Contact : - +919********* (WhatsApp)
+917********* (Alt.)
Email : - ***************@*****.***
*****************@*****.*** (Alt.)
RESUME
Career Objective: - Seeking a challenging career where my abilities and skills can be proved to maximum growth of the organization as well as self.
Present Employment: Rumaila Power Plant (RPP), Basra, Iraq with Bonatti S.P.A.
EDUCATION QUALIFICATION:
SUBJECT
10+2th
Physics, Chemistry and Math
Education Technical (2017)
Mechanical Engineer, Engineering College Krishna, Jhal, Haryana, India
Diploma in Safety (2008)
Fire and Safety
Skill
SAP MM, MS WORD, MS EXCEL
DOCUMENTS:
DOCUMENTS
DOCUMENT NO
DATE OF ISSUE
PLACE OF ISSUE
VALIDITY
Passport
Z6723002
17/05/2022
New Delhi
16/05/2032
C.D.C.
MUM 314832
12/06/2018
Mumbai
11/06/2028
Welding course
DBMA/2009/3325
30/09/2009
Mumbai
STCW COURSES:
COURSE NAME
CERTIFICATE NO
DATE OF ISSUE
PLACE OFISSUE
P.S.S.R
SMI/PSSR/23312/2018
14/03/2018
MUMBAI
S.S.D.S.D
SMI/SSDSD/5382/2018
03/03/2018
MUMBAI
E.F.A
SMI/EFA/24789/2018
06/03/2018
MUMBAI
P.S.T
SMI/PST/14956/2018
17/03/2018
MUMBAI
F.P & F.F
SMI/FPFF/15464/2018
10/03/2018
MUMBAI
Offshore courses: -
COURSE NAME
CERTIFICATE NO
DATE OF ISSUE
PLACE OF ISSUE
ZADCO offshore Safety
Safety induction
Installation & lifeboat Evacuation
Fire fighting & self rescue
First Aid
177811/2019
20/11/2019
Emirates technical & safety development center (ETSDC), Abu Dhabi, UAE
Travel safety by boat (OPITO APPROVED Courses code: - 5605)
00585605191119193560
19/11/2019
Emirates technical & safety development center (ETSDC), Abu Dhabi, UAE
Basic H2S Training (OPITO APPROVED Courses code: - 9014)
00589014081121233735
08/11/2021
Emirates technical & safety development center (ETSDC), Abu Dhabi, UAE
EXP.DETAILS: - SYNOPSIS
ALL ZUBAIR IPF (Initial Production Facilities) SITES: -
Worked as Rotating coordinator in Zubair, Iraq project for Initial production facilities and power generation of stations. Units’ production crude oil and facility of storage oil in tanks. As I handled 9 sites Three IPF, two Mishrif including related DGS (degassing stations) and power. Overview of plant is oil production in one day million barrels of crude. There were 15 people in my team who worked under my supervision, 5 engineers and 10 technicians. My job was to prepare the daily feedback report, provide material to my engineers with support of procurement department for the plant maintenance, I would talk directly to the client related any troubleshoot related concerned related to any break down and maintenance.
Gas Turbines Generator (GTG): -
Frame 5 b, 6 B and 6FA e+ Gas Turbine Generator (GTG) maintenance equipment installation and interface alignment shall be as follows:
(1) Load Gear
(2) Turbine
(3) Generator
Borescope inspections (Model: - Vucam XO) Gas turbine incorporates provisions in both turbine and compressor casings for visual inspection of an intermediate compressor rotor 0th to 17th stage and stator or 1st, 2nd and 3rd stage of turbine buckets and 1st, 2nd and 3rd stage of nozzle trailing edge by the optical borescope.
E class and B class gas turbine shell inspection.
F-Class Gas Turbine Compressor Washing
Liquid Washing Recommendations for Gas Turbines with Pulsed Water Wash Systems.
Scheduled maintenance of GTG is Combustions inspection, HGPI (Hot gas path inspection), MI (Major inspection) takes out Transition Pieces. Combustion casing, flow sleeve, combustion liners and crossfire Tubes. Rotating Clips Combustion, Cans cover, fuel nozzle assembly. Flame Detector spark plug, shell cooling Air piping Exhaust Plenum. Inlet plenum flexes seal.
Heavy duty gas turbine 3 days training session attended of GTG 6B control and maintenance with BAKER HUGHES a GE, Italian.
Pumps: -Centrifugal, Reciprocating / Rotary
Over hauling of centrifugal pumps of single and multi-stage including activities like replacing shaft, impeller, wear rings, bearings, mechanical seals/ gland packing
1)Reconditioning and installation of all types of mechanical.
2)Lapping seal-faces to optical flatness.
3)Triplex, Meeting, Slide Vane, Gear Pump, diaphragm.
Compressors (Centrifugal, Reciprocating / Rotary and reciprocating): -
Overhauling of multi stage centrifugal compressors including activities like rotor replacement, renewal of Labyrinths, bearings, oil filter seals, centering of rotor and other auxiliary activities in seal oil & lube oil system.
Replacement of piston liner, piston, piston rings & shoes, oil scraper rings, stuffing box packing replaced.
I have good practical knowledge about all types of ball bearings and their installation. Bearing clearance and crosshead bearing clearance checked very well, compressor. Suction & delivery (loading and unloading) valves. Crank shaft deflection, bumping clearance & maintenance.
Steam turbines: -
Rotor, bearings, carbon packing& labyrinth seal checking, adjustment trip system in turbines of horizontal and vertical mountings. Servicing overhaul steam inlet HP, MP and LP Valves and Over speed setting. Experience to take all vibration reading related to machine
Valve Section: - Activity Carried out: -
I have good analytical skills with detailed knowledge of craft practices and procedures pertaining to process safety relief valves and process valves and experience to work with team and independently. knowledge of craft practices and procedures .Knowledge of Maintenance and Operating procedures pertaining to relief valves, process valves and mechanical actuators (Auma Rotork )
Able to understand Technical Drawings, reading, writing with good communication skills in English
Expert in measuring skills for all industrial precision measuring tools like Vernier caliper, Micrometers and Depth gauge etc.
I have good practical experience in testing and calibration of all kind of relief valves and breather valves using test rigs.
1)Dismantling and cleaning of the valves.
2)Lapping valve seat and disc.
3)Gland nipping and replacement.
4)Assembly and Hydro test or setting to the set pressure.
5)Lapping paste use for lapping of 12-6-3 microns.
Gear Box: -
Changing of gears, oil seals and measuring bearing clearances and backlash of reducing and increasing gear boxes such as spur, worm and worm wheel, bevel spiral bevel, helical gears used in refinery and power. Capacity 246 KW, type is step down, outdoor unit.
HRSG (Heat recovery steam generator): -
Rated capacity of the HRSG at the base load of GT is 110 TPH at HP super heater outlet pressure of 98 bar (a) and temperature of 538 5 C and LP steam 15 TPH at LPSHTR outlet pressure of 9 bar (a) and temperature of 275 5 C.
HP HT Super heater HP LT super heater HP evaporator HP. Economizer-I LP Super heater HP economizer-II LP evaporator Condensate Pre-Heater (CPH) modules before exiting through stack to atmosphere the exhaust gas from GT follows following path through HRSG
LP Steam from LP Evaporator follows following path through HRSG
LP evaporator LP drum LP SHTR STG
Static / Competencies: (Colum / Heat Exchanges)
Fin fans, Cooling tower fans, Speeding / dispending, Spool / lines, Strainer / filter removing, Blinding / DE blinding and other Mechanical Work.
WORK EXPERIENCE:
Rumaila Power plant (RPP) project with Bonatti S.P.A., Basra, Iraq.
Mechanical Engineer
22/03/2023 to Present
ADNOC Offshore UZ -750 project with Petrofac, Abu Dhabi, UAE
Gas Turbine maintenance (GTM) specialist
16/11/2019 to 31/03/2022
O&M Solution Pvt. Ltd. Site SEPL, Kashipur, Uttarakhand, India
Mechanical Engineer
25/08/2017 to 08/11/2019
Petrofac international (UAE)LLC
Maintenance Rotating equipment Specialist
28/11/2012 to 30/09/2013
Gas Arabia Man power services (KSA)
Rotary Equipment Supervisor
16/09/2011 to 08/12/2011
GASCO Habshan, Abudhabi (UAE)
Rotary Equipment Specialist
06/03/2011 to 29/06/2011
GASCO Habshan, Abudhabi (UAE)
Rotary Equipment Specialist
20/01/2009 to 15/06/2009
Personal Details: -
Date of Birth : 24/12/1984
WhatsApp No. : +919*********
Sex : Male
Nationality : Indian
Marital Status : Married.
Computer : SAP MM, MS Office, MS Excel
Skype id : yashpal.sharma222
Address: -
Sector 04, Rewari,
Haryana, India
Place: - Haryana, India
Date: - Yours truly,
YASHPAL SHARMA