Post Job Free
Sign in

Level Ii Welding Inspector

Location:
Tataouine Governorate, Tunisia
Posted:
August 16, 2024

Contact this candidate

Resume:

Curriculum Vitae

PERSONAL INFORMATIONS

Name: TALBI

Surname: Khaled

Date & place of birth: 03/10/1985 at Tataouine

Civil Status: Single

Nationality: Tunisian

Address: **** ***** *********** ****rassen Tataouine Tel: +216-**-***-***

Mail: ************@*****.***

DIPLOMA OF THE TECHNOLOGICAL STUDIES SPECIALTY HIGH-LEVEL TECHNICIAN IN ELECTROMECHANICAL.

FORMATION & DIPLOME

o February 2008 : Diploma of High level Technician in electromechanical o From2005 to 2008 : High institute of technological studies in Nabeul o From 2004 to 2005 : Baccalaureate certificate

PROFESSIONAL EXPERIENCE

o From 15 January 2022 to 01 December 2022 : Quality Inspector assigned at EPPM o From 10 December 2018 to 01 April 2019 : QA/QC Supervisor assigned at RETEL o From 10 December 2015 to 05 December 2018 : Quality Supervisor assigned at TCC ( Top Construction Company)

o From 02 January 2012 to 01 December 2015 : welding Inspector assigned to department of control and inspection welding CIS in TIC (Technical’s of Inspection and Control) TRAINING COURSES

o Welding inspector CWI according to AWS ensured by MODDY INTERNATIONNAL o CSWIP Welding Inspection Course ensured by par TWI o Bgas-CSWIP Painting Inspection grade 3/2 ensured by TWI o Visual control of welds according to EN 970 ensured by Cap Bon Training o Radioprotection in industry ensured by CNRP

o Radiographic, Thickness Measurement, Magnetic and Dye penetrant ensured by CMEM o General First Aid by Cap Bon Training ensured by CMEM o Holiday detector ensured by TIC

o Positive materiel identification PMI ensured by TIC o ferrite rate measurement ensured by TIC

o Hardness Measurement ensured by TIC

o Vacuum Box ensured by TIC

CERTIFICATS

Certificate CAWI welding inspector by American Welding Society AWSN 13101154

Certificate SNT-TC-1A Radiographic Testing RT level II N 12/BO/MMA/mp/0066-SNT

Certificate SNT-TC-1A Dye penetrant DP level II N 12/BO/MMA/mp/0065-SNT

Certificate SNT-TC-1A Magnetic Testing MT level II N 12/BO/MMA/mp/0064-SNT

Certificate SNT-TC-1A Thickness Measurement by ultrasonic testing UT level II N 12/BO/MMA/mp/0157-SNT

MISSION PERFORMED

Witnessed and qualification of welders & welding operators according to (ASME IX, EN ISO 9606-1, API 1104& AWS D1.1….)

Witnessed and qualification of PQR according to (ASME IX, EN15614-1, API1104 & AWS D1.1)

QA/QC during welding construction works according to (ASME IV, B31.1& B31.3…)

Witness of mechanical tests (Tensile test, bend test, impact test…)

Assistance for PWHT

Inspection of pressure vessels, piping & atmospheric storage tanks according to (API 653, API 653, API 1104, CODAP 2005…)

Witness of the cleaning and painting works (Verification of the climatic condition and Check the thicknesses of each coat and verify that satisfy the specification requirements)

Galvanizing control (structural steel, bolted tanks, structure ...) according to the standards (ASTM 123, ASTM 780. EN ISO 1461 ...)

Control by Positive materiel identification PMI according to (ASTM A 312, A 335…)

Assistance of Leak test

Hardness measurement

Control by Holiday detector

Determination of ferrite rate

Thickness measurement

MISSION

o EPPM

Project : TATAOUINE Branch line

Mean Project : Quality Inspector

Site : Tataouine

Period: from 15/01/2022 to 01/12/ 2022

Tasks:

Follow up of Civil Works (Excavation, Concrete Works, Buildings ...)

Visual inspection

o RETEL

Project : TATAOUINE Branch line

Mean Project : QA/QC

Site : Tataouine

Period: from 10/12/2018 to 01/04/ 2019

Tasks:

Follow up of welding Activity

Follow up of coating Activity

Site QC coordination

Filling of pipeline tally book

Films interpretation and reception with third party and Client

Stringing,trenching,Bending, Lowering and Backfilling Inspection o TCC

Project : NAWARA Project

Mean Project: Quality Supervisor

Site: Tataouine

Period: from 10/12/2015 to 05/12/2018

Tasks:

Responsible for Solve all difficulty during the welding operation

Visual inspection

Dimensionnel control.

Painting inspection

o Client : ABB

Project: NAWARA Project

Period: from 10/09/2015 to 01/12/2018

Mean Project: Quality Supervisor

Site: Grombalia

Tasks:

Third party for galvanization structure

o Client : STIR

Period: from 04/08/2015 to 03/09/2015

Site: Bizerte

Tasks:

Welder’s performance qualification.

Visual inspection of Storage tanks according to API 650& API 653

Supervision of repairs of tank

o Client : DELTA C&M

Period: from 01/07/2015 to 03/07/2015

Mean Project: Welding Inspector

Site: EL Alia

Tasks:

Welder’s performance qualification.

o Client : ALTRAD CEDRIA

Period: 04/05/2015 & 04/06/2015

Site: Bourj Cedria

Tasks:

Wetness of Procedure Qualification Record

Witnessed of Welder’s performance qualification. o Client : MEDCO

Period: from 06/03/2015 to 16/03/2015

Site: Bir Ben Tartar

Tasks:

Pipe reception

Visual inspection

Dimensional control.

o Client: WINSTAR TUNISIA

Site: Sabria, El Borma

Tasks:

Visual inspection of Storage tanks according to API 650& API 653

Control by PMI (Positive Material Identification)

Control by hardness measurement

Control by vacuum box

Holiday detector inspection.

Thickness measurement

o Client : RASLANOUF OIL & GASPROCESSING CO. INC

Period: from 06/06/2014 to 08/08/2014; from 19/10/2014 to 23/12/2014 Mean Project: Welding Inspector

Site: Tripoli

Tasks :

Supervision of pipeline 10’’ construction 2 Kms, API 5L –X52

Verification and approval of all specifications relative to pipeline 10’’.

Approval of procedure qualification record (PQR) and welding procedure specification (WPS) according to API 1104 and RASCO specification

Check weld and welder numbering

Monitoring the coating of pipeline 10’’after welding and supervising the control activities of weld by holiday detector.

General specification for cathodic Protection Installation

Hydraulic Testing Specifications

Checking the suitability of material used and all certificates before and during the hydro-test.

Monitoring and supervision of the hydro tests and all related safety activities

Check all material used during the operation of hydrotest o Client : CERI

Project: Sousse Project Combined Cycle Gas Power Plant (sousse D) Period: from 27/05/2014 to 03/07/2014 & from 24/08/2014 to 04/09/2014 & from04/04/2015 to 04/05/2015

Mean Project: QA/QC Inspector

Site: Sousse

Tasks:

Visual inspection of welding

Check weld and welder numbering. Ensure joint is thermal wrapped.

Inspect and record pre-welding operation.

Inspect and control of inter-pass by dye penetrant

Review and approve WPS and supporting PQR and repair welding o Client: POWER ALSTOM

Project: GHANNOUCH Project combined cycle Gas power plant Site: Gabes

Tasks:

Control by PMI (Positive Material Identification)

Welder’s performance qualification (WPQ).

o Client : Assistance Engineering et Construction

Period: from 06 to 09/03/2014

Site: El Borma

Tasks:

Control by Vacuum Box

Control by PMI (Positive Material Identification)

Ferrite rate measurement

o Client : BOUCHAMAOUI INDUSTRIE

Project: Project center of GPL storage and filling Period : from 30/01/2013 to 18/02/2013 & from 07/04/2013 to 12/05/2013 & from 02 to 22/12/2013 &from 16/02/2014 to 17/03/2014& from 28/04/2014 to 08/05/2014 Site: Gabes

Tasks:

Assist witness coupon of 06 spheres according CODAP 2005

Wetness of Procedure Qualification Record

Witness of mechanical tests

Thickness measurement

Hardness testing

o Client : MEDITERRANEAN INDUSTRIAL GROUP

Period: 08/02/2014

Site: Bouargoub

Tasks:

Wetness of mechanical testing

Wetness of Procedure Qualification Record

o Client : CMI ENERGY HRS

Project: Sousse Project Combined Cycle Gas Power Plant (sousse D) Period: from 02/01/2014 to 05/02/2014

Mean Project: QA/QC

Site: Sousse

Tasks:

Check structure galvanized

Verification and approval of specifications relative to reparation

Supervisor for all reparation

Wall Thickness measurement for galvanized layers o Client : ETELEC

Project: Sousse Project Combined Cycle Gas Power Plant (sousse C) Period: 27/08/2013 and 01/11/2013

Mean Project: Painting Inspector

Site: Sousse

Tasks:

Control of paint to according customer specification.

- Control of surface roughness

- Measurement of ambient temperature as well as support

- Checking the dew point

Control thickness of different layers of painting

Preparation of P.V control paint

o Client : TOTAL TUNISIE

Project: Witness to hydraulic tests in various stations of TOTAL Period: from 02 to 09/07/2013 & 20 to 22/01/2015

Site: Sbikha /El manzah 1

Tasks:

Control Dye penetration

Visual inspection of welding

Review and approve WPS and supporting PQR and repair welding o Client : STIR

Period: 29/06/2013 & 04/08/2015 to 07/08/2015

Site: Bizerte

Tasks:

Welder’s performance qualification (WPQ).

Wetness of Procedure Qualification Record

Holiday detector inspection of coated layers of polyethylene. o Client : NASR CONTRACTORS

Period: from 18/05/2013 to 12/06/2013

Site: Bizerte

Tasks:

Welding supervisor

Welder’s performance qualification (WPQ).

o Client : GROUP CHIMIQUE TUNISIA

Period: from 13 to 20/04/2013 and from 06 to 10/05/2013 and from 08 to 14/09/2013 Site: Gabes

Tasks:

Welding supervisor (Supervision of repairs of a sulfuric acid tank)

Control by LFET on the tank bottom

Control by PMI (Positive Material Identification)

Hardness testing

o Client: SNC LAVALIN Construction Inc.

Project: Sousse Project Combined Cycle Gas Power Plant (sousse C) Period: from 04 to 06/03/2013 and from 17 to 26/06/2013 and from 21/10/2013 to 27/11/2013 Site: Sousse

Tasks:

Welder’s performance qualification (WPQ).

Control by PMI (Positive Material Identification) o Client : HALWANI

Period: From 03/12/2012 to 31/12/2012 & from 13/01/2013 to 06/02/2013 Site: Dkhila

Tasks:

Control of paint to according customer specification.

Control thickness of different layers of painting

Preparation of P.V control paint

o Client: VIVO ENERGY

Period: From 28/09/2012 to 10/11/2012

Site: Rades

Tasks:

Painting inspector

Wetness of surface treatment and painting inspection

Control by Vacuum Box

Thickness measurement