Post Job Free
Sign in

Quality Control Project Manager

Location:
Washington, DC
Posted:
August 03, 2024

Contact this candidate

Resume:

Bob Osterberg

west columbia, sc. *****

**************@*****.***

803-***-****

Superintendent/QC Manager-Four Tribes

April 2021 to Present

Fort Jackson,S.C.

1) Quality Control Reports Daily

2) Plan and layout projects

3) Plan projects with crew

4) Schedule work with sub contractors

5) Write AHA'S and safety procedures

6) Daily RMS reports

7) Order material

8) QC all work daily

9) Train new employees

10) Work with Project manager on progress

11) Payroll

12) SSHO

Electrical Superentendent/QC Manager-IES

Sept. 2019 to April 2021

1) QC daily reports

2) Monthly site meetings

3) Plan and layout daily work

4) Make nessary changes to prints

5) Schedule inspections

6) Underground - transformers- lighting

7) Meter panels and balance loads

8) Site daily reports

9) Material list

10) Electrical Engineer

11) QC electrical, HVAC, fire alarm and data

12) Trouble shoot

13) Run 4 projects at one time

14) SSHO

Electrical Superintendent/QC manager Fordham Electric Jan. 2019 - Aug. 2019

• plan and layout project

• make necessary changes to prints

• schedule subcontractors

• fill out daily reports, send to main office

• make material orders

• SSHO

• check with the installation of electrical, hvac, fire alarm and data

• Quality control

• trouble shoot

• meet with general contractor on changes

Electrical Superintendent/QC Mamager -- I.E.S. March 2018 - Jan. 2019

• plan and layout project

• schedule subcontractors

• schedule SCE&G

• schedule inspections

• payroll, daily reports,

• order material

• Electrical Engineer

• SSHO

• quality control, trouble shoot

• start up hvac units. repair sheet rock.connect hot water tanks, start up heaters. install switch gears, panels, lighting control, fire alarm. Maintance --- Greenbriar units Aug 2017 - March 2018 Quality Conntrol Manager

• maintain units, 23 buildings, 2 pools and laundry buildings

• given work orders through the day, they will contain, plumbing, electrical, hvac, painting, sheetrock, carpet, floor tile, appliances... etc.

• install new air units, run lines, install freon and set thermo stats. repair units if possible.

• repair or replace hot water tanks, water lines. kitchen sinks install and repair. toilet replace or repair.

• repair or replace cabinets. wall trimming repaired or replaced. repair or replace doors, locks...etc

• repair all electrical, panels, fixtures, lights and outlets.

• repair sheetrock, paint

• repair any floors, carpet tile...etc

• repair or replace appliances, frig, ovens, garbage disposals, washers and dryers

• repair or replace data systems at office, reprogram

• maintaine pools, ph, salt, pumps, cleaning

Director of Operations/QC Manager -- Rosemark Commercial Management Services Sept 2015 - Aug 2017

• Manage everything in 68 buildings

• replace or repair all hvac, install new units, install freon, progran controls to motors and system. trouble shoot chillers and reprogram.

• plumbing-- repair or replace all equipment. floor drains repair. bathroom equipment, kitchen plumbing, barracks plumbing.

• electrical-- replace repair all electrical eqipment. panels, motors, fixtures.

• kitchen equipment-- repair or replace mixers, oven, grills, freezers and refer units. ice machines.

• any sheet rock or painting repairs

• masonary repair. brick, concrete

• SSHO

• fire alarm. repair or replace panels, devices. reprogram.

• install new data systems or repair

• anything that pertains to building, had to repair or replace

• follow up with corps of engineers on all repairs

• perform quality control

• QC daily reports

• Meet with Project manager for weekly progresd.

Lead Man -- Intergrated Electric May 2015 - Aug 2015

• install ridged and emt conduit

• istall conveyor belt photo eyes, limit switches

• pull data cables to and istall 500 vfd's. dress up vfd's and plc's. program

• install and program exray machines

• trouble shoot

Supervisor/QC Manager - MSI june 2014 - may 2015

• layout and perform projects

• engineer changes

• install plc's and run data cable.

• daily reports, payroll

• SSHO

• install hvac units, electrical panels, data and low voltage. program.

• connect new chillers and program

Supervisor - Kudzu Feb 2014 - june 2014

• install hvac units, run control cables and program for Johnson controls. install chillers, motors, plc's program. install new hvac controls for water treatment plants and chillers for air force in charleston. install any electrivcal needed for equipment to operate. Berg Electric - Quality Control Manager- Safety Director Oct 2012 - Dec 2013

• install all electrical, fire alarm and data controls, lighting controls and hvac controls. Pumps for plumbing

• perform inspections and prepare for corps of engineers inspections.

• quality control, make sure proper material is used and installed correctly.

• SSHO

• design lighting control and lighting.

• write AHA'S for corps of engineers

Senior Project Manager/QC Manager - I.E.I. Jan 2012 - Nov 2012

• write government submittals

• write aha's for corps of engineers

• do work for army top secret project.

• over see all projects company had

• design new fire alarm ststem for Fort Jackson hospital

• install hvac and program

• SSHO

• corps of engineers pulled me off this project and put me on Berg electric project Superintendent - Lewis Electrical Mar 2011 - Dec 2011

• layout project, electrical, fire alarm, security,and lighting control

• payroll, ordering material, train employees

• SSHO

• design controls 30 vfd's, install and program

Superintendent /QC Manager- Emory Electric Jun 2010 - Mar 2011

• layout out project

• SSHO

• payroll, order material, daily reports

• fire alarm and security systems install and program. lighting control systems installed and programed

• install all electrical systems, panels, transformers Foreman - CLP Nov 2008 - Jun 2010

• install fire alarm systems in 2 new buildings at allen university.

• run conduit, pull circuits, install devices and program

• install and trouble shoot electrical systems, lighting control Project Manager/Superintendent - Fountain Jan 2006 - Feb 2008

• 2 tower 7 floor high end condos with 8 floor parking deck with party deck

• layout complete project, electrical, hvac, plumbing, paiting, wood floors, carpet, fire alarm

• electrical- designed, installed. lighting controls

• SSHO

• install security system and program

• do repairs to hvac, plumbing, sheetrock, floors, appliances, fire alarm. security systems

• payroll, daily reports, p and l reports. safety reports.

• make changes on condos with the request of owners

• Electrical Engineer

• Mr. fountain wanted 10% profit, he received 12%

Associate Degree in Electrical Engineering

Osha 30

Osha Confined Spaces

Corps of Engineers Construction Quality Management For Contractors- Certificate Certified Electrician Diploma

Supervisor Certificate

computer savy



Contact this candidate