3.Mr. Dawnie Ray Maputi
Regional People OPS Manager – APAC
Mobile no. : +639*********