Post Job Free
Sign in

Team Leader Service

Location:
Bandar Seri Begawan, Brunei-Muara, Brunei Darussalam
Posted:
August 07, 2024

Contact this candidate

Resume:

*

MUHAMMAD SYAFIQ BIN ABDUL SALAM

+673-*******

****.**********@*****.***

No. 47, Simpang 46, Jln Taripas, Kg Panaga Seria

Kuala Belait KB4533

KEY SKILLS

Good team leader

Fast learner

Manage service team from beginning to end of required work Basic knowledge on Microsoft Office

EDUCATION

1994 Anthony Abell College Seria

PROFESSIONAL TRAINING PROGRAMS

2022 Senior First Aid with St. John

Ambulance

2012 Job Hazards Analysis and Risk

Assessment

Supervising for Safety (SFS)

IMIST Course 2011 Rigging and Slinging

Work Management Procedure

(WMP)

Banksman Level 1 and Level 2

Permit Vision Rigging and Slinging CAP

T-BOSIET Training Gas Testing

Forklift Truck Driving 10 Ton Below

2015 Initial Helicopter Landing Officer

(HLO)

LPI Emotional Excellence in

Workplace

2014 Safeguarding Information 2010 Managing Hazards at Workplace ISSOW Course

2013 Competent Frontline Worksite

Supervisor

Permit to Work for Supervisor

IRM-ELIS Awareness Training

Data Privacy Knowledge Training

2021 Shell Permit Vision – Module 1,2,3,4 & 6

2

WORK EXPERIENCE

Over 19 years of experience in Oil and Gas Industry on assisting fabrication for onshore Jacket Platform and later, pursue career to offshore Construction Related Brunei Shell Petroleum. Adinin Works & Engineering Sdn Bhd 24 Feb – Persent Permit Coordinator

Project: ORMC Project

Office: PtasAker Office

Prepare the permit to work readiness for execution of the work

Assist with site survery as per the permit to work requirement

Submit application of permit vision as per planned work scope

Responsible for the preparation of permit to work for personnel going offshore

Ensure review and preparation of necessary project specific adjustments and supplements of site relates parts of execution model with focus on:Procedures,Wrok Instructions and Delivery Checklist

Able to focus on fuctional design solutions with respect to overall system functionality and operability,HSE aspect,constructability and cost reduction

Considerable knowledge and expertise in the company’s established guideline,policies and procedures

Amend ISSOW to IMIST and PV system

Rosponsible to discuss with client Asset team/PIP related to darification & requirements on regular basis

Responsible to review and prepare necessary supporting documents such as JHA in advance for permit application

Responsible to develop and maintain summary matrix for the permit

Offshore in front of site survey

Serikandi Oilfield Services Sdn Bhd Mar 2021 – 23 Feb 2022 Assistant Construction Supervisor

Project: Offshore Maintenance and Integrity Support Project Vessel: Posh Elegance,Office Serikandi,HQ BSP and X-26 Office

Apply permit for work project

Coordinate with BSP on work plan and issued permit

Prepare Rigging and Lifting plan

Communicate with BSP team on site for permit live 3

Supervise third party crew on worksite

Update and submit Daily Progress Report to onshore

Prepare work and job planning

Adinin Works & Engineering Sdn Bhd 2018 – Feb 2021 Assistant Construction Supervisor

Project: West Maintenance Workboat Project & ORMC Project Vessel: Belait Aishah & Icon Valiant

Apply permit for work project and support PTAS Aker PAP

Coordinate with BSP on work plan and issued permit

Prepare Rigging and Lifting plan

Communicate with BSP team on site for permit live COOEC Offshore Oil Engineering Co Ltd 2015 – 2017 Construction Supervisor

Project: Zawtika 1B Development Project 2015

Vessel: Lanjing Barge

Radio Operate duty

Operate radio equipment in order to communicate with ships, aircraft, mining crews, offshore platform, logging camps and remote operations

Coordinate radio-related aspects of locating and contacting airplanes and ships that are missing or in distress

Review applicable regulations regarding radio communications, and report violation

Helicopter Landing Officer duty

Project: Installation of Offshore Structure & Pipeline Project 2015 Vessel: Lanjing Barge

Apply permit for Project Team

Lifting materials for Project Team

Assisting BSP Team at worksite if any required Jacket installation

Pick up and ending Jacket

Install handrail

Install topside

4

Brunei Swiber Offshore Construction 2014 – 2015

Senior Shift Supervisor

Project: Decomissioning & Pre-commissioning Project 2014 Vessel: Swiber Carina & Pacific Nickle

Familiarization of different types of pigs

Install pipe launcher and pipe receiver from platform to platform

Apply different hoses and fittings

Perform hydrotest

Perform task cleaning, gauging and flooding

Perform task dewatering, air drying, nitrogen purging & packing Project: PID37 Stuck Pig Project 2014 (FAPP-03)

Vessel: Swiber Carina & Pacific Nickle

Install pipe receiver on platform FAPP03 and connect onto vessel tank

Apply different hoses and fittings

Receive oil and pig

Post backflow activity

Install hose for discharging from vessel tank onto AMCP06 Brunei Swiber Offshore Construction Jul 2013 – Jul 2014 Shift Supervisor

Project: CWF B1P CP-7 Power Generation Project 2013 Vessel: Swiber – PWJ 3000 – Install HP Compressor Project

Power generation installation on CPEP-07 cellar deck

Pick up and end power generation

Perform task welding/cutting and grinding

Install handrail

Lifting of CPEP-07 generator by PWJ 3000

Install slings and shackles located above lifting frame Project: CWF B23 Jacket Installation 2013

Vessel: Swiber Resolute

Jacket installation and familiarization of leg number

Pick up and end jacket

Piling

5

Project: AMPA09 HP Compressor Project 2013

Vessel: Swiber – PWJ 3000 – Install 99 & 99 HP Compressor Project

Install HP Compressor installation on AMP09 Jacket

Pick up and end HP Compressor

Welding/cutting and grinding

Install handrail

Project: Decommissioning Project 2013

Vessel: Petani Selatan & Pacific Nickle – Pre-commissioning

Familiarization of different types of pigs

Install pipe launcher and pipe receiver from platform to platform

Apply different hoses and fittings

Perform hydrotest

Perform task cleaning, gauging and flooding

Perform task dewatering, air drying, nitrogen purging and packing Project: Decommissioning Project 2012

Vessel: Swiber Carina, Tugas 2 – Pre-commissioning

Familiarization of different types of pigs

Install pipe launcher and pipe receiver from platform to platform

Apply different hoses and fittings

Perform hydrotest

Perform task cleaning, gauging and flooding

Perform task dewatering, air drying, nitrogen purging & packing 6

Brunei Swiber Offshore Construction 2012 – 2013

Assistant Shift Supervisor

Project: Bulan-Bulan Project 2013

Vessel: Swiber Victorious & Jaya Installer 10 – Riser, Jtube, Cable Lay & Hookup, OSWJ 01 & 02 – Riser, Tie In & Hookup

Structural, cable and pipe support

Install two pig Receiver and associate piping – vents, drains, relief valve, blow down valves

Install two-line pipes from Receiver to ESD platform

Preservation of topside piping

Install new service desk and main deck extension

Install field instrumentation and cabling

FO cabling and termination on CWWJ02 and Champion Complex (CP-07)

Replace RMU

Project: CTU Project 2012-2013

Vessel: Swiber Victorious – Installation of Gangway for CTU Project

Install gangway for CTU (Schlumberger)

Banksman for CTU equipment

Heavy lift CTU equipment

Project: Decommissioning Project 2012

Vessel: Swiber Carina & Tugas 2 – Pre-commissioning

Familiarization of different types of pigs

Install pipe launcher and pipe receiver from platform to platform

Apply different hoses and fittings

Perform hydrotest

Perform task cleaning, gauging and flooding

Perform task dewatering, air drying, nitrogen purging and packing Project: Danau Bubut – Hookup & Touchup 2012

Vessel: Swiber Carina

Touch-up and painting

Remove scaffolding

Welding

7

Project: CPNQ07 – Blasting & Painting Utility Deck 2012 Vessel: Swiber Carina

Painting and blasting

Prepare work and job planning

Project: CPNQ07 – Installation of Utility & Module Deck 2012 Vessel: Swiber Magnificent

Utility installation

Pick up and end utility deck

Welding/cutting and grinding

Install handrail

Install helideck

Project: Danau Bubut – Installation Jacket 2012

Vessel: Swiber Resolute

Jacket installation

Pick up and end Jacket

Piling and familiarization of leg numbers

Install handrail and topside

Brunei Swiber Offshore Construction 2010 – 2011

Construction Supervisor

Project: CRP – Cable Replacement 2011

Vessel: Swiber Aziz

Install riser clamp

Rigging for J-tube

Metrology for accurate depth

Install taut wire and cable replacement at platform to platform

Lifting of J-tube

Project: CWF – Champion Water Flood 2011 – Re-instate & Pre-commissioning Vessel: Ajang Harapan

Monitor installation of topside spools

Witness Subsea work

8

Project: CWF – Champion Water Flood 2011 – Pre-commissioning Vessel: Swiber Carina

Familiarization of different types of pigs

Install pipe launcher and pipe receiver on platform to another platform

Apply different hoses and fittings

Perform hydrotest

Perform task cleaning, gauging and flooding

Perform task dewatering, air drying, nitrogen purging and packing Project: Decomissioning Project 2010 – Pre-commissioning Vessel: Petani Selatan & Laut Barat

Familiarization of different types of pigs

Install pipe launcher and pipe receiver on platform to another platform

Apply different hoses and fittings

Perform hydrotest

Perform task cleaning, gauging and flooding

Perform task dewatering, air drying, nitrogen purging and packing Project: SKID 2010 – Pipe Laying

Vessel: Swiber Conquest

Learn on different types of pipes for tally sheet

Knowledge on pipe number thickness, size, grade and length

Install concrete mattress and eura duct

Knowledge on steps for pipe laying methods

Install new pipe on new platform to Champion 7 platform Brunei Swiber Offshore Construction 2008 – 2010

Material Assistant

Project: Bugan – MOL 2008/2009

Vessel: Material Barge

Loading pipes from Telisai to material barge

Loading materials from Swiber base to Muara port

Loading concrete mattress from supply to material barge at Muara port

Loading cable drums from offshore to Muara port

Loading containers from offshore to Swiber Base

9

Project: Bugan – MOL 2008/2009

Vessel: Laut Barat & Pesut 2

Ensure seabed is clean for new project

Supervise third party crew on worksite

Update and submit Daily Progress Report to onshore Syarikat Kejuruteraan Sistematik Sdn Bhd 2005 – 2008 Supervisor Blasting & Painting

Project: MCY & MPS Project 2005/2008

Responsible for leadman task and direct supervision to subordinates

Involved in offshore construction and maintenance yard project Syarikat Kejuruteraan Sistematik Sdn Bhd 2004 – 2005 Storekeeper

Project: MCY Project 2004/2005

Issue incoming/outgoing material stock

Monthly material stock balancing

Responsible for consumable materials and accessories purchase

Supervise subordinate’s timecard

Syarikat Kejuruteraan Sistematik Sdn Bhd 2001 – 2003 Helper

Project: BSP & BLNG Project 2001/2003

Marker pottering and measures

Perform task metal grinding for project

Assist fitter, welder and supervisor on required task