SATHISHKUMAR M
E-Mail : *************@*****.*** Mobile : 0091-944-***-****
CAREER OBJECTIVE
Looking for assignments and to serve in an organisation where my skill and capabilities would be explored in the best and independent way for the organisation to have benefit as well as to grow my career. PROFILE SUMMARY
A competent professional with over 13+ years of experience in: Project Planning & Management Erection & Fabrication Team & Contract Management Material Management MIS Reporting & Documentation EPC-Structural Engineering Projects PEB and Metal Sheeting Oil & Gas Process Piping.
Paint Shop Pre-Treatment and Electro coating (Electro deposition) Piping fabrication and installation. Equipment Installation, commissioning and Maintenance. (Presently in).
Participate in Pre-let meeting organized by client to understand the specs, establish working relationships with various stakeholders involved in the project (QS, architect, consultant, etc).
Review Project documents issued by the client so as to o Prepare a Project Plan (Method of Statements)
o Compilation of specs (QAP)
o Understand the Budget
Manage Projects from conceptualization stage to execution, finalization of technical specifications, BOM, procurement, negotiation, documentation and purchase of all capital equipment, raw materials, spares & consumables.
Working in synergy with clients and Fabrication Department to analyse the detailing & shop drawings of Steel structures for Industrial buildings, Stadiums, Bridges and Oil and gas processing pipe lines….
Working expertise in AutoCAD for steel detailing in Steel fabrication & Roof sheeting works
Team player with strong planning, interpersonal, communication, analytical, motivation & people management skills. ORGANISATIONAL EXPERIENCE
Present Organisation: DURR INDIA PVT LTD. – Oct 2022 Role:
PTED division installation, commissioning and maintenance activity. Involves Pumps, Mechanical seal system’s, Bag filters, Heat exchangers, Temperature indicators, Pressure indicator and electro pneumatic control valves.
Planning for maintenance and scheduling the sequence of activities.
Engaging manpower as per the sequent of priority in activity.
Handling lean operation to maintain the project budget by controlling and right planning in manpower, material and time.
Handling greenfield project for construction of whole paint shop and Maintenance and shutdown activity as brown field project in paint shops.
Establishing effect of communication channel between the team and ensuring smooth function of business activity.
Coordinating with client, vendor’s and suppliers for the service of damage parts and equipment.
AMC and Periotic Maintenance work:
PT and ED - Pumps, bag filters, heat exchangers, mechanical seal, multi-cyclone, strainers, valves and pipelines.
Oven – ED, Sealer, Base and Top coat Oven - blower, Shutter doors, sensors and structures.
Booth – Base coat booth and top coat booth – Robot, utility, blowers, air seal and structure.
ASU – Duct, Utility Pipe line’s, Control units and pumps.
Conveyor – Roller Belt Conveyor, Roller chain conveyor, Over hear EMS, Friction roller, Transfer lift, Drop lift and RO Dip “E & M” conveyor system.
Maintenance in PMR, Supply and Exhaust fan and duct dampers, Different Work stations and ...etc. Previous Organisation’s and its duration’s:
M/s CCD Technical Solution Pvt Ltd. Chennai - Since Feb 2019 to Oct 2022.
M/s Coastal Engineering Qatar - Since May 2014 to Nov 2018.
M/s Sathyam Steel Roof Structural LTD. Chennai - Since Feb 2011 to Apr 2014. Previous Organisation Job role and responsibilities’
• Production shop floor management with pre plan for manpower and machineries.
• Preparing and Allocating job card as per the stage wise activities.
• Material planning and reconciliation, consumables, and other work gears organising to perform the activity.
• Prepare all installation and selection documents for all mechanical equipment’s...
• Planning to achieve on time delivery with other dept teams like procurement, QC, Painting and Blasting and Logistics.
• Conducting Periodic meeting with all participants in the team to monitor and to prepare report in daily, weekly and monthly basis.
• Executing the piping lining installation at site through Isometric and P&ID Drawing from Consultant.
• Clearing the punch-point for client while final inspection and hand overing.
• Piping Support and other additional supports fabrication and fixed as per the as site condition and As Build will be submitted to Client for the approval.
• Contributing and taking ownership and support related project to comply with cost, time and quality targets.
• Coordinating with other contractors for the next day work in daily coordination meeting.
• Allocating Fit-up, Welding and finishing team according to the priority with the Standard of D31.3.
• Make QC Team to rise for Stage wise inspections such as Fit-up, welding visual, NDT (DPT, RT,), pressure testing (pneumatic) painting and picking process, Handing over inspections and document preparations.
• Installation and fabrication of structures for PEB & other Secondary steels as per Drawing
• Responsible for analysing and resolving complex fabrication issues, before steel (columns / frames Erection).
• Skilled in identifying problems and improving Productivity through process study without errors or NCR’s.
• Handling Welding processes: SMAW, GTAW, FCAW, and GMAW using both manual and fully automated techniques. Formulating the Welder Qualification Report (WQR), Welder Performance Qualification Record (WPQR).
• Reviewing manufacturing process specification (MPS), Inspection Test Plan (ITP), Installation Procedure and Calibration certificates & Material Certificates.
• Execution meetings (Kick-off, weekly, monthly Internal and External).
• Ensuring Safe work for the workers as per the HSE policy of the company and conducting TBT in daily basis. Project Handled:
Executed as Project Engineer, Co-ordinator for – Piping fabrication and installation, Skid Erection, Shell India Markets Private Limited Piping routing structures fabrication & Vessel holding PEB Structures
Hindustan Petroleum cooperation ltd – Zeton (Canada) Hydro-carbon research unit 16-Meter-high Skid modification and erection.
Executed as project in charge, Co-ordinator for – Pipe and Manifold’s installation for GDS, ISRF Cochin Shipyard – Ernakulum Piping routing support structures & Simplex Infrastructure limited (IN PRESENT) Vessel holding PEB Structures, Vessel Erection.
Executed as QC & Site Engineer for Qatar National Museum – Disk Secondary Steel Installation, Stair Nosing.
Executed as Site Engineer for Khalifa Stadium – Secondary Steel Structural for Front Cladding.
Executed as Site Engineer for Lusail Bridge Project 8 & 9 – Primary Steel Retrofit Work.
Executed as Site Engineer for Al-Wakra Stadium – Secondary Steel Frames Fabrication & Erection. CERTIFICATION
Work at ROOF NET trained by FASET Training Agent - Doha - 2016
Confined Space trained from Orbrit training Institute - Doha - 2018
ASNT level 2(MT, PT, RT, UT) from Gamma Institute of NDT, Ranipet - 2010
Elementary First Aid from Hyundai Engineering and Construction - 2014 TECHNICAL SKILLS
Proficient in AutoCAD, Microsoft Office, word, Adobe Photoshop and Internet Applications
Standards: ASME sec IX, AWS D1.1and D1.5 – Bridges (structure welding) Fabrication familiar with: Mild Steel- IS2062 Gr A&B, ASTM A500, S275JR, S335, S460 Carbon steel. EDUCATION
2010 B.E. (Mechanical) from ANNA University – Maharaja Engineering College, Avinashi with 69.5% 2007 Diploma in Mechanical Engineering from S.A.P.T.C. Polytechnic, Tiruvannamalai Dist. with 74.5% PERSONAL DETAILS
Date of Birth : 8th May 1988
Languages Known : English, Hindi, Tamil
Permanent Address : No 16 Marriamman Koil Steet Nagalkani Chrompet CHENNAI -600044, Tamil Nadu, India
Current Address :
Passport No. : N5000250 valid till 10/12/2025
Marital Status : Married
No. of Dependents : 5
Nationality : Indian
Place : Chennai
Thanks & Regards
M.SathishKumar