MUHAMMAD SYAFIQ BIN ABDUL SALAM
****.**********@*****.***
No. 47, Simpang 46, Jln Taripas, Kg Panaga Seria
Kuala Belait KB4533
KEY SKILLS
Good team leader
Fast learner
Manage service team from beginning to end of required work Basic knowledge on Microsoft Office
EDUCATION
1994 Anthony Abell College Seria
PROFESSIONAL TRAINING PROGRAMS
2022 Senior First Aid with St. John
Ambulance
2012 Job Hazards Analysis and Risk
Assessment
Supervising for Safety (SFS)
IMIST Course 2011 Rigging and Slinging
Work Management Procedure
(WMP)
Banksman Level 1 and Level 2
Permit Vision Rigging and Slinging CAP
T-BOSIET Training Gas Testing
Forklift Truck Driving 10 Ton Below
2015 Initial Helicopter Landing Officer
(HLO)
LPI Emotional Excellence in
Workplace
2014 Safeguarding Information 2010 Managing Hazards at Workplace ISSOW Course
2013 Competent Frontline Worksite
Supervisor
Permit to Work for Supervisor
IRM-ELIS Awareness Training
Data Privacy Knowledge Training
2021 Shell Permit Vision – Module 1,2,3,4 & 6
2
WORK EXPERIENCE
Over 19 years of experience in Oil and Gas Industry on assisting fabrication for onshore Jacket Platform and later, pursue career to offshore Construction Related Brunei Shell Petroleum. Adinin Works & Engineering Sdn Bhd 24 Feb – Persent Permit Coordinator
Project: ORMC Project
Office: PtasAker Office
Prepare the permit to work readiness for execution of the work
Assist with site survery as per the permit to work requirement
Submit application of permit vision as per planned work scope
Responsible for the preparation of permit to work for personnel going offshore
Ensure review and preparation of necessary project specific adjustments and supplements of site relates parts of execution model with focus on:Procedures,Wrok Instructions and Delivery Checklist
Able to focus on fuctional design solutions with respect to overall system functionality and operability,HSE aspect,constructability and cost reduction
Considerable knowledge and expertise in the company’s established guideline,policies and procedures
Amend ISSOW to IMIST and PV system
Rosponsible to discuss with client Asset team/PIP related to darification & requirements on regular basis
Responsible to review and prepare necessary supporting documents such as JHA in advance for permit application
Responsible to develop and maintain summary matrix for the permit
Offshore in front of site survey
Serikandi Oilfield Services Sdn Bhd Mar 2021 – 23 Feb 2022 Assistant Construction Supervisor
Project: Offshore Maintenance and Integrity Support Project Vessel: Posh Elegance,Office Serikandi,HQ BSP and X-26 Office
Apply permit for work project
Coordinate with BSP on work plan and issued permit
Prepare Rigging and Lifting plan
Communicate with BSP team on site for permit live 3
Supervise third party crew on worksite
Update and submit Daily Progress Report to onshore
Prepare work and job planning
Adinin Works & Engineering Sdn Bhd 2018 – Feb 2021 Assistant Construction Supervisor
Project: West Maintenance Workboat Project & ORMC Project Vessel: Belait Aishah & Icon Valiant
Apply permit for work project and support PTAS Aker PAP
Coordinate with BSP on work plan and issued permit
Prepare Rigging and Lifting plan
Communicate with BSP team on site for permit live COOEC Offshore Oil Engineering Co Ltd 2015 – 2017 Construction Supervisor
Project: Zawtika 1B Development Project 2015
Vessel: Lanjing Barge
Radio Operate duty
Operate radio equipment in order to communicate with ships, aircraft, mining crews, offshore platform, logging camps and remote operations
Coordinate radio-related aspects of locating and contacting airplanes and ships that are missing or in distress
Review applicable regulations regarding radio communications, and report violation
Helicopter Landing Officer duty
Project: Installation of Offshore Structure & Pipeline Project 2015 Vessel: Lanjing Barge
Apply permit for Project Team
Lifting materials for Project Team
Assisting BSP Team at worksite if any required Jacket installation
Pick up and ending Jacket
Install handrail
Install topside
4
Brunei Swiber Offshore Construction 2014 – 2015
Senior Shift Supervisor
Project: Decomissioning & Pre-commissioning Project 2014 Vessel: Swiber Carina & Pacific Nickle
Familiarization of different types of pigs
Install pipe launcher and pipe receiver from platform to platform
Apply different hoses and fittings
Perform hydrotest
Perform task cleaning, gauging and flooding
Perform task dewatering, air drying, nitrogen purging & packing Project: PID37 Stuck Pig Project 2014 (FAPP-03)
Vessel: Swiber Carina & Pacific Nickle
Install pipe receiver on platform FAPP03 and connect onto vessel tank
Apply different hoses and fittings
Receive oil and pig
Post backflow activity
Install hose for discharging from vessel tank onto AMCP06 Brunei Swiber Offshore Construction Jul 2013 – Jul 2014 Shift Supervisor
Project: CWF B1P CP-7 Power Generation Project 2013 Vessel: Swiber – PWJ 3000 – Install HP Compressor Project
Power generation installation on CPEP-07 cellar deck
Pick up and end power generation
Perform task welding/cutting and grinding
Install handrail
Lifting of CPEP-07 generator by PWJ 3000
Install slings and shackles located above lifting frame Project: CWF B23 Jacket Installation 2013
Vessel: Swiber Resolute
Jacket installation and familiarization of leg number
Pick up and end jacket
Piling
5
Project: AMPA09 HP Compressor Project 2013
Vessel: Swiber – PWJ 3000 – Install 99 & 99 HP Compressor Project
Install HP Compressor installation on AMP09 Jacket
Pick up and end HP Compressor
Welding/cutting and grinding
Install handrail
Project: Decommissioning Project 2013
Vessel: Petani Selatan & Pacific Nickle – Pre-commissioning
Familiarization of different types of pigs
Install pipe launcher and pipe receiver from platform to platform
Apply different hoses and fittings
Perform hydrotest
Perform task cleaning, gauging and flooding
Perform task dewatering, air drying, nitrogen purging and packing Project: Decommissioning Project 2012
Vessel: Swiber Carina, Tugas 2 – Pre-commissioning
Familiarization of different types of pigs
Install pipe launcher and pipe receiver from platform to platform
Apply different hoses and fittings
Perform hydrotest
Perform task cleaning, gauging and flooding
Perform task dewatering, air drying, nitrogen purging & packing 6
Brunei Swiber Offshore Construction 2012 – 2013
Assistant Shift Supervisor
Project: Bulan-Bulan Project 2013
Vessel: Swiber Victorious & Jaya Installer 10 – Riser, Jtube, Cable Lay & Hookup, OSWJ 01 & 02 – Riser, Tie In & Hookup
Structural, cable and pipe support
Install two pig Receiver and associate piping – vents, drains, relief valve, blow down valves
Install two-line pipes from Receiver to ESD platform
Preservation of topside piping
Install new service desk and main deck extension
Install field instrumentation and cabling
FO cabling and termination on CWWJ02 and Champion Complex (CP-07)
Replace RMU
Project: CTU Project 2012-2013
Vessel: Swiber Victorious – Installation of Gangway for CTU Project
Install gangway for CTU (Schlumberger)
Banksman for CTU equipment
Heavy lift CTU equipment
Project: Decommissioning Project 2012
Vessel: Swiber Carina & Tugas 2 – Pre-commissioning
Familiarization of different types of pigs
Install pipe launcher and pipe receiver from platform to platform
Apply different hoses and fittings
Perform hydrotest
Perform task cleaning, gauging and flooding
Perform task dewatering, air drying, nitrogen purging and packing Project: Danau Bubut – Hookup & Touchup 2012
Vessel: Swiber Carina
Touch-up and painting
Remove scaffolding
Welding
7
Project: CPNQ07 – Blasting & Painting Utility Deck 2012 Vessel: Swiber Carina
Painting and blasting
Prepare work and job planning
Project: CPNQ07 – Installation of Utility & Module Deck 2012 Vessel: Swiber Magnificent
Utility installation
Pick up and end utility deck
Welding/cutting and grinding
Install handrail
Install helideck
Project: Danau Bubut – Installation Jacket 2012
Vessel: Swiber Resolute
Jacket installation
Pick up and end Jacket
Piling and familiarization of leg numbers
Install handrail and topside
Brunei Swiber Offshore Construction 2010 – 2011
Construction Supervisor
Project: CRP – Cable Replacement 2011
Vessel: Swiber Aziz
Install riser clamp
Rigging for J-tube
Metrology for accurate depth
Install taut wire and cable replacement at platform to platform
Lifting of J-tube
Project: CWF – Champion Water Flood 2011 – Re-instate & Pre-commissioning Vessel: Ajang Harapan
Monitor installation of topside spools
Witness Subsea work
8
Project: CWF – Champion Water Flood 2011 – Pre-commissioning Vessel: Swiber Carina
Familiarization of different types of pigs
Install pipe launcher and pipe receiver on platform to another platform
Apply different hoses and fittings
Perform hydrotest
Perform task cleaning, gauging and flooding
Perform task dewatering, air drying, nitrogen purging and packing Project: Decomissioning Project 2010 – Pre-commissioning Vessel: Petani Selatan & Laut Barat
Familiarization of different types of pigs
Install pipe launcher and pipe receiver on platform to another platform
Apply different hoses and fittings
Perform hydrotest
Perform task cleaning, gauging and flooding
Perform task dewatering, air drying, nitrogen purging and packing Project: SKID 2010 – Pipe Laying
Vessel: Swiber Conquest
Learn on different types of pipes for tally sheet
Knowledge on pipe number thickness, size, grade and length
Install concrete mattress and eura duct
Knowledge on steps for pipe laying methods
Install new pipe on new platform to Champion 7 platform Brunei Swiber Offshore Construction 2008 – 2010
Material Assistant
Project: Bugan – MOL 2008/2009
Vessel: Material Barge
Loading pipes from Telisai to material barge
Loading materials from Swiber base to Muara port
Loading concrete mattress from supply to material barge at Muara port
Loading cable drums from offshore to Muara port
Loading containers from offshore to Swiber Base
9
Project: Bugan – MOL 2008/2009
Vessel: Laut Barat & Pesut 2
Ensure seabed is clean for new project
Supervise third party crew on worksite
Update and submit Daily Progress Report to onshore Syarikat Kejuruteraan Sistematik Sdn Bhd 2005 – 2008 Supervisor Blasting & Painting
Project: MCY & MPS Project 2005/2008
Responsible for leadman task and direct supervision to subordinates
Involved in offshore construction and maintenance yard project Syarikat Kejuruteraan Sistematik Sdn Bhd 2004 – 2005 Storekeeper
Project: MCY Project 2004/2005
Issue incoming/outgoing material stock
Monthly material stock balancing
Responsible for consumable materials and accessories purchase
Supervise subordinate’s timecard
Syarikat Kejuruteraan Sistematik Sdn Bhd 2001 – 2003 Helper
Project: BSP & BLNG Project 2001/2003
Marker pottering and measures
Perform task metal grinding for project
Assist fitter, welder and supervisor on required task