Post Job Free
Sign in

Journeyman Electrician Bilingual Spanish

Location:
Wake Forest, NC
Posted:
July 30, 2024

Contact this candidate

Resume:

LEONARDO ALFREDO ALEJO HERRERA CELL PHONE NUM:984-***-****

BILINGUAL SPANISH

** ******* ** *********** ** 27596 E-MAIL:*****************@*****.***

SUMMARY

JOURNEYMAN ELECTRICIAN WITH 14 YEARS OF EXPERIENCE. SKILLED WITH COMMERCIAL AND INDUSTRIAL FIELD INSTALLATION .CREATIVE PROFESSIONAL WITH EXTENSE PROJECT EXPERIENCE FROM RESIDENTIAL,HOSPITALS, RESTAURANTS, COMMERCIAL AND INDUSTTRIAL FIELD AND DATA CENTERS CONCEPT DEVELOPMENT

HIGH LIGHTS

®NATIONAL ELECTRIC CODES ( NEC) ®EFFICIENT

®FIELD INSTALLATION PIPE ALL SIZES AND PANELS ®SUB-PANEL INSTALLATION

®BRANCH CIRCUIT WIRING ®TEST EQUIPMENT OPERATION

KNOWLEDGE UMS,URS, UPMs, MV SWITCH, XFMs,MSBs, ADPs,PUDUs, ATSs,TAP BOXES TO BUSWAY ON HACKS, HACs, UPSs SYSTEMS, BATTERY SYSTEMS AND GENERATORS Conducted commissioning and maintenance of Uninterruptible Power Supply (UPS) systems, ensuring optimal performance and reliability.

Proficiently installed, maintained, and repaired Medium Voltage (MV) Switchgear, Transformers (XFMs), Main Switchboards (MSBs), Automatic Transfer Switches (ATSs), and Power Distribution Units (PDUs).

Performed routine inspections and preventive maintenance on battery systems, including lead-acid and lithium-ion batteries, to guarantee uninterrupted power supply during power outages.

Successfully integrated and tested Tap Boxes to Busway on Racks (Hacks) to support data center equipment power distribution.

Collaborated with engineering teams to develop and execute User Requirement Specifications (URS) and Unit Performance Monitoring (UPM) plans.

Conducted load bank testing on backup generators to validate their readiness for emergency situations.

Ensured compliance with industry standards and safety regulations throughout all electrical maintenance and installation activities.

Troubleshot and resolved electrical issues promptly to minimize downtime and maintain data center operations.

WORK EXPERIENCE

MERIT ELECTRIC INSTRUMENTAL

FEB 2024 – CURRENTLY

DOING ALL THE SEED BIO REACTORS SUPER-SKIDS WORK

BIO REACTORS TUBING

BIO REACTORS CONTROLS

SET UP ALL THE KIND PIPE FOR PULL UP WIRES

CONTROLS PANELS TERMINATION

ELECTRICAL PANELS TERMINATION

DOING THE BIO REACTORS AND SUPER SKIDS CABLE AND BASKET TRAYS

FOLLOW THE BLUE PRINTS FOR SET UP AND TERMINATION OF THE PDP AND VESDA CABINETS

TERMINATION OF THE POWER CONTROL PANELS

FOLLOW THE BLUE PRINTS FOR LIGHTING AND POWER SYSTEMS

480 VAC DISTRIBUTION

120 VAC DISTRIBUTION

24 VDC DISTRIBUTION

SAFETY WIRING

FOLLOW ALL THE SAFETY RULES AND MAKE SURE GET ALL THE PERMITS FROM THE GENERAL CONTRACTOR TO DO SAFETY, PRODUCTION AND QUALITY WORK LINES

JOURNEYMAN ELECTRICIAN 2017 -FEBRUARY 2024

MC DEAN INC

®PREPARE JOBS SITES FOR INSTALLATIONS BY REMOVING OBSTACLES AND DEBRIS

®CONSUL WITH SUPERVISOR TO DETERMINE PREFERENCES AND PLAN LAYOUT

®SIZE, CONFIGURE,LAYOUT,AND INSTALL FEEDERS, WIRES, SWITCHGEARS,AND CONDUITS

®ADHERE TO CODES AND SAFETY REGULATIONSON ALL PROJECTS

WATSON ELECTRIC MECHANIC ELECTRICIAN 01/2010 – 08/2017

® LAID OUT THE CONDUIT AND INSTALLED ELECTRICAL CONDUIT AND WIRING POWER,CONTROLS,AND LIGHTING

®COMPLETED THE PROJECTS IN ACCORDANCE WITH THE NEC

®DOCUMENTED ALL INSTALLATIONS, MAINTENANCE, AND REPAIRS PERFORMED ON EQUIPMENT

®CLEANED WORK SITES, INCLUDING HUALING DEBRIS AND TRASH,CLEANING THE TOOLS, AND STORING EQUIPMENT

®REPORTED ALL THE UNSAFE ACTIVIES,SITUATIONS, AND POTENTIAL HAZARDS TO REPORT AT SUPERVISOR

®READ AND FOLLOWED ELECTRICAL AND MECHANICAL SCHEMATICS, BLUEPRINTS, AND DIAGRAMS

DO THE READING ON THE GENERATORS AND UPS SYSTEMS WITH THE METER CAT V BY TESTING BATTERIES ROOM MAKE SURE THE VOLTAGE READING ON THE DISPLAY 0 VOLTS

CHECKING THE BLUEPRINTS WITH THE SUPERVISOR FOR TO DO THE CONTROL CABLES AND TERMINATIONS FOR UPS SYSTEMS WITH THE MAIN SERVICES BORDER PANEL [MSBS]

DO THE TERMINATIONS FOR POWER DISTRIBUTION UNIT [PDU]

VERIFY THE PRODUCTION WEKKLY STATUS WITH THE SUPERVISOR

MAINTAIN ORDER INTEGRITY WTH ALL THE DEPARMENTS

PERFOM WEEKLY JOBSITE INSPETIONS REPORTS

DO THE LAID OUT OF THE LIGHTING SYTEMS ACCORDING TO THE BLUEPRINTS LIKE PIPE ALL SIZE AND ALL TYPE LIKE EMT,RIGID, MCT, MCD, ETC

SKILLS

UNDERSTENDING NEC PRO EFFCIENT

LAID OUT TUBING

UNDER GROUND JOBSITES

PULL WIRES

PANELS TERMINATIONS

GENERATORS TERMINATIONS

TRANSFORMERS TERMINATIONS

UPS CONTROL WIRES TERMINATIONS

POWER SYSTEMS

BRANCH CIRCUITS

EXCEL [2 YEARS]

BLUEPRINT READING [ 10 YEARS]

DOCUMENT CONTROL [ 5 YEARS]

PRODUCTION MANAGEMENT [5 YEARS]

PROCESS IMPROVEMENT [7 YEARS]

TROUBLESHOOTING [8 YEARS]

SUPERVISING EXPERIENCE [20 YEARS]

BASIC MATH

FORLIFT

LENGUAGES

SPANISH FLUENT

ENGLISH FLUENT

EDUCATION

UNIVERSIDAD AUTONOMA DE MEXICO 2002 UNAM INGENIERIA ELECTROMECANICA

TECNOLOGICO DE TEHUACAN 1997 INGENIERIA INDUSTRIAL

C.B.T.I.S 229 PUEBLA MEXICO [ BACHILLERATO ] 1994

CERTIFICATIONS

OSHA 10 HEALTH AND SAFETY PRECAUTIONS AND PRACTICES FOR GENERAL INDUSTRIAL

SCISSOR AND FORLIFT CERTIFICATION

SUPERVISORY SKILLS : MOTIVATING AND ASSESSING PARTNERS PROFICENT

MOTIVATING OTHERS TO ACHIEVE OBJECTIVES AND IDENTIFYNG IMPROVEMENTS OR CORRECTIVE ACTIONS

WORK STYLE : RELIABILITY – PROFICIENT

TENDENCY TO BE RELIABLE, DEPENDABLE, AND ACT WITH INTEGRITY AT WORK

ADDITIONAL INFORMATION

I HAVE GREAT TROUBLE SHOOTING AND RESOLUTION ABILITIES . I ENJOY INVESTIGATING AND GETTING TO THE ROOT CAUSE OF THE PROBLEMS



Contact this candidate