Post Job Free
Sign in

Field Engineer Pipe Welder

Location:
Marietta, SC, 29661
Posted:
July 01, 2024

Contact this candidate

Resume:

PROFESSIONAL SUMMARY

BILLY R. SHIRLEY Phone 864-***-**** (cell)

Email:**************@*****.***

OCCUPATION:PIPE SUPERINTENDENT, PIPE FIELD ENGINEER, GENERAL PIPE FOREMAN /FITTER/PIPE WELDER/ NDE COORDINATOR

PROJECT EXPERIENCE: Power Generation, Chemical, Paper Mill, Fossil Fuel and Turbine Generator

SKILLS

•Over 17 years experience as Pipe Foreman responsible for management, training and coordination with other crafts in order to increase efficiency, productivity and contribute to successful project execution;

•Over 14 years’ experience as Pipe Fitter skilled in structural welding, solder & brazing, process and mechanical piping with extensive knowledge of all types of pipe material: carbon, 304/316/316H stainless, inconel, monel, hastalloy, chrome, copper, PVC, polyvinyl, fiberglass, HDPE,Certified Combo Pipe Welder on all metals listed

•NCCER certified Industrial Pipefitter;

•Certified NCCER Instructor;

•Bevels on pipe using torch cutting;

•Machining with Clamshell and Millhog: J-Bevel, compound and standard;

•Light and heavy rigging/flag crane equipment;

•Operation of equipment: forklift, lull;

•Reading and interpretation of drawings – pipe ortho’s and isometric;

•Skilled in performing drawing take-off’s and material procurement;

•Can generate isometric drawings.

•Proactive leader with strong supervisory skills and the ability to motivate craft personnel.

CAREER EXPERIENCE

Piping field engineer/Pipe general foreman

10/21 to present

Fluor

Blacksburg South Carolina

Milliken plant

Responsible for redlining isometrics and P&IDS to accommodate system and client. Coordinate with all crafts and contractors to make progress on schedule and project safely. Direct supervision of 2 foreman and 30 hands, also over 3 other contractors with 65 hands on project. Walk down systems for hydro boundaries and reinstating system for walk down to turnover to client. Submit Rfi’s for all change orders to client and take off materials and labor for change orders.

Piping field engineer

Industrial projects innovation

SK battery plant

Commerce Georgia

09/20 to 10/21

Create system packages and add hydro boundaries

Walk down systems and sign off on system completion and system hydros. Coordinate with other contractors and work to move in right direction for the project completion date. Walk and make sure Contrators and piping was being put in right by isometric and P&IDS. Attended all coordination meetings and progress meetings and make sure everything was good and true.

Pipe superintendent

Industrial turnaround corporation

02/17 to 09/20

Direct Supervivsion over several different projects including West rock Mud drum project in Florence South Carolina. Had to reengineer all piping because no equipment drawings matched any structural drawings. Project total was 1.8 million and I had 376,000 on change orders at the end of outage. AZR plant in Mooresboro North Carolina. Direct supervision over 8 foreman and two general foreman over Expiditor and fab shop to coordinate when we needed materials to come to the field. We finished project 23 days early and acquired bonus.

Pipe superintendent

Greenwood inc. 0/15to 02/17

Direct superintendent over several different projects including Mitsubishi in Greer South Carolina.I helped quote job for all piping and mechanical work on Slitter building project. Over one general foreman and two foreman. One piping foreman and one millwright foreman. We quoted job as 2.18 million and was awarded and self performed all work also we had 188,000 in change orders.. also worked First quality paper machine in Anderson South Carolina. It was All T and M work. Completed all turnover packages for all clients.

01/13to 01/15 Pipe supt. IPI const.

Cytec inc.

Greenville sc

Direct supervision of one General Foreman and three pipe foreman with 47 pipe hands and riggers. Fabricating and installing 1/2" to 18" carbon and stainless pipe and supports. Coordinate and plan with schedule to turnover systems on time. Ordered all equipment and tools to get job started. Involved on original takeoff for all materials for pipe and supports. Involved in weld mapping,flush plan,and hydro for system turnover. Also involved in developing and reviewing all procedures to move forward with project.

06/11 to 01/13

Pipe supt.

Pipe general foreman Spirit const.

Pipe welder First Quality paper

Anderson sc

Direct supervision of 5 foreman and123 pipe hands on first of paper machine. I was over all utility building,water treatment,converting and pipe racks. We installed 1/2" to 72" stainless steel pipe for all systems. Also was involved with flushing,blowdown,and hydro. Walked systems down to be turned over to client. On phase two of project I was over second paper machine and all areas. Direct supervision of 9 foreman and 148 pipe hands. We installed 1/2"to. 72" stainless and carbon pipe. Also fabricated and installed pipe supports. Involved in flushing,blowdown,and hydro on all systems. Walk down on punchlist and turnover systems to Client on time. Planed and worked systems to stay on schedule to turnover on time. I hired in as welder and welded for first month and went into supervision.

02/2011 to 06/11

PIPEFITTER Shaw Constructors

Cliffside Steam Station

Cliffside N.C.

Fabricated and installed 1” and 1 “ vents and drains off of boiler headers being Hot Reheat, Primary and Secondary Super heaters, Roof outlet, Final Superheat, Economizer, and Boiler feed water. All systems were Heavy wall of different types including Chrome, and Carbon. Also installed several different types of Thermo wells in boiler headers being F-11, F-22, P-9 and Carbonthroughout Boiler, following different procedures for each Header and Thermo well per specification. Also workedpunch list to turnover systems by P&IDs to Hydro boilerheaders.

07/2010-02/11 PIPEFITTER/PIPE WELDER Keystone const.

GE Gas Turbine facility

Greenville S.C.

Pipefitter reading and working off of Ortho drawings and pulling own measurements to fabricate and install several different systems glycol, lube oil, fuel oil, natural gas,steam, hot air, cooling water and chilled water. System running carbon, stainless and hastalloy in schedules 10 to 80 and sizes 1” to 24” buttweld, socketweld and screwpipe. Also fabricated pipe hangers and supports for all systems. Preformed hydro and pneumatic testing for all systems that were installed and walked down to turnover to client.

01/2010- 07/19/2010 GENERAL PIPE FOREMAN Fluor Enterprises

Southern Co / Plant Scherer Units 1-4 SCR Project

Julliette, Georgia

Direct supervision of 5 foremen and 70 craft personnel during fabrication and installation of ” to 54” carbon and stainless piping for the new SCR for Units 1 – 4. Fabricated and installed lube oil, cooling water, hydraulics on I.D. Fans and Booster Fans. Performed hydro and worked punchlists on all units. Also coordinated two shutdowns of all units. Also provided support with doing material takeoffs for procurement and assisted in developing and reviewing rigging plans.

09/2008 – 12/2009 GENERAL PIPE FOREMAN Fluor Enterprises

Southern Co / Plant Crist Units 4-7 FGD Project

Pensacola, Florida

Direct supervision of 6 foremen and 87 craft personnel during fabrication and installation of ” to 54” carbon, stainless and HDPE piping for the new jet bubbling reactor for Units 4 – 7. Fabricated and installed lube oil, cooling water, hydraulics on I.D. Fans and Booster Fans. Performed hydro and worked punchlistson all units. Also coordinated two shutdowns of all units. Also provided support with doing material takeoffs for procurement and assisted in developing and reviewing rigging plans.

02/2008 – 08/2008 PIPE FOREMAN Fluor Enterprises

Duke Energy / Allen Steam Station Ash Conversion Project

Belmont, North Carolina

Fabricated and installed fly ash vacuum system 12” through 4” pipe on all five units; also fabricated and installed all pipe hangers and pipe supports. Each unit was performed as a shutdown and each was completed on schedule. Also responsible for negative pressure testing during startup. Worked punchlist on all units. Also directly involved with rigging plans.

08/2007 – 02/2008 PIPEFITTER / PIPE FOREMAN Fluor Enterprises

Duke Energy / Belews Creek Station

Greensboro, North Carolina

Fabricated and installed all sootblower piping off drawings sized 6” through ” carbon steel sch. 80 pipe. Fabricated and installed 30” through 5” J-bevel/heavy wall carbon boiler feedwater piping (100% x-ray) and economizer headers in boiler. Also fabricated and installed 1” through ” sch. 160 carbon lines for PT’s coming off boiler feedwater headers. Also fabricated our own preheat for heavy wall pipe.

07/2007 – 08/2007 PIPEFITTER / FOREMAN Edwards Piping

Mauldin, South Carolina

Fabricated and installed 12” through 1 ” sch. 40 stainless pipe (100% x-ray). Fabricated and installed pipe hangers and pipe supports. Assisted with hydrotesting. Performed our own rigging and machine work for bevels with millhog and clamshell.

06/2007 – 07/2007 PIPEFITTER Fluor Enterprises

Ghent Power Station, Ghent, Kentucky

Fabricated and installed 12” through 8” sch. 40 carbon cooling water lines in FGD building. Also fabricated and installed pipe supports and pipe hangers.

06/2007 PIPEFITTER/PIPE WELDER QCI

Santee Cooper

Charleston, South Carolina

Installed 36” pressure relief valves and high pressure/low pressure lines on GE turbine. All material was P91 chrome heavy wall (100 x-ray with -0- tolerance). Also performed our own rigging.

04/2007 - 06/2007 PIPEFITTER/PIPE WELDER Kelly Construction

Chemical Plant, Loudon, Tennessee

Fabricated and installed 24” through 4” sch. 10 stainless to vessels and down high line from buildings. Performed our own rigging, fabricated and installed pipe supports.

01/2005 - 04/2007 PIPEFITTER Fluor Enterprises

Progress Energy Power Station

Asheville, North Carolina

Fabricated and installed 24” through 4” heavy wall carbon steam lines – all 100% x-ray – compound bevel. Also fabricated and installed 18” through 2” sch. 40 carbon ammonia lines for SCR. Fabricated and installed 8” and 4” sch. 40 carbon steam valve station for tie-ins on 24” header with 8” and 4” saddle horns. Also involved in rigging, fabrication of pipe supports, startup and hydrotesting of high pressure lines. Responsible for our own preheat wrap on all heavy wall piping.

01/2005 PIPEWELDER B&L Mechanical

Welded 6” to 2” sch. 40 carbon steel chilled water lines and supports on whole systems; also 2” to ” socket weld carbon chilled water and natural gas systems for air handling units. Fabricated and installed 24” through 4” sch. 10 stainless to vessels and down high line from buildings. Performed our own rigging, fabricated and installed pipe supports.

10/2004 - 12/2004 PIPE FOREMANPIPEWELDER QCI Progress energy severalplants

N.C.,S.C.,GA.

Fabricated and installed 3” carbon vents/drains on turbines’ fuel oil systems; fabrication and installation of 2” stainless vents on natural gas system for turbines, also 1” and ” stainless tubing vents as well as all supports.

02/2004 - 08/2004 PIPEFITTER Southern Industrial

Milliken Chemical Plant, Blacksburg, South Carolina

Responsible for installation of ” to 24” process piping; piped pumps and equipment with -0- tolerance. Fabricated and installed pipe supports.

10/2003 - 01/2004 PIPEFITTER/PIPE WWELDER Qualified Contractors, Inc.

Santee Cooper Power Plant, Iva, South Carolina

Responsible for installation of 3” to 10” sch. 40 carbon steel fuel oil lines from turbine to fuel oil tanks – 100% x-ray. Fabricated and installed all pipe supports.

08/2003 - 10/2003 PIPEWELDER Republic Refrigeration

Mikco, Asheville, North Carolina

Responsible for installation of 6” carbon steel piping; fabricated and installed pipe supports for ammonia compressor and unit.

07/2003 - 02/2004 PIPEFITTER/PIPE WELDER Fagen Construction

Santee Cooper Power Plant, Iva, South Carolina

Fabrication and installation of stainless and carbon lube oil lines / stainless high-pressure airlines for turbine. Also responsible for cutting all penetration in exterior walls of turbine for piping as well as installation of underground water lines for eyewash stations.

05/2003 - 07/2003 PIPEFITTER Sanders Brothers

Gaffney, South Carolina

Responsible for fabrication of 3 – 18” sch. 10 stainless pipe and 10 – 24” sch. 40 carbon steel pipe off iso’s for the BP and Amoco Charleston facility. All pipe was 100% x-ray.

02/2003 -05/2003 PIPEFITTER Kamtech

Bowater Paper Mill, Rock Hill, South Carolina

Responsible for fabrication and installation of 4 – 36” sch. 10 stainless pipe and 10 – 24” sch. 40 carbon steel pipe off iso’s for the BP and Amoco Charleston facility. All pipe was 100% x-ray.

12/2002 - 02/2003 PIPEFITTER Duke – Fluor Daniel

Belews Creek, Greensboro, South Carolina

Responsible for fabrication and installation of ” to 1” condensate stations. Fabricated and installed 8” sch. 40 stainless sulphur lines and piping for SCR duct. 100 x-ray.

09/2002 -12/2002 PIPEFITTER Greenwood Mechanical

Mitsubishi Polymer Plant, Greer, South Carolina

Responsible for fabrication and installation of 2” to 10” stainless and aluminum sch. 10 and sch. 40 pipe for hot oil lines, plastic chp lines, fiber lines, quench water lines, drain and vent lines, steam and condensate lines.

04/2002 - 09/2002 PIPEFITTER/PIPE WELDER B&L Mechanical

GE Gas Turbine, Greenville, South Carolina

Fabricated and installation of 3” to 18” sch. 80 stainless pipe for test stand facilities, two package boilers and superheaters. Also worked hydro and startup on boilers. All lines were 100% x-ray.

01/2002 - 04/2002 PIPEFITTER Duke – Fluor Daniel

Cliffside Steam Station, Rutherdforton, North Carolina

Fabricated and installation of 1 ” to 6” instrumentation nozzles on SCR duct. Installed sootblowers, ammonia skids and piping for SCR duct. All piping 100% x-ray.

09/2001 -01/2002 PIPEFITTER Kamtech

Santee Cooper Generating Station, Iva, S.C.

Installed of 8” to 12” sch. 160 P-91 chrome flow tubes. Fabricated and installed 4” to 6” cooling water to steam turbine. Demolition of 28” cool preheat to bypass turbine. Installed valve and check valve for steam supply to turbine. 100% x-ray.

10/2000 - 09/2001 PIPEFITTER/PIPE WELDER Teachey Mechanical

GE Gas Turbine, Greenville, South Carolina

03/2000 - 10/2000 PIPEFITTER Crowder Construction

Kosa, Spartanburg, South Carolina

12/1999 - 03/2000 PIPEWELDER Edwards Piping

National Starch, Enoree, South Carolina

08/1999 - 12/1999 PIPEFITTER Fluor Daniel Construction

Dupont Project, Brevard, North Carolina

04/1999 - 07/1999 PIPEFOREMAN Freeman Mechanical

Water Treatment Plant, Greenville, South Carolina

08/1993 - 07/1999 PIPEFITTER/PIPE WELDER/ PIPE FOREMAN Freeman Mechanical

Dye House, BMW Mfg., Michelin Tire, Bi-Lo Center, Plywood Plants, Hospitals, Schools and Water Treatment Plants, Greenville, South Carolina

I put in a lot of jobs with this company.I had company truck and credit card for ordering own materials.

1990 - 1993 PIPE HELPER Various Pipe Helper positions

CERTIFICATIONS:

•NCCER Certified – Industrial Pipefitter

•Certified NCCER Instructor/Trainer

•OSHA Training

•Safety Team Leadership Class

•Certified Pipe welder



Contact this candidate