Florentino Delfin Panes Jr.
Age.**y/o
***********@*****.***
Category.
Industrial Electrician
Electrical technician
Electrical Foreman
Work Experience
Electronics Tech./Electrician.
April 2014 to present
JOB DESCRIPTION.
Repair audio amplifier and diagnost the trouble an repair and replace the of damaged.repair of tv led an diagnost for the trouble and replace parts of damage. In preformed the installation the cctv. Setting of all cameras from the fields to cctv control room. Install the solar panels an solar charger to the connected the battery bank. An inverter, twe kind the inverter. Off grid and on grid type.
Electrical /Instrumentation Technician
Kentz company - Papua new guinea
March 2013 to September 2013
Responsibilities
• Performing of control loop checking, calibration, recalibration, troubleshooting, verification, rectification, modification and simulation of various instrumentation and control instruments.
• Testing of fire alarm, smoke detector and heat protector
• Perform all the job, as advised by Supervisor and gave daily production reports.
• Perform loop checking and loop setting of Valve Air Ventilation (VAV) to the client as per Engineer/Supervisor’s schedule
• Loop checking/ loop testing/ functional and matrix testing of Air Handling Unit AHU) instruments such as pressure/temperature/flow transmitters/ switches.
• Responsibilities & Duties:
• Perform loop checking and loop setting to the client as per Engineer/Supervisor’s schedule.
• Perform wire checking of field instrument to junction box up to Control Room.
• Termination of instrument cables, transmitters, junction box cross connection on marshalling panels.
• Field instrument installation based on instrument location plan and Piping instrument diagram (P & ID).
• Perform wire checking of field instrument to sjunction box up to Control Room.
• Monitoring of all installed instruments in air compressor 1 &2 due to functional and matrix testing according to the command of engineering team in control room specially the condition of the turbine.
• Bench Setting of actuators
• Servicing of SOVs, Boosters, Filters, Regulators and other accessories in control valves
• Perform loop checking and loop setting to the client as per Engineer/Supervisor’s schedule.
• Perform wire checking of field instrument to junction box up to Control Room.
• Termination of instrument cables, transmitters, junction box cross connection on marshalling panels.
• Validation/Calibration of process instruments, especially smart family transmitter, Foxboro, allen Bradley, honey well, Rosemount Transmitter like pressure temperature switches and gauges, masoneillan control valves.
• Perform all the job, as advised by Supervisor and gave daily production reports.
• Field instrument installation based on instrument location plan and Piping instrument diagram (P & ID).
• Termination and installation of level switch on truck loading area. (Granules)
• Termination and installation of vibration probe in gas compressor (first to sixth stage).
• Rendered services in the Maintenance and Process Units to perform Validation and Calibration of Instrumentation system Such as Transmitters and Control Valves installed in CDU, OCR and Plat former Unit.
• Loop checking of instrument controller, such as Honeywell, smart transmitter and control valves stroking and functional testing.
• Wire checking and continuity checking from instrument junction box to control panel.
• On site validation/ calibration PT, FT, LT and TT.
• Testing of fire alarm, smoke detector and heat protector.
Electrician
Ramy Construction
2010 to 2012
JOB DESCRIPTION:
• Performed installation, operation and repair maintenance tasks.
Diagnosed problems repair and perform maintenance tasks on high and low voltage power distribution systems, motor control and Variable Speed Drive.
Prepared Bill of Materials and maintain Power Schematics drawings up to date.
Maintained complex systems embodying electronic and Electro-mechanical principles.
Directed trades Assistants to accomplish the safe and timely completion of such projects.
E&I Electrician
Kentech Qatar - Doha
December 2009 to April 2010
Doha Qatar
Shell GTL (Effluent Treatment Plant Project)
JOB DESCRIPTION:
• Responsible for the installation junction boxes. Glanding and termination of instrument cables.
• Responsible for the installation of instrument transmitters like the pressure indicator transmitter (PIT), flow indicator transmitter (FIT) and the temperature indicator transmitter (TIT).
• Responsible for the glanding and termination of control cables in control panels
• Responsible for glanding and termination of low voltage and medium voltage three phased field motors (690 volts 50hp and 185 hp pump motors)
• Responsible for the installation, glanding and termination of lighting supports, lighting fixtures, emergency lightings, and beacon and speaker units.
• Termination of high voltage field motors and transformer primary& secondary line, 6.6kva to 11kva and using Reychem kits.
E&I Electrician
Kentech Qatar - Doha
April 2008 to December 2009
Doha Qatar
Al Jabber CSP (Common Sulphur Project)
JOB DESCRIPTION:
• Checking of electrical equipments and other related works on well head tie-in.
• Electrical / instrument system package.
• Responsible for the glanding and termination of a control cable in control panel with a cable dressing.
• Responsible for installed transmitter stanchion and cable tray.
• Responsible glanding termination of a low voltages and medium voltage, panel board to junction box.
• Responsible (VSD) variable speed drive, of glanding and termination.
• Responsible for the installation junction boxes. Glanding and termination of the instrument cable and equipment.
• Performed troubleshooting of MCC (Motor Control Center) and switch gear low /high voltage 3 phase motor.
• Qatar Gas Preformed commissioning and preventive maintenance
Electrical Technician
Republic Cement Corporation
April 2004 to December 2007
JOB DESCRIPTOIN:
• Responsible industrial electrician works to the site.
• Responsible termination of a low voltages and medium voltage, panel board to junction box.
• Responsible installation junction box to equipment fire alarm detector.
• Responsible installed circuit breaker panel junction box.
• Responsible for the cable installation and termination of lighting fixtures, emergency lightings, and beacon and speaker units.
• Checking of electrical equipment's and other related works on well head tie-in.
• Responsible for the installation junction boxes. And termination of the instrument cable and equipment.
• Responsible for the termination of a control cable in control panel with a cable dressing.
• Responsible for installed transmitter stanchion and cable tray
• Responsible loop checking the cable instrument and motor cable.
• Responsible work the automation department.
Industrial Electrician
Hiriko Enterprises
July 2000 to March 2004
JOB DESCRIPTION:
• Installed power supply wiring and conduit for newly installed machines and equipments.
Diagnosed malfunctioning transformers, motors, and lighting fixtures
Replaced faulty relays, switches, and motors, and positions sensing devices.
Installed wiring, conduit, and electrical apparatus in buildings.
Connected power supply wires to machines and equipment and panel control.
Industrial Electrician
Tramis Battery Trading
October 1999 to June 2000
JOB DESCRIPTION:
• Conducted troubleshooting and repair of related electronics circuits and electrical panel rooms problems. Repairing of synchronizer electronic control boards which can operate a 3 to 50 hp motor, a magnetic switcher timer, an automatic relay switches and a modifying ac/dc voltage power supply for the industrial laboratory and workshops.
• Conducted the installation and programming of PABX (Private Automatic Branch telephone Exchange) layout wirings. The termination of telephone lines, intercom/computer lines for building and office installation.
• Conducted troubleshooting and repair of related electronic circuit consoles, system digital/wireless/cable telephones, DSA card and fax modem and fax machines.
• Performed preventive maintenance of PABA telephone exchange, handheld radio, electronic door access systems, BMS fire alarm systems and CCTVs.
• Conducted routine check-ups for all communication that are installed in the plant
Building Electrician
NhoelJr.Construction
March 1993 to August 1997
JOB DESCRIPTION:
• Checking of electrical equipments and other related works on well head tie-in.
• Performing Electrical wiring and loop checking activities
• Repair and replace 440 volt electric 3 phase motor and perform test heat trace.
• Test, install and repair UPS distribution lighting systems and hull cathode protection system
• Monitoring and Energization of switch gear. Perform preventive maintenance for clients.
• Performed commissioning and preventive maintenance of electrical system packages.
• Performed trouble shooting of MCC (motor control center) and switch gear low/high voltage 3 phase motors.
• Performed troubleshooting of electrical field equipments. Function testing of electrical control circuits, including magnetic starters.
• Modification and troubleshooting of MCC cubicle magnetic starters and control station.
• Ensuring that all task performed are carried out safely and on time.
Education
Electronics Engineering
International correspondence shool
1996 to 2000
Industrial Electrician
Meralco Foundation Institute
1997
Skills
•welder
.carpenter
Electronics Technician
Hydraulic mechanics
Light and heavy electrician
Supporting documents
Add.Industrial Electrician trade test meralco foundation institute