ROGER HOWARD
Dadeville Al *****
*********@*****.***
PROFESSIONAL SUMMARY
Hard-working individual who sees a task through to completion. Versatile and skilled in many areas. A self-starter who motivates others to achieve excellence. Able trainer and leader. A dependable individual who is interested in a challenge. WORK HISTORY
CSP TECHNOLOGY
AUBURN Al
2018. Present
Maintenance Technician
Trouble shooting, maintaining and make repairs as needed to keep molding presses and robots are operational electrical, Hydraulics and pneumatic.
NEMAK ALABAMA, Sylacauga, AL 2011 – Present
Maintenance Supervisor
● Managed maintenance PM’s for all equipment in the facility.
● Support production as needed.
PLANTATION PATTERENS, Wadley, AL 2005-2011
Maintenance Manger
● Managed the security of the entire facility.
● Responsible for the building and grounds of the entire facility.
● Responsible for the powder coat system.
● Keep track of time and attendance for 35 employees.
● Scheduled shut schedules for machine overhauls.
REYNLODS MECHANICAL INSTALITION, Alex City, AL 2002-2005 Supervisor
● Installed shipping systems for several different companies all over the United States including Quaker Oats, Kraft Foods, Pepsi, Coca Cola, Amazon.com, AFAES, K-Mart, Mars Incorporated, UPS and Empire Distribution
ROBISON IRON, Alex City, AL 2001-2002
Shop Foreman,
● Installed subway canopies in several companies throughout the United States including, New York and Boston.
● Responsible for the rigging to remove the Vulcan in Birmingham, AL to be taken to Alexander City to be refurbished.
● Installed dividers on teller counters in casinos throughout the United States. RUSSELL CORPORATION, Alex City, AL 1988-2001
Lead Person, Material Handling
● Installed monorail, which increased output of plant by 85-90%.
● Installed A.S.R.S. cranes, which increased storage space by 20%.
● Recycled parts and equipment in order to save company $100,000s.
● Met project goals for time completion 100% of the time.
● Renovated new piece of equipment in order to ensure safety of employees. Changed process of upbender by breaking down turntable and fabricating new parts to enhance safety.
● Designed, laid out and constructed new distribution center without blueprints or directions. Completed in less time than allotted.
● Fabricated take-up for conveyer belt. Ensured on-going production, saved downtime, and saved at least $8,000 in one hour.
● Fully automated distribution center in 2/3 time allotted, thereby starting up production and making thousands of dollars for the company.
● Maintained perfect work record-no reprimands, excellent attendance, and outstanding work ethic.
● Commended by supervisors and crew on many occasions.
● Maintained 100% safety record throughout career.
● Analyzed needs for the job – equipment and materials.
● Purchased supplies and equipment needed.
● Monitored use and return of equipment.
● Set schedules and goals for project.
● Traveled extensively installing equipment.
● Managed project by prioritizing tasks, coordinating with other installers – plumbers, etc., and assuring safety.
● Trained new employees in quality work processes.
● Assisted management in analyzing work performance.
● Complied information needed for employee calendar cards, for each technician, shirt, etc.
TRAINING AND EDUCATION
James Madison High School
Norcross, GA
Opelika Tech
Opelika Al
Calhoun Community college
Decatur Al
GMAW SMAW GTAW
OX/Fuel Cutting Basic Blueprints Weld Symbols
Personal Protective Equipment Measuring Tools Lubrication Seminar English/Metric Systems Proper Installation of Seals Pneumatics Fork Lift Operator License Hydraulics Plumbing/Piping V-belt Installation & Maint. Bearings Install & Maint. Rigging Motor Alignment Reading Mech. Drawings Gearbox Maint. Gear Systems & Maint. Chain Drive Sys. & Maint. Control Values Ergonomics Electrical Safety Seminar Lock-out/ Tag-out Confined Spaces Seminar Constructual Drawings CPR/First Aid OSHA CPR/AED 1st Aid/BBP
Diversity Robotics Training
Industry Occupational Safety & Health Standards