Curriculum Vitae
PERSONAL INFORMATIONS
Name: TALBI
Surname: Khaled
Date & place of birth: 03/10/1985 at Tataouine
Civil Status: Single
Nationality: Tunisian
Address: **** ***** *********** ****rassen Tataouine Tel: +216-**-***-***
Mail: ************@*****.***
DIPLOMA OF THE TECHNOLOGICAL STUDIES SPECIALTY HIGH-LEVEL TECHNICIAN IN ELECTROMECHANICAL.
FORMATION & DIPLOME
o February 2008 : Diploma of High level Technician in electromechanical o From2005 to 2008 : High institute of technological studies in Nabeul o From 2004 to 2005 : Baccalaureate certificate
PROFESSIONAL EXPERIENCE
o From 15 January 2022 to 01 December 2022 : Quality Inspector assigned at EPPM o From 10 December 2018 to 01 April 2019 : QA/QC Supervisor assigned at RETEL o From 10 December 2015 to 05 December 2018 : Quality Supervisor assigned at TCC ( Top Construction Company)
o From 02 January 2012 to 01 December 2015 : welding Inspector assigned to department of control and inspection welding CIS in TIC (Technical’s of Inspection and Control) TRAINING COURSES
o Welding inspector CWI according to AWS ensured by MODDY INTERNATIONNAL o CSWIP Welding Inspection Course ensured by par TWI o Bgas-CSWIP Painting Inspection grade 3/2 ensured by TWI o Visual control of welds according to EN 970 ensured by Cap Bon Training o Radioprotection in industry ensured by CNRP
o Radiographic, Thickness Measurement, Magnetic and Dye penetrant ensured by CMEM o General First Aid by Cap Bon Training ensured by CMEM o Holiday detector ensured by TIC
o Positive materiel identification PMI ensured by TIC o ferrite rate measurement ensured by TIC
o Hardness Measurement ensured by TIC
o Vacuum Box ensured by TIC
CERTIFICATS
Certificate CAWI welding inspector by American Welding Society AWSN 13101154
Certificate SNT-TC-1A Radiographic Testing RT level II N 12/BO/MMA/mp/0066-SNT
Certificate SNT-TC-1A Dye penetrant DP level II N 12/BO/MMA/mp/0065-SNT
Certificate SNT-TC-1A Magnetic Testing MT level II N 12/BO/MMA/mp/0064-SNT
Certificate SNT-TC-1A Thickness Measurement by ultrasonic testing UT level II N 12/BO/MMA/mp/0157-SNT
MISSION PERFORMED
Witnessed and qualification of welders & welding operators according to (ASME IX, EN ISO 9606-1, API 1104& AWS D1.1….)
Witnessed and qualification of PQR according to (ASME IX, EN15614-1, API1104 & AWS D1.1)
QA/QC during welding construction works according to (ASME IV, B31.1& B31.3…)
Witness of mechanical tests (Tensile test, bend test, impact test…)
Assistance for PWHT
Inspection of pressure vessels, piping & atmospheric storage tanks according to (API 653, API 653, API 1104, CODAP 2005…)
Witness of the cleaning and painting works (Verification of the climatic condition and Check the thicknesses of each coat and verify that satisfy the specification requirements)
Galvanizing control (structural steel, bolted tanks, structure ...) according to the standards (ASTM 123, ASTM 780. EN ISO 1461 ...)
Control by Positive materiel identification PMI according to (ASTM A 312, A 335…)
Assistance of Leak test
Hardness measurement
Control by Holiday detector
Determination of ferrite rate
Thickness measurement
MISSION
o EPPM
Project : TATAOUINE Branch line
Mean Project : Quality Inspector
Site : Tataouine
Period: from 15/01/2022 to 01/12/ 2022
Tasks:
Follow up of Civil Works (Excavation, Concrete Works, Buildings ...)
Visual inspection
o RETEL
Project : TATAOUINE Branch line
Mean Project : QA/QC
Site : Tataouine
Period: from 10/12/2018 to 01/04/ 2019
Tasks:
Follow up of welding Activity
Follow up of coating Activity
Site QC coordination
Filling of pipeline tally book
Films interpretation and reception with third party and Client
Stringing,trenching,Bending, Lowering and Backfilling Inspection o TCC
Project : NAWARA Project
Mean Project: Quality Supervisor
Site: Tataouine
Period: from 10/12/2015 to 05/12/2018
Tasks:
Responsible for Solve all difficulty during the welding operation
Visual inspection
Dimensionnel control.
Painting inspection
o Client : ABB
Project: NAWARA Project
Period: from 10/09/2015 to 01/12/2018
Mean Project: Quality Supervisor
Site: Grombalia
Tasks:
Third party for galvanization structure
o Client : STIR
Period: from 04/08/2015 to 03/09/2015
Site: Bizerte
Tasks:
Welder’s performance qualification.
Visual inspection of Storage tanks according to API 650& API 653
Supervision of repairs of tank
o Client : DELTA C&M
Period: from 01/07/2015 to 03/07/2015
Mean Project: Welding Inspector
Site: EL Alia
Tasks:
Welder’s performance qualification.
o Client : ALTRAD CEDRIA
Period: 04/05/2015 & 04/06/2015
Site: Bourj Cedria
Tasks:
Wetness of Procedure Qualification Record
Witnessed of Welder’s performance qualification. o Client : MEDCO
Period: from 06/03/2015 to 16/03/2015
Site: Bir Ben Tartar
Tasks:
Pipe reception
Visual inspection
Dimensional control.
o Client: WINSTAR TUNISIA
Site: Sabria, El Borma
Tasks:
Visual inspection of Storage tanks according to API 650& API 653
Control by PMI (Positive Material Identification)
Control by hardness measurement
Control by vacuum box
Holiday detector inspection.
Thickness measurement
o Client : RASLANOUF OIL & GASPROCESSING CO. INC
Period: from 06/06/2014 to 08/08/2014; from 19/10/2014 to 23/12/2014 Mean Project: Welding Inspector
Site: Tripoli
Tasks :
Supervision of pipeline 10’’ construction 2 Kms, API 5L –X52
Verification and approval of all specifications relative to pipeline 10’’.
Approval of procedure qualification record (PQR) and welding procedure specification (WPS) according to API 1104 and RASCO specification
Check weld and welder numbering
Monitoring the coating of pipeline 10’’after welding and supervising the control activities of weld by holiday detector.
General specification for cathodic Protection Installation
Hydraulic Testing Specifications
Checking the suitability of material used and all certificates before and during the hydro-test.
Monitoring and supervision of the hydro tests and all related safety activities
Check all material used during the operation of hydrotest o Client : CERI
Project: Sousse Project Combined Cycle Gas Power Plant (sousse D) Period: from 27/05/2014 to 03/07/2014 & from 24/08/2014 to 04/09/2014 & from04/04/2015 to 04/05/2015
Mean Project: QA/QC Inspector
Site: Sousse
Tasks:
Visual inspection of welding
Check weld and welder numbering. Ensure joint is thermal wrapped.
Inspect and record pre-welding operation.
Inspect and control of inter-pass by dye penetrant
Review and approve WPS and supporting PQR and repair welding o Client: POWER ALSTOM
Project: GHANNOUCH Project combined cycle Gas power plant Site: Gabes
Tasks:
Control by PMI (Positive Material Identification)
Welder’s performance qualification (WPQ).
o Client : Assistance Engineering et Construction
Period: from 06 to 09/03/2014
Site: El Borma
Tasks:
Control by Vacuum Box
Control by PMI (Positive Material Identification)
Ferrite rate measurement
o Client : BOUCHAMAOUI INDUSTRIE
Project: Project center of GPL storage and filling Period : from 30/01/2013 to 18/02/2013 & from 07/04/2013 to 12/05/2013 & from 02 to 22/12/2013 &from 16/02/2014 to 17/03/2014& from 28/04/2014 to 08/05/2014 Site: Gabes
Tasks:
Assist witness coupon of 06 spheres according CODAP 2005
Wetness of Procedure Qualification Record
Witness of mechanical tests
Thickness measurement
Hardness testing
o Client : MEDITERRANEAN INDUSTRIAL GROUP
Period: 08/02/2014
Site: Bouargoub
Tasks:
Wetness of mechanical testing
Wetness of Procedure Qualification Record
o Client : CMI ENERGY HRS
Project: Sousse Project Combined Cycle Gas Power Plant (sousse D) Period: from 02/01/2014 to 05/02/2014
Mean Project: QA/QC
Site: Sousse
Tasks:
Check structure galvanized
Verification and approval of specifications relative to reparation
Supervisor for all reparation
Wall Thickness measurement for galvanized layers o Client : ETELEC
Project: Sousse Project Combined Cycle Gas Power Plant (sousse C) Period: 27/08/2013 and 01/11/2013
Mean Project: Painting Inspector
Site: Sousse
Tasks:
Control of paint to according customer specification.
- Control of surface roughness
- Measurement of ambient temperature as well as support
- Checking the dew point
Control thickness of different layers of painting
Preparation of P.V control paint
o Client : TOTAL TUNISIE
Project: Witness to hydraulic tests in various stations of TOTAL Period: from 02 to 09/07/2013 & 20 to 22/01/2015
Site: Sbikha /El manzah 1
Tasks:
Control Dye penetration
Visual inspection of welding
Review and approve WPS and supporting PQR and repair welding o Client : STIR
Period: 29/06/2013 & 04/08/2015 to 07/08/2015
Site: Bizerte
Tasks:
Welder’s performance qualification (WPQ).
Wetness of Procedure Qualification Record
Holiday detector inspection of coated layers of polyethylene. o Client : NASR CONTRACTORS
Period: from 18/05/2013 to 12/06/2013
Site: Bizerte
Tasks:
Welding supervisor
Welder’s performance qualification (WPQ).
o Client : GROUP CHIMIQUE TUNISIA
Period: from 13 to 20/04/2013 and from 06 to 10/05/2013 and from 08 to 14/09/2013 Site: Gabes
Tasks:
Welding supervisor (Supervision of repairs of a sulfuric acid tank)
Control by LFET on the tank bottom
Control by PMI (Positive Material Identification)
Hardness testing
o Client: SNC LAVALIN Construction Inc.
Project: Sousse Project Combined Cycle Gas Power Plant (sousse C) Period: from 04 to 06/03/2013 and from 17 to 26/06/2013 and from 21/10/2013 to 27/11/2013 Site: Sousse
Tasks:
Welder’s performance qualification (WPQ).
Control by PMI (Positive Material Identification) o Client : HALWANI
Period: From 03/12/2012 to 31/12/2012 & from 13/01/2013 to 06/02/2013 Site: Dkhila
Tasks:
Control of paint to according customer specification.
Control thickness of different layers of painting
Preparation of P.V control paint
o Client: VIVO ENERGY
Period: From 28/09/2012 to 10/11/2012
Site: Rades
Tasks:
Painting inspector
Wetness of surface treatment and painting inspection
Control by Vacuum Box
Thickness measurement
LANGUAGES
Arabic (Mother Tongue)
French (Very Good)
English (Good Aptitude)