Mohamed Hassan Saad Abdulrahman
(Helwan) ** Mansour Street, Helwan, Cairo / (Saudi Arabia) 29 Hira Street, El Nahdha, Jeddah
+2-011******** +966-********* ***********@*****.***
+2-010******** +966-********* ***.**.********@*****.***
Senior Planner and Cost Control Engineer
Career objective:
Seeking a fulltime job in a reputable leading organization where my skills and knowledge will be utilized, developed and shared in organization's progress.
Education:
• Prepare for PMI-SP “Project Scheduling Professional” Certificate.
• Prepare for MBA “Master Business Administration” in The Arab Academy for Science, Technology and Maritime Transport-Sheraton-Cairo “2023- 2025”
• Certified PMI-RMP “Risk Management Professional” from date 12 Mar. 2022 to 11 Mar. 2028
“RMI-RMP Number:3225652”
• Certified PMP “Project Management Professional” from date 29 Dec 2021 to 29 Dec 2027
“PMP Number:3200747”
• Prepared for PRMG in American university in Cairo (AUC) July2017 - Dec2018
- PRMG 090 Certified Cost Professional (CCP) - PRMG 010 Project Planning and Control Techniques
- PRMG 095 Risk Management - PRMG 080 Projects Bids and Contracts
- PRMG 020 Management of Project Resources - PRMG 030 Project Budgeting and Financial Control
• member in Egyptian Engineers Syndicate, Saudi Council of Engineers and Project Management Institute “PMI”.
• Get Score in TOEFL "500".
• The Arab Academy for Science, Technology and Maritime Transport-Sheraton-Cairo-July 2014 “2009- 2014” Bachelor Construction and building engineer.
Grade: Excellent “with honor” “90.5” "A" GPA: 3.62 Graduation Project: Design of Reinforced Concrete
Graduation Project Grade: Excellent "supervised by Prof.Dr.Mashhour Ghoneim" Working Experience
• Saudi Motorsport Company – SMC Sep. 2023 -Until Now Position: -
Office for Senior Planner Engineer.
Projects: -
“Formula 1” Race 4 in “Jeddah-Saudi Arabia”
Responsibilities: -
- Creates, maintains, and managers are preconstruction/ design schedule for Project.
- Prepare Criteria for Selecting Contractors and subcontractors.
- Review & following up the project contract.
- Review & following up project construction Start up.
- Review & approved the project TBL.
- Review & approved the project cash flow.
- Review & approved the project Drawing & material list.
- Review & approved the project monthly payment.
- Supervise and review the preparations of construction method statements with contractors and technical office personnel.
- Monitoring all project activities throw its live cycle starting from technical & engineering works passing.
- Throw procurement & construction, maintaining, quality and cost control reaching to projects close out & handing over within planned schedules.
- Prepare estimates presentations, special studies, budget control reports and estimating documents for project and client’s presentations.
- Participate in monitoring and reporting certificate of completion (COC) by receiving invoices from vendor with supported documents and reporting to line manager.
• United Maintenance and Contracting Company -UNIMAC Sep. 2022 -Sep 2023 Position: -
Office for Senior Planner, Follow-Up and Cost Control Engineer. Projects: -
Planning and Scheduling for the project program and follow up for contractor UNIMAC Construction Company in
“Formula 1” Race 3 in “Jeddah-Saudi Arabia” planning, follow up and Cost Control the project “Consultant: TELKI” for:
- Racetrack pavement
- Parking places.
- construction of all Infrastructure types (electrical cables, Sewage, drainage by all different types, ground tanks and storm lines).
- Lighting of track and house connection for the other Buildings “Sub-Stations, BMSs, L.V & M.V Stations and Cables” Responsibilities: -
• Preparing for daily Kick-off meeting delay in time and even display daily Task and Problem that everyone has a problem or not.
• Prepar “E.O.T” for the issues and the time Problem and negotiate it with Consultant “TELKI” and Client “SMC”
• Prepare weekly report to Consultant “TELKI” and Client “SMC”
• Preparing site reports and filling in other paperwork day by day.
• Communicate with Subcontractors and Other Contractors to solve some problems in site and delay tasks.
• Participate in Preparing KPIs and for other the Project manager.
• Display the cash flow to the Project Manager and Show him the Deviation in Cost and Time of the project.
• Prepar Claims for delay in time for subcontractors and Suppliers and the other Contractors affecting us.
• Hassan Allam Technology Company – “HAT” “Kortech” Jan. 2022 – Sep 2022 Position: -
Office for Senior Planner Engineer.
Projects: -
Planning and Scheduling for the project program and follow up for contractor HAT in two projects “H9 hotel and Village A” in ‘Egypt -Marassi north cost “:
- infrastructure for Landscape
- Parking places for hotel.
- Pool bar and fountains for Hotel H9.
- construction of all Infrastructure types (electrical cables, Sewage, drainage by all different types, ground tanks and storm lines) in Village A and H9 Hotel in Marassi Project. Responsibilities: -
• Preparing Engineers for daily Kick-off meeting delay in time and even display daily Task and Problem that everyone has a problem or not.
• Prepar “E.O.T” for the issues and the time Problem and negotiate it with Consultant “ECG” and Client “Emaar Masr”
• Prepare Monthly and weekly report to the main JV “Hassan allam Construction-HAC “ & “CCC”
• Preparing site reports and filling in other paperwork day by day.
• Communicate with Subcontractors, Other Contractors and suppliers to solve some problems in site and delay tasks.
• Participate in Preparing KPIs and for other the Project manager.
• Display the cash flow to the Project Manager and Show him the Deviation in Cost and Time of the project.
• Prepar Claims for delay in time for subcontractors, Suppliers in MEP and the main contractor in Civil work.
• United Maintenance and Contracting Company -UNIMAC Aug. 2021 -Dec. 2021 Position: -
Office for Senior Planner, Follow-Up and Cost Control Engineer. Projects: -
Planning and Scheduling for the project program and follow up for contractor UNIMAC Construction Company in
“Formula 1” in “Jeddah-Saudi Arabia” planning, follow up and Cost Control the project “Consultant: TELKI” for:
- Racetrack pavement
- Parking places and fane zones.
- Lagoon lake development.
- construction of all Infrastructure types (electrical cables, Sewage, drainage by all different types, ground tanks and storm lines).
- Lighting of track and house connection for the other Buildings “Sub-Stations, BMSs, L.V & M.V Stations and Cables” Responsibilities: -
• Preparing for daily Kick-off meeting delay in time and even display daily Task and Problem that everyone has a problem or not.
• Prepar “E.O.T” for the issues and the time Problem and negotiate it with Consultant “TELKI” and Client “SAMF”
• Prepare Monthly and weekly report to Consultant “TELKI” and Client “SAMF”
• Preparing site reports and filling in other paperwork day by day.
• Communicate with Subcontractors and Other Contractors to solve some problems in site and delay tasks.
• Participate in Preparing KPIs and for other the Project manager.
• Display the cash flow to the Project Manager and Show him the Deviation in Cost and Time of the project.
• Prepar Claims for delay in time for subcontractors and Suppliers.
• El-Behairy Consulting Engineering – BCE. Nov. 2017 – Aug. 2021 Position:
Office for Senior Planner and Cost Control.
Projects:
- Planning and Scheduling for National Bank of Egypt project program and follow up for contractor genies in “Borg El- Arab” in “Alexandria.”
- Planning and Scheduling for program and follow up for Elfaid and El-masria contractor Garbkana development project in “Ezbet Kairala” in “old Cairo” which speared to two parts urban area and landscape and road to the historical place.
- Planning and Scheduling revision for projects, tracking project from site, updating for projects Participate in check approval of planning & Scheduling in Green Halls Compound “Nasr City” Contractors: Arab Contractors “Main Contractor”, Rowad, Amr Abdallah, Amr Azab Misr Contraco,terraz and Shehabco.
- Planning and Scheduling preparing program and follow up for contractor genies for El-Sadat Factory project in“Sadat City” in “El Monfia”
Responsibilities: -
• Prepar “E.O.T” for the issues and the time Problem and negotiate it with Client and Contractors.
• Prepare Monthly and weekly report to the Project manager and Clients.
• Preparing site reports and filling in other paperwork.
• Communicate With Contractors or project manager to solve some problems in site and delay tasks.
• Participate in Preparing KPIs and for other the Project manager.
• Display the cash flow to the Project Manager and Show him the Deviation in Cost and Time of the project. Prepar Claims for delay in time for subcontractors and Contractor.
• Alexandria Construction Company -ACC Jun. 2016 – Nov. 2017 Position:
Site, office for Planner Engineer.
Planning and Scheduling for projects, tracking project from site, updating for projects, making reports for the late works. Participate Madinaty malls and its landscape for finishing, electromechanical, plumbing & infrastructure: Projects:
Mall Landscape: Consultant: ECG "Engineer Consultant Group" Budget cost: 157,208,119 L.E. Mall E Consultant: ECG "Engineer Consultant Group" Budget cost: 102,233,378 L.E Mall F Consultant: ECG "Engineer Consultant Group" Budget cost: 230,499,666 L. E Mall G Consultant: ECG "Engineer Consultant Group" Budget cost: 28,016,726 L. E Mall H Consultant: ECG "Engineer Consultant Group" Budget cost: 23,923,627 L. E Mall D Consultant: ECG "Engineer Consultant Group" Budget cost: 71,655,122 L. E Mall C Consultant: ECG "Engineer Consultant Group" Budget cost: 67,959,270 L. E Mall B Consultant: ECG "Engineer Consultant Group" Budget cost: 38,340,171 L. E Responsibilities: -
• Preparing for daily Kick-off meeting delay in time and even display daily Task and Problem that everyone has a problem or not.
• Prepar “E.O.T” for the issues and the time Problem and negotiate it with Consultant “ECG” and Client “Alexandria Urban Projects”
• Prepare Monthly and weekly report to Consultant “ECG” and Client “Alexandria Urban Projects.”
• Preparing site reports and filling in other paperwork day by day.
• Communicate With Subcontractors and Other Contractors to solve some problems in site and delay tasks.
• Participate in Preparing KPIs and for other the Project manager.
• Display the cash flow to the Project Manager and Show him the Deviation in Cost and Time of the project.
• Prepar Claims for delay in time for subcontractors and Suppliers.
• El Arabia Company for designs. April 2016 – May 2016 Office as designer engineer, Shop drawing & Quantity Surveying: Projects:
Summer Training
- Alexandria Construction Company July 2013 – July 2013 El-Rehab City for construction & all types Finishing.
- Alexandria Construction Company July 2012 – July 2012 Madinaty City for construction roads and infrastructure.
- Saud Consult Office July 2010 – Sep 2010
Development of King Abdullah bin Abdul Aziz Road in Riyadh, Saudi Arabia project for Reinforced Concrete for bridges, tunnels, highways & Infrastructure for rainfalls & lighting of roads. Courses
- PMI-SP Preparation Course Dec. 2022 – Until Now
Attended with Eng. Salah Mohsen “PM Tricks”
- RMP Preparation Course Feb. 2022 – March 2022
Attended with Eng. Salah Mohsen “PM Tricks”
- PMP Preparation Course Aug. 2021 – Oct. 2021
Attended with Dr. Bahaa El shal “Apm Academy
- Revit Structure Jan. 2017 – Feb. 2017
Essential level in El-Muttaheda group "Approved from Autodesk" by 30 hours.
- Short-term Planning Jan. 2017 – Jan. 2017
Association Engineering.
- Risk analysis Jan. 2017 – Jan. 2017
Association Engineering.
- SAP 2000 June 2013 – July 2013
Computer Engineering Labs in Cairo University.
- Communication Skills May 2009 – May 2009
El-Aber Secondary School in Riyadh – Saudi Arabia
Language Skills
Arabic (Native) English (Very good) French (moderate) Computer Skills
Primavera P6 (Excellent) Microsoft Office (Excellent) Microsoft project (Excellent) Revit Structure (Very good) Auto CAD “2D+3D” (Excellent) Auto CAD Structure detailing (Excellent) Sap 2000 (Excellent) Etabs (Excellent) Safe (Excellent) PROKEN (Very good) CSI column (Excellent) SP Column (Excellent) CSI bridge (Very good) RM bridge (Very good) Nano CAD (Excellent) Civil 3D (Excellent) Robot Structure (Excellent) Staad Pro (Very good) Personal Skills Personal Information
• Ability to work under stress.
• Ability to analyze and solve problem.
• Broad-mindedness, assertiveness and amiability.
• Vigor, cooperativeness and dedication.
Date of birth: 24Th of Jan. 1993
Place of Birth: Cairo, Egypt
Nationality: Egyptian
Marital status: Completed (Oct 2014 – Nov 2015)
• For factory in bani-Swaif. • Steel Factory.
• Pump room of lakes in New Capital City. • Tabark towers in Tabark City.