EDUCATION
Elizabeth Orr
New Orleans, LA 70119
504-***-**** cell ******@*****.***
B.E. Civil and Environmental Engineering (Structural Emphasis), Vanderbilt University, 1990 CAREER EXPERIENCE
Infrastructure Consulting and Engineering (ICE) – 2021 transitioned work to CSRS Charleston, SC CSRS, Inc. – 2021 to 2022 New Orleans, LA
Program Director
Program Lead on 8 FEMA Grant Management programs due to Hurricane’s Laura and Ida, 2021 winter storm and 2016 Baton Rouge flood. Clients include Airports, Cities, School Boards and Hospitals. Total anticipated program amounts currently 125 million plus. Coordination of all site inspections, hiring and implementation of applicant rep construction cost estimation and roof inspections. Reported to client administration, FEMA, and GOHSEP representatives which includes responsibility for all FEMA and GOHSEP database controls. GP Strategies Corporation – 2015 to 2019 Berkeley County, SC Damage Assessment Engineer/Project Manager
County’s Grant Management lead and damage assessor on FEMA recovery program after October 2015 flood on all damaged County bridges, docks, and buildings. Project Management scope added by client to ensure design and construction adhered to federal guidelines; sites ranged from $30,000 to $1,500,000 each, for a total of 20 million. Lead on all subsequent yearly declarations through 2019. Tidal Basin Government Consulting - 2013 to 2014
Technical Specialist Santa Rosa County, FL
One of two employees representing the Applicant on the Recovery program after the 2014 Spring Flood. Concentration on road repairs and rebuilds, including approval of Hazard Mitigation measures for use of limestone sub base in lieu of clay as originally constructed. Public Assistance Consultant New York City, NY
Direct Administration Cost (DAC) lead on NYU Langone Medical Center’s Hurricane Sandy recovery program. Developed DAC template and trained Client and all DAC contractors in its use when recording all internal daily effort per FEMA requirements, helped develop staffing plan for all DAC effort until program end; DAC reimbursement for the Applicant at leave was 35 million dollars. Ericsson (contractor) - 2012 to 2013 New Orleans, LA Construction Manager
Manager responsible for review and approval of all design and construction subcontractor tasks related to 70+ SprintPCS cellular sites in the New Orleans Market. Scope of 4G/Long Term Evolution (LTE) install included replacement of all radio equipment and new antennas, hybrid cable, and tower mounted RRU installations (min. 3 RRUs/sector). Moved to Central Louisiana market to oversee 110+ LTE sites. Stuart Consulting Group - 2011 to 2012 New Orleans, LA Program Manager
Team Lead on all FEMA Grant Management and Hazard Mitigation work in City of Slidell which consisted of over $50 million in Federal funds; development and oversight of all weekly reporting to FEMA/State, and monthly reporting to M a yor a n d City Council Executive Committee. Increased federal funding of Katrina affected infrastructure reimbursements to the City by over $4 million.
Coordinated and reviewed all requests for reimbursement of eligible repair scopes, including all contact with FEMA/State, client, designer, contractor, and third party reviewers to ensure compliance with The Stafford Act. Disaster Recovery Consultants, Inc. - 2011 New Orleans, LA Sr. Public Assistance Consultant
Grant Manager responsible for review of RS means repair estimates, recommendation, and review of any additional tests/studies to determine possible unseen damage due to corrosion, and coordination with the State on version requests for additional eligible scope.
Increased FEMA’s aid to the City by $850,000 for additional repair scope due to corrosion for a recreation and daycare facility. MWH Global (contractor to employee) - 2008 to 2011 New Orleans, LA Sr. Project Manager
Sr. Project Manager for City of New Orleans Katrina Recovery Program. Oversaw the contracting, design, construction, and FEMA reimbursement of 13 sites while supervising 3 Project Managers; site construction costs ranged from 2 million to 18 million dollars.
Local MWH expert on effects of long duration flooding caused by corrosive water on structural building members. Oversaw engineering study on building member corrosion that resulted from the inundation of the city by corrosive water due to the levee failures. This study was instrumental in the resultant increase in federal funding from 6.7 million to 27.2 million dollars (in 2011) on surveyed buildings. Elizabeth Orr Page 2 of 2
Walt Disney Imagineering (contractor) - 2007 to 2008 Anaheim, CA Construction Manager
Field construction manager for 75 million dollar expansion of luxury hotel on resort property which included an underground parking garage, 200 additional luxury hotel rooms, 50 Disney Vacation Club suites, additional pool, and spa.
Acted as liaison between existing hotel property and new construction; implemented daily job calls with hotel owner. Coordinated all utility shutdowns and access for construction, led contact with all designers and inspectors regarding status of jobsite construction.
Responsible for daily job reporting and reviewing daily reports from contractor, all subcontractors, and inspectors. SAC Wireless, Inc. - 2004 to 2007
Program Manager Laguna Hills, CA
Managed San Diego, Central Coast, and Las Vegas markets for SprintPCS/Nextel turnkey consolidation project; supervised 11 employees who aided with this task. Met all 2006 construction goals in each region. Authored training/procedure manual. Construction Manager/Nextel Irvine, CA
Tracked, reported, and resolved all leasing, zoning, and construction issues for 50+ expansion sites in the Los Angeles Market. Was sole employee remaining on project after managerial decision to scale back operations. Valiant Products - 2003 Denver, CO
Project Manager
Responsible for on-time design, purchase, manufacture, and delivery of goods to hospitality industry clients. Supervised 18 renovation projects. Coordinated design, bid, permitting, and pre-construction of relocation of existing furniture manufacturing facility from Salt Lake City, Utah to Denver, Colorado.
Spectrum/Seattle LLC - 2001 to 2002 Seattle, WA
General Manager
Team Lead tasked with overseeing 7 employees who managed SprintPCS’ sites in Washington State. Scope included site feasibility walks, construction drawing reviews, permitting, bid/pre-con walks, supervision and database entry of all site construction milestones.
Subsequent to promotion to GM position, project staff increased the number of sites on air per month by 30 percent on average. SprintPCS - 1997 to 2001
Wireless Implementation Manager Los Angeles, CA
Responsible for all construction milestones in the largest market for SprintPCS with over 700 sites funded and in design or construction phase in Los Angeles, Orange, Ventura, San Bernardino, and Riverside counties. Contracted, hired, and trained four construction Management firms to support this build-out. Supervised 5 SprintPCS employees and 25+ contractors on this program.
Reduced average construction timelines in counties listed above from 60 days to 40 days. Senior Wireless Implementation Engineer Los Angeles, CA
Responsible for all milestones of site development including leasing, zoning, permitting, bidding, and construction. Trained all contractors and 7 Implementation Engineers for transition from Cox to SprintPCS after SprintPCS purchase of Cox cellular. Washington D.C/ Baltimore, MD
Trained all former APC personnel after SprintPCS purchase of APC, as well as new hires, to comply with SprintPCS requirements. Authored Pre-Construction Process and Co-location Drawing and Construction Guidelines for carriers installing on SprintPCS towers. Richmond, VA
Promoted to Sr. Engineer after departure of Implementation Manager 4 months before launch, meeting all project milestones and timelines including initial launch date. Utilized a staff of 9 Implementation personnel to aid with this goal. Wireless Implementation Engineer Richmond, VA
Project engineer responsible for managing the lifecycle of 47 cellular sites through 1-A surveys, FAA assessments, geotechnical investigations, environmental assessments, architectural and engineering design, construction, utility installation, and interconnection. ADDITIONAL INFORMATION
Computer Literacy: Microsoft Office/Project/Access, Primavera P6, Visio Technical, and Adobe Photoshop International: resided/worked in Africa and South America, Intermediate French proficiency, Beginner Spanish proficiency Certifications: Engineer-In-Training (EIT)/1990, OSHA 30-hour safety course/2010, LEED Green Associate course completion Volunteer: Envoy for 1996 Paralympic Committee/Atlanta; team Burkina Faso, Reiki practitioner for VA/2019-20/South Carolina, Peace Corps Water and Sanitation volunteer for Republic of Congo; Africa/1992-1993 References available upon request