CURRICULAM VITAE
QUAMAR AZAM
Email Id:**************@*****.***
Mob No: +919*********,+917********* India
Current location: INDIA
Position: PLANT INSPECTOR-API /INSPECTION ENGINEER Experience: 08 YEARS (6 Years india & 2Years gulf) OBJECTIVE:-
As anINSPECTION ENGINEER/PLANT INSPECTOR-APIwouldlike to take up a challenging assignment such that it will prove my skills.
Certified API-510, Pressure vessel inspector
• ASNT LEVEL-II (RT, UT, MT, PT,VT & RFTI)
WORK EXPERIENCE:-
• ORGANIZATION:ICS PVT LTD
CLIENT: IOCL ASSAM
• ORGANIZATION: SAUDI K-KEM - SAUDI ARABIA
CLIENT: PETROKEMYA
POSITION: NDT-INSPECTOR- (MEGA SHUTDOWN)
DURATION: JANUARY-2023 TO OCT-2023
ORGANIZATION: ICS PVT LTD INDIA
CLINT:IOCL PANIPAT INDIA
POSITION:API INSPECTOR
DURATION:20 OCT 2023 TO 15 MAY 2024
EDUCATION QUALIFICATION:-
TECHNICAL QUALIFICATION & CERTIFICATION:-
Degree in B.tech in mechanical engineering
POSITION: QC INSPECTOR
(SHUTDOWN INSPECTION)
DURATION: NOV-2022 TO DEC-2022
• ORGANIZATION: SMART TECHNOCRSTS & CONSULTANCY SERVICE CLIENT: BPCL (MUMBAI) INDIA
POSITION: Inspection Engineer/ QC Inspector
DURATION: JUN-2022 to AUG-2022
• ORGANIZATION: ICS PVT LDT
CLIENT: ONGC UDAN ( MUMBAI) INDIA
POSITION: Inspection Engineer/ QC Inspector
DURATION: APRIL-2022 to MAY-2022
• ORGANIZATION: PRETECT
CLIENT: QATAR ENERGY
POSITION: Inspection Engineer/ QC Inspector
DURATION: DEC-2021 to FEB-2022
• ORGANIZATION: GQCCO
CLIENT: SAUDI ARABIA
POSITION: Inspection Engineer/ QC Inspector
DURATION: FEB-2020 to APRIL-2020
• ORGANIZATION: TUV -SUD
CLIENT: GIGL (GUJARAT) INDIA
POSITION: QC Inspector
DURATION: JUNE-2019 to AUG-2019
• ORGANIZATION: SMART TECHNOCRATS & CONSULTANCY
CLIENT: MRPL (MANGALORE) INDIA
POSITION: NDT INSPECTOR
DURATION: AUT-2017 to JUNE-2019
SKILLS, ROLES &RESPONSIBILITY’S :-
Ability to show initiative and make independent decision.
Familiar with stage wise inspection of pipes, column, heat exchanger & pressure vessel as per API standards.
• Prepare and review of inspection test plan and any procedure related with QA/QC for new construction code.
Familiar with international codes & standards with respect to plant inspection and QA/QC for welding, pressure testing and NDT activity.
•Coordinating with NDT-TECHNICIAN.
•Ensuring stage wise inspection as per ITP.
Evaluating TML measurement and verifying remaining life calculation by validating short- & long-termcorrosionrates.
Preparation of progress report & inspection documents.
Periodic inspection carried out of piping & statics equipment (CUI-inspection, piping, pressure vessels external inspection).
Arrange NDT-test to meet requirement of refinery standards.
Review of P&ID and arrange Isometric for piping assessment through various means to meet API 570 requirement.
• Familiar with P&ID and Isometric drawings.
• Prepare fit-up, weld visual and RT report for piping related activities as QC engineer.
Prepare a checklist and implement weekly and monthly schedules of manpower, materials, and equipment.
Ensure the compliance of safety procedures according to the company and industry standards.
• ORGANIZATION: L&T(I)PVT.LTD
CLIENT: IOCL HAZIRA GUJARAT,INDIA
POSITION: SUPERVISOR
DURATION: AUG-2014 to JULY-2017
Decision making and proper planning.
Supervise the maintenance and inspection of piping & welding.
work in a safe and healthy environment.
PIPING SKILL:
•Good knowledge of isometric drawing and P&ID.
•Requesting material as per isometric drawing.
•Preparation of fabrication work.
•Making DPR and submitting it to the management.
WELDING SKILL:
•Good knowledge about MIG, TIG, SMAW.
•Visual inspection of welded joint assembly as per approved procedure codes.
•Pipe fit-up dimensional Inspection such as bevelangle, root
•During welding Inspection such as weather condition,travel speed, gas flow rate, current voltage,
Preheating.
•Coordinate to pwht of weld monitoring the heatingrate, socking time for cooling rate during heat
Treatment.
HYDROTEST OF PIPING AND EQUIPMENT:
•For stainless steel use DM water& for cs/as pipinguse utility water.
•PG range 1.5 to 4 times of test pressure & pressureshould be 30 min hold.
•Minimum two PG should be used during test & shouldbe calibrated.
•The increase in pressure should be gradually &tobe done by approved procedure.
•HT Procedure for air cleaning water filling, air remove, waterpressurefilling, holding period, Inspection period, DP the water slowly vent through dewatering and air blasting. COMPUTER SKILL:
•Microsoft office, MS-EXCELL
•Meredeum & TML
FAMILIAR CODES AND STANDARDS :-
ASME SEC-V, SEC-VIII
WELDING QUALIFICATION: ASME SEC-IX
API-510, API-571, API-578,
• POST CONSTRUCTION CODE: ASME PCC-2
PERSONAL PROFILE :-
Name – QUAMARAZAM
Father Name – ZAKIR HUSSAIN
DOB – 26.03.1993
Gender – Male
Nationality - INDIA
Marital Status – Married
Language – Hindi, English, Urdu,
Passport No. – N1645108 (Expiry Date – 26.07.2025) DECLARATION :-
I here by declare that the above furnished particulars are true to the best of my knowledge and belief.
QUAMAR AZAM
PLACE:BIHAR
DATE:23/07/2024
verifies that
QUAMAR AZAM
HAS MET THE ESTABLISHED AND PUBLISHED REQUIREMENTS FOR API CERTIFICATION AS AN API 510 PRESSURE VESSEL INSPECTOR
IN ACCORDANCE WITH THE KNOWLEDGE DEFINED IN THE API Standard 510 CERTIFICATION NUMBER 114572
ORIGINAL CERTIFICATION DATE November 30, 2023
CURRENT CERTIFICATION DATE November 30, 2023
EXPIRATION DATE November 30, 2026
Director, Individual Certification Programs