EFRAIN MORENO
Sr. Civil/Structural Engineer & Construction
Venezuela +58-412-*******
****************@*******.***
EDUCATIONAL QUALIFICATION
Civil Engineer N 63262, 1987
Universidad Metropolitana, Caracas, Venezuela.
PERSONAL DETAILS:
Date of Birth: 28/07/60
Nationality: Venezuelan
WORK HISTORY
October 2023 to Current
Borouge 4 U&O Project
IPMT – Worley – UAE
Senior Construction Engineer
Dedícate to follow up EPC Contractor L4 plan for tracking activities, more focused in Steel structure fabrication and erection (pipe racks, shelters, platforms, pipe supports and as well as civil activities.
Meetings with Contractor on weekly basis to review the plan of activities, 3 WLA, material ETA and any other concern that is hindering to get progress. Giving support and guidance to Contractor to open workfront and estimate manpower necessary to achieve the plan. Discusión with contractors CM looking for the best scenery analyzing current and future conditions related to subsystem and system, mechanical completion and categorizing punches.
As main role for supporting, pushing and have a good work environmental between PMC and EPC Contractor.
April 2022 to September 2023
Tecnicas Reunidas – Thailand Yard
CRISP Project - Singapore
Steel Structure Superintendent at module yard.
Responsible for fabrication of steel structure on shop and preassembly and assembly of structural modules at yard to ship to Singapore Exxon Mobile Jurong Refinery.
Coordination with Subcontractor, revision of project plan by L4, workfront, 3 WLA, engineering proposal for solving interferences. Internal inter disciplines coordination to open work front to others. Push and tracking subcontractor on daily basis to be on track. Look in advance for any constrain affecting progress and implement strategy recovering plan.
July 2018 to March 2022
Tecnicas Reunidas – KSA
Clean Fuels Project – ARAMCO Ras Tanura Refinery
Steel Structure Superintendent
Responsible for the erection of steel structure (16.000 T) related to piperack, structures, shelters, equipment and miscellaneous, special piping supports as well as platforms, ladders, handrails and grating for all platforms on columns, vessel and other equipment. Coordination with the steel structure vendors for fabrication to complete rack and handover them for dancing floor for piping erection purposes. Solving engineering problems as well as fabrication problems. Push subcontractor to be on track and prepare plans looking 3 months in advance. Coordination with civil, piping and E&I teams.
Handover structures for grouting, equipment installation and for fire proofing, responsible for schedule QC inspection for welding, tightening, survey for alignment and plumbness. Guide subcontractors and given them our schedule to achieve in timely manner all milestones as per the plan. Coordination with structural engineers for validating site proposals accepted on site and its evaluation with civil/underground and piping teams to sort any problem which can cause delay or schedule's impact. Follow up with procurement department on material to be delivered to site. In charge of all MCC for all system related to the structures.
August 2016 to April 2018
Tecnicas Reunidas – Malaysia
RAPID Project – Package 3 (1.6 Billions)
Steel Structure Superintendent
Responsible for the erection of steel structure related to piperack, structures, shelters, equipment’s and miscellaneous piping supports as well as platforms, ladders, handrails and grating for all platforms on columns, vessel and other equipment. Handover structures for grouting, equipment installation and for fire proofing, responsible for schedule QC inspection for welding, tightening, survey for alignment and plumbness. Guide subcontractors and given them our schedule to achieve in timely manner all milestones as per the plan. Coordination with structural engineers for validating site proposals accepted on site and its evaluation with civil/underground and piping teams to sort any problem which can cause delay or schedule's impact. Follow up with procurement department on material to be delivered to site. In charge of all MCC for all system related to the structures.
May 2014 to February 2016
Lukoil Overseas – Dubai, UAE
Gas Treatment Plant (GTP) Project. West Qurna 2/Mishrif. Iraq. (2 Billion Project)
Civil/Structural Engineer and Engineering supporting to field activities.
Responsible as Civil and Structural Engineer for the Civil, Structural and Architecture (CSA) disciplines and final quality of products for the FEED, ITB of the Gas Treatment Project. Assisting and responsible during tendering process for all queries and proposal from bidders in civil and structural area. Matrix evaluation on technical proposal submitted by bidders. Revision with cost control and contract administrator about the technical proposal to review the cost associated to the work breakdown system. Supporting procurement department during commercial proposal from bidders.
Gas treatment Plant Project which will be built in Iraq at West Qurna 2 area under JV between Lukoil and SOC from Iraq Oil & GAS Company. Review of calculation related to piling, foundation of piperack, equipment, building as well as structural steel calculation for modules and piperack stick built. Coordination with interface group in order to set up all new tie-ins, data and details. Following design calculation for Substations, process buildings and buildings on administrative area or non-process building.
Coordination with Gas Turbine Power Plant project GTPP to set up the tie-ins and the engineering needed to supply gas to support the expansion of the existing GTPP.
The concept for this project is to modularize at second generation 80% of the piperack in yards outside Iraq, skid module from vendor shops and Substations with mixed construction, modules and stick build.
Responsible for all technical requirements and participation to develop the EPC scope of work package and ITB (Invitation to Bid) during the tendering process, clarification to bidders during technical evaluation in order to receive technical offers from bidders, for evaluating, qualifying and preparation of final evaluation matrix. Participating in project PEER review and Quality Risk Assessment team.
Assisting and supporting Contract and Procurement department during commercial bidder’s offers evaluation. Revision of breakdown, MTO and schedule.
As member of the Civil Lukoil community I was reviewing and participating in the elaboration of Lukoil Engineering Practices Scope of work assisting Lukoil T&P Corporate division.
Yamama Project at West Qurna 2 – Iraq
Lukoil Overseas
Optimization of all FEED packages related to Yamama formation project as member of the Technical Corporate Expert group in order to minimize cost and schedule in Civil, Structure and Architectural Disciplines.
Gissar Project – Development of Gas-Condensate Fields Adamtash, Gumbulak, Djarkuduk –Yanki Kizilcha. Lukoil Operation Center (LUOC). Uzbekistan
Assigned as Civil/Structural Engineer in the Technical Expert group for reviewing all Civil and Structural detailed engineering of the EPC project carried out by KNM Contractor in the city of Kuala Lumpur – Malaysia.
Inspection and revision of the structural fabrication and assembling of the modularization and skid modules at yard before releasing them to be shipped to Uzbekistan.
July 2011 to May 2014
Bechtel International
Borouge 3, U&O Project – IPMT Borouge / Bechtel International (1 Billion Project)
Ruwais, Abu Dhabi. UAE
Area Interface Superintendent/Deputy Construction Manager during CM rotation periods.
Coordination of all interfaces, civil, piping, electrical and instrumentation for engineering and construction between Borouge 3 Project and external OPCO’s companies (TAKREER,GUP and GASCO) related to the pipelines interconnections; foundation for pig launcher/receivers, steel pipe supports, consumer receiver station, metering station. Coordination between Borouge 3 and Borouge existing plant for all interfaces tie-ins related to piping, civil, instrumentation and electrical points. Coordination of all interfaces between all EPC packages in Borouge 3 Project.
Piping tie-in coordinator during Borouge shut down to carry out pipeline interconnections with new Borouge 3 plant. Linking construction and commissioning activities. Mechanical walk downs for systems and subsystems, mechanical certifications, PSSR and RFSU stage.
Acting as CM during rotational periods. Follow up overall construction progress, meeting with Contractor and participating in pre-commissioning and commissioning activities and agreeing schedule.
Assigned to system’s walk down and pre commissioning/commissioning activities closing out punch items A & B as part of mechanical completion, RFSU and handover. Later on follow up closing out punchs type C.
Construction coordination for connecting 132 KV cables from Borouge 3 plant main Substation to be connected in GUP/TAKREER main Substation which supply power to Borouge 3 plant. Design of layout for GIS equipment on site.
July 2007 to June 2011
Borouge 2, UO&E Project - EPC Tecnicas Reunidas. Spain (1.3 Billion Project)
Ruwais, Abu Dhabi
(Through Tecnoconsult International (UK), Abu Dhabi, UAE)
Position: Civil Superintendent and Coordinator of interface/interconnecting areas
Construction superintendent for civil activities and coordination of interfaces with others EPC.
Coordinator for all external interconnecting pipeline works among Borouge - Gasco Plant -Gasco Habshan and Takreer Refinery.
Coordination of all civil/structural activities inside Borouge Plant to be expanded, foundations, pipe supports, and steel structure pegged to Borouge specification and AFC drawings, control of the activities and solution for all interferences during construction due existing others. Coordination with engineering group in Madrid to evaluate alternatives taken in a count safety, constructability, time, quality as per site conditions.
July 2007 to October 2007
Project: Advance Works – Borouge 2 Project
Ruwais Industrial Complex, UAE
Position Title: Engineering Coordinator/Civil Lead/Civil Supervisor
Coordinator and Civil Discipline Lead in the areas involved on this project, piping and civil, as part of the project included civil activities as ramp design, surface drainage design, concrete culverts for piping crossing roads, sleepers, pipe supports, piping routing selection for above ground lines and underground firewater line and potable water.
April 2003 – July 2007 – Petrolera Ameriven (Ameriven Upgrader)
(PDVSA, CONOCO, CHEVRON TEXACO strategy association)
VENEZUELA
Position Title: Leader of Civil and Structural Area/Project Engineer
Project Engineering coordinator for projects to be developed to improve process of the plant by external consultant, link between plant group that mean SHA, Operation, Maintenance and others parties.
As leader of the discipline in the Technical Engineering Superintendence I have responsibilities in all concrete and steel design for industrial facilities in the plant. Participation on projects starting from conceptual, basic and detailed engineering giving instruction and guidelines to get best solution taken in account cost, safety and time. Knowledge and handling of the Staad.pro structural software to calculate steel and concrete structures. Coordination with all disciplines, piping, electrical and instrumentation all design according latest codes as ACI, UBC, ASCE like this GEMS from TEXACO. Civil leader to follow up the capex projects to improve the process of the plant, all these capex project were awarded for a external consultant, definition of the scope of work, material requisition, bill of quantities. During turnover; reception, verification, walk down of all structural and civil system such as steel structure, concrete, finish grading, underground systems, roads and paving to accept them or to identified deviation during workshop fabrication, installation at construction. As civil participate in the revision named Pre Start Up Safety Review together with rest of the disciplines. Management of Chance done for all civil changes, improves, modifications.
Oct.2001 – Feb.2003: PDVSA (Venezuelan Oil Co.) – Puerto La Cruz
VALCOR I & II PROJECT –Oil & Gas
Position Title: Sr. Civil and Structural Engineer/Sr.Civil field engineer
Assignment of the Technical Management as part of the disciplinary team for the preparation of the document for request of proposal for Valcor II project, scope of work, bill of quantities, so review of the different possibilities to install the piping design layout and structural support between plants, means El Chaure and PLC existing oil refineries and the construction of the new units into the existing installations.
Related to the activities for Valcor I Project: revision of the Civil and structural detail engineering to be approved for construction of the new process plant which will improve the quality, capacity of the petroleum products that current produce. This revision include all areas such as underground drainage systems, equipment foundations, structure for equipment, substations, and pipe rack, according to PDVSA codes and international standards, such as ASCE, UBC, ASTM and so on.
As field engineer, following of the construction, clarification to the subcontracts in possible problems during of the performance of the construction, besides to define and review the possible changes to the design required for site conditions or alternative different to improve and accelerate the construction.
TECNOCONSULT VENEZUELA
From July 1988 to Sept. 2001
ENRON – TECNOCONSULT. Jose Edo. Anzoátegui. Venezuela
Accro III & IV Project. Oil & Gas
Title: Superintendent - Structural & Civil Areas
Fertilizing Project - Venezuela
Fertinitro – Snamprogetti. Jose Edo. Anzoátegui
Title: Structural eng. Leader/ Civil site coordinator
Adequateness Industrial Services Project
Puerto La Cruz Refinery. Edo. Anzoategui. Venezuela
Title: Civil Engineer and Engineering Field Coordinator
Las Cristinas Mine Project. Fluor Daniel Wright – Vancouver Canada
Title: Civil Engineer
Proyecto Expansión HDS
TECNOCONSULT &FLUOR - LAGOVEN, S.A – AMUAY. Venezuela
Title: Civil/Structural Engineer
Proyecto IAC-II – Pipeline interconnections
TECNOCONSULT & FLUOR – LAGOVEN, S.A. AMUAY. Venezuela
Title: CIVlL/Structural Superintendent
Asignación LAGOVEN, S.A. –AMUAY. Venezuela
Title: Civil/Structural Engineer
LFAY Project. TECNOCONSULT &FLUOR – LAGOVEN, S.A. – AMUAY. Venezuela
Title: Civil/Structural Engineer
CRAY-3 Project
TECNOCONSULT & FLUOR – LAGOVEN, S.A. – AMUAY. Venezuela
Title: Civil/Structural Designing Engineer
Planta Metanol/Supermetanol
SNAMPROGETTI – TECNOCONSULT.
Jose Edo. Anzoategui.
Title: Civil/Structural Designing Engineer
Line 3 Project, El Valle - La Rinconada – Caracas Subway
C.A. Metro de Caracas./
Civil/Structural Designing Engineer
CRAY Project - LAGOVEN, S.A. - AMUAY
Civil/Structural Engineer
ACCRO Project
Santa Barbara Plant – CORPOVEN - Edo. Anzoategui
Civil/Structural Engineer
VINILOS PLANT Project
UDHE-TECNOCONSULT
Client: PEQUIVEN, S.A. – El Tablazo
TECHNICAL EXPERTISE
Software used for calculation Staad.Pro
Handling of international codes:
ACI, UBC, ASCE, ASTM, AASHTO, BS, EN.
Microsoft office.