CURRICULUM VITAE
Applied position: General Manager/Dy.C.E.-Projects-Chennai
1. Firm: Resident Engineer-Gitec IGIP India Pvt Ltd (Project Management Consultants for KfW Funded Projects in Madhya Pradesh & Tamilnadu) 2. Status with Firm: Resident Engineer
3. Family Name: Bhoopathy .
4. First Names: Raja
5. Date of Birth: 09 July 1959
6. Nationality: Indian
7. Civil Status:
8. Postal Address
9. Mobile Phone
Married
Permanent:# 184 / 13, V . M . Street, Royapettah, Chennai, PIN : 600014 . INDIA . Present: #26A,First Floor,*Shree Prabhu Krupa",Sainath Colony,Barwani,Madhya Pradesh,India.PIN:451551.
10. Education: B.E. ( Civil Engineering ) with Crash Courses specialisations organised by Corporates from time to time.
Institution COLLEGE OF ENGINEERING, GUINDY, CHENNAI- 600032 Date: from (month/year) to (month/year) May 1977 to June 1982 ( 5 Year Course ) Degree(s) or Diploma(s) obtained B.E. ( Civil Engineering ) 11. Language skills (mark 1 [poor] to 5 [best] for competence): Language Reading Speaking Writing
1 Tamil Mother Tongue
2 English 5 5 5
3 Hindi 2 4 1
4 Malayalam 3 5 1
11/2020 Page 1 of 11
12. Other skills: ● MS-Office, Internet, Windows, MS power point, MS excel, MS word, ERP
(Enterprise Resource Planner) - Kanix 2 k, .Net Build Superfast, Online Chrome, Operating System Windows 95 to Windows 2010, AutoCAD Review, MS project, Primavera, FoxPro, SAP .
● Certificate of participation - Survey Camp organized by Anna University & TIDCO .
● Crash Course on Managing Projects for Results - By National Productivity Council, Bangalore . Course material covers CONTRACT LAWS .
● Computer Training Certificate - Awareness Level - Operating System, WordStar, Lotus 1-2-3, Hardware Usage-APTECH, Chennai.
● Computer Training Certificate-Advanced Level - Introduction to Programming Skills - DBMS - FoxPro - Flow Charting - APTECH .
● Certificate on Quality Concreting & RMC in Modern Construction by Construction Management wing of Anna University .
● Certificate on EDP ( Employee Development Program ) on improving Construction Productivity issued by Construction Industry Development Council. 13. Key Qualification
● B.E. ( Civil Engineering ) in 1982 from COLLEGE OF ENGINEERING, GUINDY, MADRAS ( ANNA ) UNIVERSITY .
( 5 YEARS - REGULAR COURSE ) .
● Successful ERP implementation in record 8 months in 2009-2010 for a Township Promoter using KANIX 2K.
● Highlighted points of this CV mention the expert knowledge on administration of FIDIC based ( Yellow Book / Gold Book ) or World Bank D' Contracts from both the Contractual side and the Construction Supervision side.
● Project Control of INR 800 Crores Thermal Power Plant Project in 2007-2008 apart from INR 2000 Crore Power Plant Tender Workings for Civil & Structural works in 2007-2008 and Project formulation for INR 5000 Crores Projects as well as handling Design & Detailed Engineering,Planning & Co-ordination of Architectural,Civil,MEICA and direct handling disciplines of Instrumentation,Piping etc apart from Architectural,Civil & Structural in Petrochemical Projects of repute are highlights of the career. 14. Regional experience / Experiences in foreign countries: Country Overall duration
India & Libya ( only 1998-99) Since 1982 and till presently ongoing ( > 35 + years working expertise ) 15. Professional Experience Record ( Projects, in reverse chronological order ) : 16. Date:31-01-2021 to Till Date : Resident Engineer - Khargone (Barwani & Sendhwa)- MPUSEP-Packages 2&3 Sewerage Schemes both KfW Bank (World Bank -Germany based) Funded Projects with value INR 105 Crores and INR 95 Crores respectively. Location: Barwani,Sendhwa cities in Barwani District,Madhya Pradesh. Resident Engineer under a Sub-Consultancy Agreement with Gitec-IGIP India Pvt Ltd,a part of the International GITEC Consultancy Group. Description :(1) INR 105 Crores 9 MLD Sewerage Scheme for Barwani under MPUSEPh Package-2 of MPUDCL-Madhya Pradesh Urban Development Company Ltd (a 100% Madhya Pradesh Government Owned Company.A long delayed Project (of size INR 105 Crores) since 2018 with 2% progress as on 01-02-2021 when taken charge by applicant,as on 26-05-2022 has made a progress of 70% going by degree of difficulty factor and the project includes Architectural,Civil & MEICA-Mechanical
,Electrical,Instrumentation,Controls and Automation).The project has seen two successful KfW Missions - I & II dt: 27-10-2021 and 04/05-05-2022.Before KfW Mission-I the nearly dead project was revived during severe Covid Lock down days of 2021 and from 01-06-2021 to 27-10-2021 the striking rate was phenomenal to contribute 40% progress and currently on 26-05-2022 it stands at 70% by the degree of difficulty standards.(2)INR 95 Crores Sewerage Scheme under KfW funded MPUSEP Package-3 has also been brought up from 2% progress from 28-09-2018 to 31-01-2021 has been brought to 70% progress as on 26-05-2022 as per degree of difficulty factor.This city of Sendhwa is within District of 11/2020 Page 2 of 11
Barwani situated 70km from Barwani.The capacity of the Sewage Treatment Plant is 8.5 MLD.It is also an integrated combined Sewerage Scheme catering to 100% of the Households and have provision of capacity expansion to another 25% for future.The design of process is for 30 years and with capacity expansion can cater to 45 years.These conditions are the same for Barwani also but for design capacity of 9MLD STP for Barwani.Except for STP capacities and different locations all other descriptions match for Barwani and Sendhwa.The detailed Engineering inputs, ESMP-Environmental and Social Management Plan and Project Monitoring & Scheduling,Bill processing,QA/QC and OHS are the scope common for both projects.
Date 04/2017 – 30-01-2021. Freelance work does not require a long time to quit. Location Chennai, Arakkonam – Tamil Nadu, Bangalore-Karnataka State, India. Private
Consultancy
Freelancer - Private Consultancy Works
Position Senior Consultant
Description Surface Drainage and StormWater Drainage for Coal Handling Plant of the Kamarajar Port Trust Phase-1 and a Fisherman’s Boat Jetty along Kosasthalaiyar river for Kamarajar Port Trust along river stretch of 1.2 KM and depth 2 m, at Chennai. The identification of Maximum Flood Level using the old Area Maps of the concerned villages is a task relevant to Storm Water Drainages. The sizes of the Storm Water Drainage 1.5m(w)x1.5m(d) and totalling about 12 km. Date 10/2014 to 03/2017
Location Chennai, Dindigul, Tirunelveli locations ( Tamil Nadu State ), Chengannur location - Kerala State Company M/S . TIRUCHITAMBALAM PROJECTS LIMITED .
Position Deputy General Manager-Operations Equivalent to TL/C.R.E./Sr.RE position in the World Bank Project. Description INR 50 Crores Civil, Architectural, MEP Works - Mechanical, Electrical & Piping Works etc., Fire fighting BMS - Building Management Services- instrumentation, Signage etc Complete for Three Super elevated Stations namely Koyambedu, CMBT, Arumbakkam being the very first three of Phase1 of Chennai Metro Rail Limited to International Standards within record 10 months and maintained for 2 years scot free. Civil & MEP Works - namely Mechanical, Electrical & Piping Works etc., included Storm Water Drainage and sewer Systems for the prestigious CMRL project. The Change order value amounted to INR 5 Crores and work done as per contractual terms was INR 45 crores . CMRL follows FIDIC standards. 1. Single Project 2.5 years CMRL - M/s. Chennai Metro Rail Limited’s - Super Elevated Metro Rail Stations Project - ( 2014 - 2017 ) ( A Joint Venture between Central Government of India and Tamil Nadu State Government ) - Storm Water Drainages, Sewer lines, Fire fighting system and Rainwater Harvesting System of value INR 9 Stores out of INR 50 Crores Project Works of Chennai Metro Rail Ltd's first 3 Super elevated stations at ( SKO - Code Word for Koyambedu Super Elevated Metro Rail Station ) Koyambedu location, ( SCM - Code Word for Super Elevated Metro Rail Station at CMBT- Chennai Mofussil Bus Terminus ) CMBT - Code Word for Chennai Mofussil Bus Terminus that provides Inter - State Bus Transport Services at that location ( won the best project award among all 7 stations of phase1 ) and ( SAR- Code Word for Super Elevated Metro Rail Station ) at Arumbakkam Location. Contractual side Assignment :
(1) (1)- Above- Main Contractor M/s. Tiruchitambalam Projects Limited’s side.
(2) Above mentioned is (1) out of (6) Government Sector Projects involved more than one year duration relating to Storm Water or Wastewater Collection, Treatment and disposal systems funded by the World Bank / Equivalent international funding agency. FIDIC Standards were followed in above (1) Government Sector Project which was aided by the World Bank / equivalent international funding agency of the Japanese Government. This project has been recognised by INTERNATIONAL ASSOCIATION OF PUBLIC TRANSPORT.Construction Supervision of Sewer 11/2020 Page 3 of 11
Systems and STP and monitoring and evaluation of various Contract Form Works and Consultancies, preparation of work plan and quarterly reports among others . Form Works types handled were LNT’s DOKA FORMWORK and TRADITIONAL FORM TYPES [ Traditional Form Type is built out of prefabricated modules with a metal frame ( usually steel or aluminium and covered on the application side ( concrete ) with material having the wanted surface structure ( steel, aluminium, timber etc.) ] in all Projects mentioned above . All above mentioned Sewer and Storm water drainages were end to end projects and planning, monitoring and supervision were essential to complete those projects . Work Plan, programmes using ms project, primavera have been extensively done . All projects required quarterly reports submissions to the concerned Managements and were done in each project mentioned above to the international Consortium of Consultants M/s. EMBYE and Client M/s. Chennai Metro Rail Limited. Quarterly Milestones and Key Dates achievements were essential in projects of international standards, as international Consultants levy penalties and fines for slippages in quarterly milestones. The Variation order to the tune of INR 5 Crores was approved by International Consultancy Consortium M/s. EMBYE for the INR 45 Crores Chennai Metro Rail Projects stated above. The claims were settled then there with the Client M/s. CMRL, in each Running Bill and disputes sorted out amicably through group discussions every week.
Date 05/2013 – 10/2014
Location Chennai - Tamil Nadu State, Sricity - Andhra Pradesh State Company M/s. Advanced Construction Technologies Private Limited. Position Manager- Design & Marketing - PRIMEKSS FLOORING DIVISION Description Project:- Design of Primekss Concrete Floors for the Client’s requirement, Date 02/2011– 05/2013
Location Chennai and outskirts of Chennai, Tamil Nadu State. Company
Other continuous assignments with prominent Builders in Chennai. Position Freelance Senior Consultant .
Description Cross Country sewer piping scheme for delivering 6 Lakhs litres per day of sewer to cross the 200 feet Chennai Bypass Road at underpass with Trenchless Technology ( horizontal Directional Drilling ) . Date 03/2011 – 08/2011
Location Chennai & Coimbatore of Tamil Nadu State. Company
M/s. Isha Homes (India) Private Limited,
Position Vice-President- Projects & Head - Engineering Equivalent to R.E. position in the World Bank Project . Description Project: Development of 1.2 million sq ft of quality Housings & Integrated Storm Water Drainages for 10 Lakhs sq ft of Township Projects including design of Master Plans and up to the execution of STPs, Drainages and Surface Runoffs.The size of Storm Water Drainage channels 1.5m(w) x 1.5m (d) for about 10km with 2.5km total length in each township project.Equivalent lengths of Cable ducts and Conduits had also been taken up.All Township Projects of M/s.Isha Homes were taken up End to End at Chennai and Coimbatore.ISHA Mia Villas 103 # at Chennai, Isha Group Housing 13#Blocks G+3 and a Coimbatore Villas Project of 100 villas project formulation were handled.All departments from Engineering,Projects,Purchase,Customer Relations were handled.At that time, ISHA HOMES handled INR 100 crores projects and it received the award BEST BUILDER 2011 award from BAI-Builders Association of India-Chennai Chapter. 11/2020 Page 4 of 11
Date 08/2008 – 03/2011
Location Chennai-Tamil Nadu State
Company M/s. Doshi Housing Pvt Ltd
Position GM-Projects- Executive equivalent to a TL/CRE/Sr.RE position in World Bank funded Projects. Description Project : 1.2 million sq ft Townships in 2.5 years .4 No’s STPs and two sewerage disposal arrangements required for large Housing projects satisfying parameters for letting out treated water into inland water bodies / resources.
1. 2.5 years SWD / STP / Surface Run-offs / Surplus Weir Diversion for Township projects ( 2008 - 2011 ) ( Private Sector Project with Statutory Approvals from State Government ) INR 40 Crores .All Drainages in townships projects of about 1.2 million sft have also been designed and constructed.
For 2.5 years INR 400 crores high end Township projects in 10 different locations totalling 1.2 million sq ft were completed.Engineering,Projects,Purchase Co-ordination and CRM functions were directly handled.
Date 07/2008– 08/2008
Location Chennai - Tamil Nadu State.
Company Freelance Private Consultancy Works.
Position Senior Consultant
Date 10/2007 and 07/2008
Location LOCATION : CHENNAI and Kothegudem- Andhra Pradesh. Company M/s.BGR ENERGY SYSTEMS LIMITED
Position Head Projects - civil in private Company equivalent to RE - position in the World Bank funded infrastructure projects .
Description Project Name : Civil and Structural Works of 2 x 250 MW Thermal Power Plant . Date 02/2007 and 09/2007
Location LOCATION : CHENNAI, ARIYALUR- Tamil Nadu State and Bhogapuram - Andhra Pradesh State . Company M/s. CHETTINAD BUILDERS PRIVATE LIMITED
Position Head - Technical & Project Management Consultant Equivalent to R.E. position in the WB Project . Description Project Name : StormWater Drainage System for diverting external flood during heavy rains for a INR 12 Crores Silica project at Bhogapuram, Andhra Pradesh, located at elevated mountain ridge discharging water into a public drainage at a lower elevation . Date 03/2005 and 02/2007
Location LOCATION: CHENNAI
Company M/s. ECE INDUSTRIES LIMITED
Position Contracts Executive equivalent to R.E. position in the World Bank projects . 11/2020 Page 5 of 11
Description Project Name: INR 70 Crores Railway Electrification Works And Sub- Contracts of NHAI - National Highways Authority of India’s Road Works and Drainages . Date 09/2003 and 03/2005
Location LOCATION : CHENNAI
Company Freelance Private Consultancy Work
Position Senior Consultant .
Description Project Name : Construction and industrial infrastructure projects . Date 02/2002 and 08/2003
Location LOCATION: CHENNAI,Pondicherry AND HAZIRA,GUJARAT Company M/s. SIMPLEX INFRASTRUCTURES PRIVATE LTD
Position SENIOR PROJECT MANAGER EQUIVALENT TO TL/C.R.E./Sr.RE POSITION IN THE WORLD BANK PROJECT.
Description Project Name : Sewage Disposal System Expansion - 3 Nos packages Numbers 10, 5A2, 1A2 of CMWSSB - Chennai Metropolitan Water Supply and Sewerage Board, each of 30 months duration for total length of 10261 meters of gravity sewers and 4146 m pumping main and 8860 m of interceptors including Civil, Mechanical and Piping Works .
1. Single Project - 3 packages - 2 years ( 2002 - 2003 ) ( Tamil Nadu State Government Project) Storm Water Drainages for 3 Chennai Metro Water Ltd's INR 30 Crores SWD - Storm Water Drainage - project.
2. Above mentioned is (1) out of (6) Government Sector Projects involved more than one year duration relating to Storm Water or Wastewater Collection, Treatment and disposal systems and funded by the World Bank / Equivalent funding agency.. Contractual side Assignment:
(1) (1)- Above - Contractor M/s. Simplex Infrastructures Ltd side. This being the infrastructure development Project of the Tamil Nadu State Government Funding was by the World Bank / Equivalent funding agency.
Construction Supervision of Sewer Systems and STP and monitoring and evaluation of various Contract Form Works and Consultancies, preparation of work plan and quarterly reports . Form Works types handled were TRADITIONAL FORM TYPES
[ Traditional Form Type is built out of prefabricated modules with a metal frame ( usually steel or aluminium and covered on the application side ( concrete ) with material having the wanted surface structure ( steel, aluminium, timber etc.) in all Projects mentioned above. All above mentioned Sewer and Storm water drainages were end to end projects and planning, monitoring and supervision were essential to complete those projects and were done accordingly .Work Plan, programmes using ms project have been extensively done.All projects required monthly/quarterly reports submissions to the concerned Managements and were done in each project mentioned above.Quarterly Milestones and Key Dates achievements were essential in projects of international standards, as such international Consultants levy penalties for slippages in quarterly milestones. Date 05/1999 and 02/2002
Location LOCATION: CHENNAI
Company Freelance Private Consultancy Work
Position Senior Consultant
11/2020 Page 6 of 11
Description Project Name : Includes projects for M/s. Zentech Solutions Pvt Ltd. etc. Date 07/1998 and 05/1999
Location LOCATION : SWANI, TRIPOLI, LIBYA
Company M/s.DS CONSTRUCTIONS PVT LTD
Position MANAGER - PLANNING EQUIVALENT TO R.E. POSITION IN THE WORLD BANK PROJECT. Description Project Name: A 500 m BT Road Constructed to international standards including a Steel Structural Bridge across a river in Libya, both design and execution completed in record 10 days. About 60000 sq ft of Group Housing Projects were among other Industrial projects were completed.
Date 02/1998 and 07/1998
Location LOCATION : CHENNAI, Tamil Nadu,
Company Freelance Private Consultancy Work
Position Senior Consultant
Description Project Name: as Freelance Consultant. Date 10/1995 and 02/1998
Location LOCATION : CHENNAI, Bangalore AND GURUGRAM - New Delhi. Company M/s . TARAPORE & CO
Position Senior Manager - Planning & Coordination equivalent to TL/C.R.E./Sr.RE position in the World Bank Project .
11/2020 Page 7 of 11
Description Project Name:
(1) Sewage Treatment Plant ( STP ) and Drainages System for 5 million sq ft first Condominium Township Laburnum at Sushant Lok Phase-1 at Gurugram, Haryana, (2) M/s. MIOT ( Madras Institute of Orthopaedics and Traumatology ) Hospital Project, a 1000 bed International Multi speciality Hospital, Chennai and (3) INR 28 Crores (1995) SAARC - South Asean Association of Regional Countries funded stadiums - Aquatic Complex, Tennis stadium, Hockey Stadium to international standards at Chennai for Sports Development authority of Tamilnadu. 1. ( 2 years ) Single Project in 1996-98 of ITC’s Laburnum at Gurugram, New Delhi (Private Sector Project with Statutory approvals from Government Departments) INR 7 Crores Storm Water Drainages, STP, and Surface Drainages, out of INR 70 Crores ( 1996-98 ) ITC's ( ITC - Indian Tobacco Company ) Laburnum Condominium Project, the first Condominium Project ( 5 million sq ft single project ) in India. FIDIC Standards were followed in above (1) funded by ITC Company . M/s. MIOT ( Madras Institute of Orthopaedics and Traumatology ) Hospital Project (1995-96) followed FIDIC standards and this was Contractor's side assignment. The Projects coordinated (1995-96) to implement SAARC- South Asian Association of Regional Countries- GAMES VILLAGE - INTERNATIONAL STANDARDS TENNIS STADIUM, INTERNATIONAL STANDARDS SWIMMING STADIUM AT AQUATIC COMPLEX, and INTERNATIONAL STANDARDS HOCKEY STADIUM at CHENNAI in 1995-96 and in addition to Projects such as M/s. M.I.O.T.
( Madras Institute of Orthopaedics and Traumatology ) HOSPITAL PROJECT ( 1000 BEDED )
( GERMAN FUNDED ) also followed World Bank project equivalent standards and FIDIC Standards. Construction Supervision of Sewer Systems and STP and monitoring and evaluation of various Contract Form Works and Consultancies, preparation of work plan and quarterly reports . Form Works types handled were MIVAN-FORMWORK at ITC’s LABURNUM PROJECT of 1996-98 and LNT’s DOKA FORMWORK used in Petrochemical Project at SPIC Kosapur and TRADITIONAL FORM TYPES [ Traditional Form Type is built out of prefabricated modules with a metal frame ( usually steel or aluminium and covered on the application side ( concrete ) with material having the wanted surface structure ( steel, aluminium, timber etc.) ] in all Projects mentioned above. All above mentioned Sewer and Storm water drainages were end to end projects and planning, monitoring and supervision were essential to complete those projects and were done accordingly. Work Plan, programmes using ms project have been extensively done.All projects required monthly / quarterly reports submissions to the concerned Consultants / PMC / Managements and were done in each project mentioned above.Quarterly Milestones and Key Dates achievements were essential in projects of international standards, as such international Consultants levy penalties and fines for slippages in quarterly milestones. Storm Water Drainage for the entire 5million sft Condominium is about 50 km of size 1.5m(w)x1.5m(d).Apart from these Cable trays /Conduits had been carried out for equal length of Storm Water Drainage.
The first Condominium Project in India namely 'the Laburnuum' having 5 million sq ft at Gurugram was taken up as End to End including involvement in design of Maiwan Shuttering and upto finishing works successfully among other Group Housings and Commercial Buildings at Bengaluru and Chennai.
Date 02/1995 and 10/1995
Location LOCATION: CHENNAI, Mahabalipuram and Bangalore Company Freelance Private Consultancy Work
Position Senior Consultant
Description Project Name: StormWater Drainage projects of M/s. Raheja Group . Date 10/1988 and 02/1995
Location LOCATION : CHENNAI, Karaikal and MUMBAI, Maharashtra State 11/2020 Page 8 of 11
Company M/s. Tamil Nadu Petroproducts Limited ( A Joint Venture of the Government of Tamil Nadu ) Position Deputy Manager( Planning & Civil ) Equivalent to TL/C.R.E. /Sr.R.E. position with the World Bank .
Description Project Name: INR 85 Crores Henkel Detergent Project ( A Joint Venture of M/s. Tamil Nadu Petro products Ltd and Henkel KGaA of Germany ) and INR 103 Crores EPH Petrochemical Project . 1. Single project 2 years ( 1990 - 92 ) ( Tamil Nadu State Government Joint Venture Project ) - in M/s. Henkel - SPIC india's Project Implementation of Storm Water Drainages, Fire Water System, STP, WWTP and Surface Drainage System ( INR 4 Crores out of INR 20 Crores Civil Works ).
2. Single project 2 years ( 1993 - 94 ) ( Tamil Nadu State Government Joint Venture Project ) - Storm Water Drainage, STP ( Sewage Treatment Plant ), WWTP ( WasteWater Treatment Plant ) and Fire Water System and Surface Drainages of M/s. Tamil Nadu Petro products Ltd- Epichlorohydrin Project. ( INR 5 Crores out of INR 20 Crores Civil Works Cost ).
(3) Above mentioned are (2) out of (6) Government Sector Projects involved more than one year duration relating to Storm Water or Wastewater Collection, Treatment and disposal systems involving funding by international Companies or agencies following World Bank / Equivalent funding Agency Standards. Construction Supervision side Assignments:
1. (1)-above - M/s. Henkel - SPIC Project of M/s. Tamil Nadu Petro products Ltd. Funding by M/s. HENKEL KGaA in order that M/s. Henkel had a base in South East Asia for expanding their market. The project followed World Bank Standards or equivalent international funding agency standards. 2. (2 )- Above - Epichlorohydrin Project of M/s. Tamil Nadu Petro products Ltd. The South Korean Company which had the Know-how for this product had partly funded the 100 % EOU and hence the project followed standards equivalent to WORLD BANK Standards or equivalent international Funding Agency Standards.. FIDIC Standards were followed in above (1) to (2) Government Sector Projects which were aided by international private funding agencies with World Bank equivalent standards. Sound experience in working in teams comprised of International and national experts: In the Henkel - SPIC project of 1990-92, the Coordination procedures were established for communications with M/s. HENKEL KGaA of Germany, M/s. SPIC Fine Chemicals Ltd ( both promoters ) and M/s. UHDE GmbH of Germany and its Indian subsidiary M/s. UHDE India Ltd ( Detailed Engineering Consultants ) and then with such system the whole project of 2 years duration was handled without any confusion successfully.
Similarly in 1993-95 ECH Project interface had successfully with TPL - M/s. Tamil Nadu Petroproducts Limited ( promoter ), M/s. UHDE India Ltd ( detailed engineering consultant ), the South Korean Know-how Company and the contractor team consisted of Companies of repute like M/s. LNT-ECC, M/s. Simplex, M/s. Tarapore & Co.
Construction Supervision of Sewer Systems and STP and monitoring and evaluation of various Contract Form Works and Consultancies, preparation of work plan and quarterly reports among others.
Form Works types handled were LNT’s DOKA FORMWORK extensively used in Henkel-SPIC Detergent Project of 1990-92 and a private project in 2003 and TRADITIONAL FORM TYPES
[ Traditional Form Type is built out of prefabricated modules with a metal frame ( usually steel or aluminium and covered on the application side ( concrete ) with material having the wanted surface structure ( steel, aluminium, timber etc.) ] in all Projects mentioned above. All above mentioned Sewer and Storm water drainages were end to end projects and planning, monitoring and supervision were essential to complete those projects and were done accordingly. Work Plan, programmes using ms project, primavera have been extensively done. All projects required monthly / quarterly reports submissions to the concerned Managements and were done in each project mentioned above.
Quarterly Milestones and Key Dates achievements were essential in projects of international standards, as such international Consultants levy penalties and fines for slippages in quarterly milestones.
11/2020 Page 9 of 11
Date 10 / 1982 and 10 / 1988
Location LOCATION: CHENNAI - TAMILNADU STATE, COCHIN - KERALA STATE and VISAKHAPATNAM - ANDHRA PRADESH STATE .
Company M/s. RICHARDSON & CRUDDAS (1972) LTD
Position JUNIOR PROJECT ENGINEER - PROJECTS - Officer of Central Government Enterprises in India. Description Project Name: End to End Water Treatment Plants, WasteWater Treatment Plants, Effluent Treatment Plants, Sewage Treatment Plants and connected Piping and Delivery Systems . 1. Single project 3 years (1982-85) (Tami Nadu State Government Project) 2.75 MLD Water Treatment Plant for Bangalapudur, Erode District of Tami Nadu, India for TWAD (Tamil Nadu Water Supply and Drainage Board).
2. Single Project 3 years In 1985-88 a 4 MLD WWTP for M/s. Kochi Refineries Ltd and Surface Drains of the Benzene Expansion Project ( A JV of M/s. Phillips Petroleum Company of USA and Ministry of Petroleum, Govt of India ) as Project-in-charge of Main Contractor M/s. Richardson & Cruddas ( 1972 ) Ltd ( A Govt of India Undertaking ) and Consultants were M/s. Engineers India Ltd ( A Govt of India Undertaking ) in designing and implementing at Kochi, Kerala.
3. Above mentioned (2) out of (6) Government Sector Projects involved more than one year duration relating to Storm Water or Wastewater Collection, Treatment and disposal systems which were funded by the World Bank (1) above and International Private Agency funding following the World Bank Standards or Equivalent funding Agency Standards (2) . Contractual side Assignments:
(1) (1) - Above- TWAD Board- Tamil Nadu Water Supply and Drainage Project was from Contractor M/s. Richardson & Cruddas ( 1972 ) Ltd’s side.
(2) (2) - Above- Contractor M/s. Richardson & Cruddas
( 1972 ) Ltd’s side.
FIDIC Standards were followed in all above (1) to (2) Government Sector Projects which were aided by the World Bank / Equivalent international private funding agency. Sound experience in working in teams comprised of International and national experts: In early 1985-88 such interface was with M/s. Kochi Refineries Ltd (A JV of Phillips Petroleum of USA and Ministry of Petroleum, Govt of India) and the Main Contractor M/s. Richardson & Cruddas
(1972)Ltd (A Govt of India Undertaking ) and Consultants M/s. Engineers India Ltd ( A Govt of India Undertaking) in designing and implementing and completing a 4 MLD WWTP at Ambalamugal in Kochi, Kerala for three years (1985-1988).
TRADITIONAL FORM TYPES [ Traditional Form Type is built out of prefabricated modules with a metal frame ( usually steel or aluminium and covered on the application side ( concrete ) with material having the wanted surface structure ( steel, aluminium, timber etc.) ] and TAILOR MADE FORMS [ Tailor made means “ Ready Made Components “ such as Inspection Shafts, Joints, Concrete Pipes of Large Diameter ] and specially made to order Circular Forms required for Clarifiers RCC Construction were extensively used.
Date 06/1982 and 10/1982
Location LOCATION: CHENNAI, Tami Nadu
Company M/s . KCP LIMITED
Position Graduate Engineer Trainee.
Description Project Name: Factory Workshop Building at KCP Ltd . 17. Certification
I, the undersigned, certify that to the best of my knowledge and belief, these data correctly describe me, 11/2020 Page 10 of 11
my qualifications, and my experience.