Post Job Free
Sign in

Civil Engineer Engineering

Location:
Kolkata, West Bengal, India
Posted:
May 26, 2024

Contact this candidate

Resume:

CV of Saikat Kar

Page * of **

CURRICULUM VITAÉ

1. General :

Contact No. : +91-980******* / 943-***-****

Email address : ad5ymm@r.postjobfree.com, ad5ymm@r.postjobfree.com Permanent Address

: * **., ***ENDRA AVENUE (1ST LANE), NIRMALA APARTMENT, FLAT NO.- 201(1ST FLOOR), POST.:-UTTARPARA, DIST.:-HOOGHLY, WEST BENGAL – 712258

Communication Details : 103/5, B. K. STREET, DAGA COMPLEX- 3, FLAT NO.- B-103, POST:- UTTARPARA, DIST:- HOOGHLY, WEST BENGAL – 712258

Date of Birth : 17/04/1976

Citizenship : INDIAN

Marital Status : Married

Passport Details : Passport No. - T 7084630; Place of Issue - Kolkata Date of Issue - 10th July 2019

Date of Expiry - 9th July 2029

2. Education:

Degree Specialization College/University Year of Passing B. E. Civil Engineering University of Pune 2001

PGDBA Operation Management Symbiosis Centre For Distance Learning 2011 3. Profile Summary:

Successfully contributed 14 Years in Construction of Six Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to Km 521.120 in the State of Jharkhand and West Bengal of total length- 122.80Km.; Chandikhole- Jagatpur-Bhubaneswar section of NH-5 / NH-16(now) of total length- 67Km; Panagarh - Palsit section of NH-2 of total length- 65Km., Palanpur-Swaroopgunj section of NH-14 of total length- 76Km.) on BOT Annuity basis ; State Highways (Gazol-Hilli Section of SH-10 with Link road from Patiram to Balurghat of total length -110 Km.) Contract Package: D- ADB Loan No. 1870- IND ; Rural Access Roads Connecting NH-34 Contract Package: F

(South) of total length- 42 Km.- ADB Loan No. 1870- IND ; Interconnected Arterial Roads (Jamshedpur Town under Growth plan of TATA Steel of Length 20Km & for Vedanta Medical Research Foundation centre at Naya Raipur of length 4Kms.) ; Approach & Internal Plant Roads of length – 10Kms. ; Major Bridges on River

(length 160 m. – 230m.); Minor Bridges, Box Culverts & Underpasses.

Successfully contributed 4 Years in Construction of Industrials Projects - Construction of Raw Material Handling

– Ore Handling Plant (Package -01A) for 2.5 MTPA New Stream Expansion of IISCO Steel Plant (SAIL) & Construction of External Water Supply System for BOF and CCP Area (Package -11-14) on EPC Mode.

Successfully contributed for 10 months as Project Planner & Management specialist for West Bengal Drinking Water Sector Improvement Project ADB funded (Loan number 3696 IND) - Design, Construction and Operation of Water Treatment Plant, Reservoirs, Transmission Mains and Pumping Stations works, Overhead Reservoir, laying of Water Supply Distribution

Successfully contributed 4 Years in Construction of Various types of Buildings – Aliah University Campus with

(B+G+8) Tower Building of 10 Lacs sq.ft. area, Boys (G+17) & Girls Hostel Building (G+17) ; 7 Nos. of Super Speciality Hospitals (G+3) ; Garment Park (4 nos. G+7 & 1 no. G+3 Buildings) on Design & Built basis; 49 Nos. of Multipurpose Cyclone Shelter Buildings (G+2) Under National Cyclone Risk Mitigation Project (NCRMP-II) funded by World Bank.

SAIKAT KAR

Goal oriented professional offering 22 years of experience in Project Management, Construction Management, Execution, Operation & Maintenance, Project Planning & Monitoring and Billing. Rich experience in the field of Highway & Bridge Construction Projects, Operation & Maintenance of Highway projects, Industrial Projects, Water Supply Improvement Projects, Building (Institutional, Commercial & Hospital) Construction Projects, EPC Projects etc. seeking senior level assignment in the area of Project Management/ Construction Management in leading organization. CV of Saikat Kar

Page 2 of 10

4. Employment record relevant to the assignment: 22 Years of work experience Period Employing Organization and

your Title / Position

Summary of activities performed relevant to the Assignment Jan’23 –

Till Date

Employing Organization:

Elsamex Maintenance Services

Ltd.

Position: Project Head

Responsible for overall execution & supervision of all the construction activities of Road works, Cross drainage works, Minor

& Major Bridges etc., as per the specification towards completion of projects as well as Operation & maintenance work of Barwa-Adda- Panagarh Section of NH-2 (122.80Kms).

Co-ordinating and liasioning with client (NHAI & IE) regarding Project progress status, contractual terms and conditions, getting approvals from IE.

Responsible for mobilisation of sufficient resources like manpower

& machineries, finalisation of sub-contractors and their rates.

Co-ordinating and liasioning with subcontractor regarding work progress status, preparation of work programme, contractual terms and conditions and other Project related matters.

Facilitating our EPC contractor by providing them encumbrance free land for carrying out structural as well as road works.

All correspondences with NHAI / any Government Body notice and ensure timely action on the same.

Ensure timely submission of the monthly O&M reports to NHAI / IE.

Ensure 100% Compliance of O&M and contractual requirements-

Follow-up with insurance company for early settlement of pending insurance claims.

Review the overall operations of the projects & report to management & take approvals.

Ensure all safety precautions and use of PPE’s by all the workers at project site.

Ensure health and environmental compliances and ensure quality control / quality assurance.

Sep’20 –

Jan’23

Employing Organization: Shree

Jagannath Expressways Pvt. Ltd

Position: Head Maintenance

(DGM-Technical)

Responsible for overall execution & supervision of all the construction activities of Road works, Cross drainage works, Minor

& Major Bridges etc., as per the specification towards completion of projects as well as operation & maintenance work of NH-16 from Bhubaneswar to Chandikhole (67Kms).

Co-ordinating and liasioning with client (NHAI & IE) regarding Project progress status, contractual terms and conditions, getting approvals from IE.

Responsible for mobilisation of sufficient resources like manpower

& machineries, finalisation of sub-contractors and their rates.

Co-ordinating and liasioning with subcontractor regarding work progress status, preparation of work programme, contractual terms and conditions and other Project related matters.

Facilitating our EPC contractor by providing them encumbrance free land for carrying out structural as well as road works. Nov’19 –

Aug’20

Employing Organization: URS

Scott Wilson India Pvt. Ltd.

Position: Project Planner &

Management specialist

Preparation of Work Plan and Implementation Schedule in MS Project for all Work Packages.

Preparation of Monitoring Framework with Planning of all Construction Works.

Tracking and Monitoring the Work Progress of all work packages with respect to the baseline work plan.

Identifying the Critical activities and highlighting the critical areas / area of concern to the Client.

Assessing the impact of any delays by the Contractor. Aug’19 –

Nov’19

Employing Organization: AMUL

INDIA (Kaira District Co-

operative Milk Producers’ Union

Ltd.)

Finalization of Scope of work, preliminary engineering & design in coordination with in-house consultant, finalisation of BOQ and floating of tenders or raising enquiries to various approved vendors.

Finalisation of Contractors, evaluation of their rates along with the CV of Saikat Kar

Page 3 of 10

Position : Manager – Civil (HOD)

Purchase Deptt., taking approval from higher authority & subsequently generation of work orders / purchase orders.

Finalization of material requirement and coordinating with purchase department for timely delivery at site.

Overall supervision of the construction activities and monitoring quality of work executed by contractors.

Continuous Monitoring of day-to-day activities of all project sites with respect to completion schedule & highlighting the critical areas

/ area of concern to higher authority to avoid further delays / variance.

Certification of contractor’s work measurement sheet. Apr’18 -

Aug’19

Employing Organization: BIL

Infratech Ltd. (Subsidiary of

Binani Industries Ltd.)

Position: Asst. General Manager

(Construction & Planning)

Project Management viz., Project Planning with resource management. Mobilization of site infrastructure, Equipment, Material, Manpower and managing Sub-contractors as per the work plan, execution of Works within the Contractual and budgeted norms of time.

Preparation of Work Completion Schedule / Gantt chart, Yearly Sale budget, Profitability statement and Cash flow of all projects.

Continuous Monitoring of day-to-day activities of all project sites with respect to completion schedule & highlighting the critical areas

/ area of concern to respective site-in-charge to avoid further delays

/ variance.

Monitoring Monthly sale budget / MIS and highlighting physical/ financial slippage/ variance to higher Management for necessary action.

Monitoring of resources needed for execution at various projects and their optimization.

Subcontractor identification, evaluation of their rates and taking approval from higher authority wherever required & subsequently generation of work orders of Subcontractors.

Regular co-ordination with various departments for timely inputs to fulfil project requirement.

Finalization of material requirement with purchase department for timely delivery at site.

Follow up with accounts department for release of contractor’s payment. Follow up for Submission of Bank Guarantee to client as per contract clause. Tracking of Bank Guarantees submitted contractors for its release or extension if needed.

Follow up with Taxation department for issuance of C-form & IT return of contractor.

Follow up with Insurance department for opening insurance as per contract. Follow up for payment of premium. Co-ordinate with site and insurance department in case of any claims in project. Apr’15 -

Mar‘18

Employing Organization: BIL

Infratech Ltd. (Subsidiary of

Binani Industries Ltd.)

Position: Sr. Manager

(Construction & Planning)

Jun’12 -

Mar‘15

Employing Organization: BIL

Infratech Ltd. (Subsidiary of

Binani Industries Ltd.)

Position: Manager (Construction

& Planning)

Jun’10 -

May’12

Employing Organization:

McNally Bharat Engg. Co. Ltd.

Position: Manager

(Construction)

Preparation of Work Plan and Implementation Schedule in MS Project for all Work Packages.

Preparation of Monitoring Framework with Planning of all Construction Works.

Responsible for supervision of overall execution of site construction activities as per the technical specification & approved drawings.

Regular Co-ordination with engineering team for submission of drawing to client for approval.

Monitoring of project progress in terms of physical and financial point of view.

Subcontractor identification, evaluation of their rates and taking approval from higher authority wherever required & subsequently generation of work orders of Subcontractors.

Meeting with contractor on monthly basis regarding progress of work.

Co-ordination and liasioning with client & consultant regarding technical issues, for clearance of Hindrance, contractual terms and CV of Saikat Kar

Page 4 of 10

conditions and other Project related matters.

Drafting and issuing contractual letters to Client as well as contractors for project related issues.

Apr’08 -

May’10

Employing Organization:

McNally Bharat Engg. Co. Ltd.

Position: Dy. Manager

(Construction & Planning)

Project Management viz., Project Planning with resource management. Mobilization of site infrastructure, Equipment, Material, Manpower and managing Sub-contractors as per the work plan, execution of Works within the Contractual and budgeted norms of time.

Preparation of Work Completion schedule in MS Project & Cost Budget of a project.

Responsible for supervision of overall execution of site construction work activities as per the technical specification & approved drawings.

Making and floating of civil work tender and finalization of civil contractor.

Preparing terms and condition of contract for issuing work order to contractor

Monitoring of project progress in terms of physical and financial point of view.

Meeting with contractor on monthly basis regarding progress of work.

Co-ordination and liasioning with client & consultant regarding technical issues, for clearance of Hindrance, contractual terms and conditions and other Project related matters.

Drafting and issuing contractual letters to Client as well as contractors for project related issues.

Preparation of Client bill and getting it certified from client for payment.

Aug’07 -

Apr’08

Employing Organization:

Consulting Engineering Services

(India) Pvt. Ltd.

Position: Highway Engineer

Responsible for supervision & monitoring of all the construction activities of road works like Earthwork, GSB, WMM, BM, SDBC etc., executed by the contractor.

Checking of line & level and Field dry density test of each layer of non-bituminous activities executed by contractor

Responsible for preparation of contractor’s work measurement book and checking of contractor’s monthly bill.

Co-ordinating and liasioning with Employer/Client (PWD-Roads, Govt. of West Bengal) regarding Project progress status and other Project related technical matters.

Oct’06 -

Aug’07

Employing Organization:

Larsen & Toubro Ltd. (IDPL)

Position: Project Engineer

Project Management viz., Project Planning with resource management. Mobilization of site infrastructure, Equipment, Material, Manpower and managing Sub-contractors as per the work plan, execution of Works within the Contractual and budgeted norms of time.

Responsible for execution & supervision of all the construction activities of road works like Earthwork, GSB, WMM, DBM etc., as per the specification and approved x-sections. executed by EPC contractor.

Co-ordinating and liasioning with client regarding Project progress status, contractual terms and conditions, getting approval.

Responsible for liasoning with govt. official as well as supervision of preconstruction work like Land acquisition, utility shifting, deforestation etc..

Co-ordinating and liasioning with subcontractor regarding work progress status, preparation of work programme, contractual terms and conditions and other Project related matters.

Facilitating our EPC contractor by providing them encumbrance free land for carrying out structural as well as road works. Jul’01 - Employing Organization: Project Management viz., Project Planning with resource CV of Saikat Kar

Page 5 of 10

Sep’06 McNally Bharat Engg. Co. Ltd.

Position: Dy. Manager

(Construction & Planning)

management. Mobilization of site infrastructure, Equipment, Material, Manpower and managing Sub-contractors as per the work plan, execution of Works within the Contractual and budgeted norms of time.

Responsible for execution & supervision of all the construction activities of road works like Earthwork, GSB, WMM, DBM etc., as per the specification and approved x-sections.

Co-ordinating and liasioning with client regarding Project progress status, contractual terms and conditions, getting approvals.

Co-ordinating and liasioning with subcontractor regarding work progress status, preparation of work programme, contractual terms and conditions and other Project related matters.

5. Software Skills : Having knowledge of MS Office for various levels of planning, scheduling, reporting involved in project.

Project Management software - MS Project

ERP for Purchase Requisition, Work order, Client & contractor’s Billing, Fair Working Knowledge of AutoCad & AutoPlotter

(Road Estimator

6. Language Skills

: Language Speaking Reading Writing

English Good Good Good

Hindi Good Good Good

Bengali Good Good Good

7. Work Undertaken that Best Illustrates my Capability to Handle the Tasks Assigned: 1. Name of the Assignment or Project: Construction of Six Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to Km 521.120 in the State of Jharkhand and West Bengal including Panagarh Bypass under NHDP Phase – V on Toll on DBFOT Pattern

Year: Jan'23 to till date Location: Barwa-Adda-Panagarh Section of NH-2 in the State of Jharkhand and West Bengal

Client: NHAI

Main Project Features: Construction of 122.80 Km. of Six laning of Barwa-Adda-Panagarh Section of NH-2 (Road & Bridges)

Positions held: Project Head

Activities performed: Responsible for overall execution & supervision of all the construction activities of Road works, Cross drainage works, Minor & Major Bridges etc., as per the specification towards completion of projects as well as Operation & maintenance work of Barwa-Adda-Panagarh Section of NH-2 (122.80Kms). Co-ordinating and liasioning with client (NHAI & IE) regarding Project progress status, contractual terms and conditions, getting approvals from IE. Responsible for mobilisation of sufficient resources like manpower & machineries, finalisation of sub-contractors and their rates. Co-ordinating and liasioning with subcontractor regarding work progress status, preparation of work programme, contractual terms and conditions and other Project related matters. Facilitating our EPC contractor by providing them encumbrance free land for carrying out structural as well as road works. All correspondences with NHAI / any Government Body notice and ensure timely action on the same. Ensure timely submission of the monthly O&M reports to NHAI / IE. Ensure 100% Compliance of O&M and contractual requirements. Follow-up with insurance company for early settlement of pending insurance claims. Review the overall operations of the projects & report to management & take approvals. Ensure all safety precautions and use of PPE’s by all the workers working at project site. Ensure health and environmental compliances and ensure quality control / quality assurance. 2. Name of the Assignment or Project: Six laning of Chandikhole-Jagatpur-Bhubaneswar section of NH-5 / NH- 16(now) from Km 414+000 to Km 419+000 and km 0+000 to Km 62+000 (length 67 Kms) in the state of Orissa to be executed as BOT (Toll) project on DBFOT pattern under NHDP Phase-V. (Contract Value- 1350Cr.)

Year: Sep'20 to Jan’23 Location: Chandikhole-Jagatpur-Bhubaneswar, Odisha Client: NHAI Main Project Features: Construction of 67Km. of Six laning of Chandikhole-Jagatpur-Bhubaneswar section of NH-16 CV of Saikat Kar

Page 6 of 10

(Road & Bridges)

Positions held: Head Maintenance / DGM (Technical)

Activities performed: Responsible for overall execution & supervision of all the construction activities of Road works, Cross drainage works, Minor & Major Bridges etc., as per the specification towards completion of projects as well as operation & maintenance work of NH-16 from Bhubaneswar to Chandikhole (67Kms). Co-ordinating and liasioning with client (NHAI & IE) regarding Project progress status, contractual terms and conditions, getting approvals from IE. Responsible for mobilisation of sufficient resources like manpower & machineries, finalisation of sub-contractors and their rates. Co-ordinating and liasioning with subcontractors regarding work progress status, preparation of work programme, contractual terms and conditions and other Project related matters. 3. Name of the Assignment or Project: Project Management Consultant West Bengal Drinking Water Sector Improvement Project ADB funded (Loan number 3696 IND) Year: Nov'19 to Aug’20 Location: New Town, West Bengal Client: Public Health Engineering Directorate, Govt of West Bengal

Main Project Features: The project envisages to create an exemplary model for rural water drinking services in three selected districts of West Bengal. Through efficient use of surface water the project will preserve groundwater, enhance climate resilience, and reduce the burden of disease from arsenic and fluoride; the project will provide higher service levels compared with rural schemes in India in general, with individual household connections and district metering area (DMA) based metered continuous water supply; the project will use a high-technology-based STWM system to efficiently manage water services, which will be a first for rural water schemes in the state and in India; Positions held: Project Planner & Management specialist Activities performed: Preparation of Work Plan and Implementation Schedule in MS Project for all Work Packages, Preparation of Monitoring Framework with Planning of all Construction Works, Tracking and Monitoring the Work Progress of all work packages with respect to the baseline work plan, Identifying the Critical activities and highlighting the critical areas / area of concern to the Client, Assessing the impact of any delays by the Contractor. 4. Name of the Assignment or Project: Construction of Multipurpose Cyclone Shelters Under National Cyclone Risk Mitigation Project (NCRMP-II) which is World Bank funded project. (Contract Value – Rs.239.5 Crs). Year: Jan'17 – Aug’19 Location: 24 Parganas (South & North) districts in West Bengal Client: SPIU, NCRMP II, Department of Disaster Management, West Bengal

Main Project Features: Construction of 49nos. Cyclone Shelter Buidings (G+2) at different location in Block - Gosaba and Kultali, Sandeshkhali -1, Sandeshkhali –2 and Hingalgunj & Hasnabad in 24 Parganas (South & North) districts in West Bengal. It Includes all Civil Works, Water Supply, Plumbing & Sanitary Works, Electrical Works, Solar System & Lighting Arrester, Drainage works, Construction of Approach Roads to all the Cyclone shelter Buildings (Approx. 40Kms.).

Positions held: Dy. Project Manager

5. Name of the Assignment or Project: Design & Construction and related work of the proposed Garment Park, at Kalipur, Budge Budge, Dist. 24 Pgns (S), West Bengal (Contract Value – Rs.195.89 Crs). Year: Feb’16 - Jan’18 Location: Budge Budge, Dist. 24 Pgns (S), West Bengal Client: West Bengal Industrial Development Corporation Ltd.

Main Project Features: Construction of 4 nos. Standard Design Factory (G+7) Buildings & 1no. Common Factory Building (G+3) Building, Electrical Sub-station, Pump House etc. Statutory Clearance – Clearance from Forest Deptt., SWID clearance for ground water distribution, Aviation Clearance, Fire Clearance, Environmental Clearance.

Construction work includes - Civil Works, Electrical works, Firefighting, Installation of Lift & D.G set, Internal Plumbing

& Sanitary works, External Water supply and Sewerage line, 180 KLD WTP; 145 KLD STP; Terminal pumping station; clear water rising main, portable water distribution; sewerage water network; Compound Wall, Construction of Internal & Approach Roads (Approx. 3 Kms.).

Positions held: Dy. Project Manager

CV of Saikat Kar

Page 7 of 10

6. Name of the Assignment or Project: Construction of different bridges with approach Roads in Sundarban Region at Joynagar-II, Mathurapur-II and Sandeshkhali-II block in the district of South 24 Parganas : Package-2. (Contract Value – Rs.66 Crs).

Year: Mar’15 – Sep’17 Location: Joynagar-II, Mathurapur-II and Sandeshkhali-II block in the district of South 24 Parganas Client: Hooghly River Bridge Commissioners, Kolkata Main Project Features: Construction of 3nos. Major bridges over Sonatikuri river (Total Length – 193 Metre), Nalgora river (Total Length – 160 Metre) & Bali-Boalia river (Total Length – 224 Metre), PSC I-Girder, Pile foundation (Dia.- 1200mm & Depth- 30 m. approx.) and Total 4 Kms. of Approach Roads. Positions held: Dy. Project Manager

7. Name of the Assignment or Project: Construction of balance work of 3 nos. Super speciality Hospitals under BRGF at Debra and Salboni in Paschim Medinipore and at Nandigram in Purba Medinipore : Package-2.

(Contract Value – Rs.141.46 Crs).

Year: Mar’15 – Aug’16 Location: Debra and Salboni in Paschim Medinipore and at Nandigram in Purba Medinipore, West Bengal Client: HRBC, Kolkata

Main Project Features: Construction of 3 nos. Super Specialty Hospital Buildings – It includes Civil Works, Electrical works, Installation of Lift & D.G set, Internal Plumbing & Sanitary works, External Water supply and Sewerage line, 3X210 KLD WTP; 3X170 KLD STP; Pump House; Fire protection system, Medical Gas Pipeline, Modular OT, IBMS, Construction of Internal Roads works .

Positions held: Project Manager

8. Name of the Assignment or Project: Construction of 4 nos. Super Speciality Hospitals under BRGF at Metiaburz & Kakdwip in South 24 Parganas, at Sagardighi in Murshidabad & at Bolpur in Birbhum - Pkg. – 1

(Contract Value – Rs.173.75 Crs).

Year: Mar’14 – Feb’16 Location: Metiaburz & Kakdwip in South 24 Parganas, at Sagardighi in Murshidabad & at Bolpur in Birbhum district of West Bengal Client: HRBC, Kolkata Main Project Features: Construction of 4 nos. Super Specialty Hospital Buildings – It includes Civil Works, Electrical works, Installation of Lift & D.G set, Internal Plumbing & Sanitary works, External Water supply and Sewerage line, 4X210 KLD WTP; 4X170 KLD STP; Pump House; Fire protection system, Medical Gas Pipeline, Modular OT, IBMS. Construction of Internal Roads works.

Positions held: Dy. Project Manager

9. Name of the Assignment or Project: Construction of Aliah University Campus with (B+G+8) Tower Building including all Civil works, Sanitary & Plumbing works, Internal and External Electrification works, Elevators and other ancillary works at New Town, Rajarhat, West Bengal (Contract Value – Rs. 255 Crs). Year: Mar’13 – Dec’14 Location: New Town, Rajarhat, West Bengal Client: HRBC, Kolkata Main Project Features: Construction of Aliah University Campus with (B+G+8) Tower Building with basement, Laboratory & Workshop Block, Library Block, Administrative Block, Auditorium and Utility Buildings like sub-station, Pump House, STP/ETP etc. The Tower Building (B+G+8) have provision of foundation for future extension upto 18 storied Tower Building.The work broadly comprises of piling, pile-cap / raft foundation, Construction of Aliah University Campus with (B+G+8) Tower Building with basement & superstructure work along with sanitary & plumbing work including vertical stack, underground & O/H reservoirs, internal electrification work, supply/erection/commissioning of elevators, supply/installation of A.C. machines, firefighting, water supply & sewerage system, street lighting, landscaping, car parking, Construction of Internal Roads works for proposed Aliah University Campus at New Town, Rajarhat, West Bengal..

Positions held: Dy. Project Manager

10. Name of the Assignment or Project: External Development for VMRF Cancer Hospital Project at Naya Raipur

(Contract Value – Rs.7.47 Crs.).

CV of Saikat Kar

Page 8 of 10

Year: Oct’12 – Jul’13 Location: Naya Raipur Client: Vedanta Medical Research Foundation Main Project Features: Construction of 4Kms. of Interconnected Arterial Roads, Compound Wall, Food Court, Entrance Gate, Metering Room STP, Rain Water Harvesting Tank, & Drainage Works. Positions held: Dy. Project Manager

11. Name of the Assignment or Project: Construction of New School, PTTI Buildings, Hostels & Quarters for School Education Sector in 24 Parganas (South) district of West Bengal - Pkg.- 4 (Contract Value – Rs.61.55 Crs.).

Year: Jun’12 – Feb’14 Location: 24 Parganas (South) district of West Bengal Client: HRBC, Kolkata Main Project Features: Construction of 2/3 storied 6nos. New School buildings, 1no. PTTI Buildings, 6 nos. Hostels buildings for Boys & Girls & 6nos. Staff Quarters - Civil Works, Electrical Works, Water Supply, Plumbing & Sanitary works, Drainage Works & Road works.

Positions held: Dy. Project Manager

Activities performed in all above mentioned Projects (Sl. no. 4 to 11): Project Management - Project Planning with resource management. Mobilization of site infrastructure, Equipment, Material, Manpower. Preparation of Work Completion Schedule in MS Project, Job Cost Report and Cash flow, monitoring of day-to-day activities at site with respect to completion schedule & highlighting the critical areas / area of concern to respective site-in-charge to avoid further delays / variance. Subcontractor identification, evaluation of their rates and taking approval from higher authority wherever required & subsequently generation of work orders of Subcontractors. Regular co-ordination with various departments for timely inputs to fulfil project requirement. Finalization of material requirement with purchase department for timely delivery at site. Follow up with accounts department for release of contractor’s payment. Follow up for Submission of Bank Guarantee to client as per contract clause. Tracking of Bank Guarantees submitted contractors for its release or extension if needed. Follow up with Taxation department for issuance of C-form & IT return of contractor. Follow up with Insurance department for opening insurance as per contract. Follow up for payment of premium. Co-ordinate with site and insurance department in case of any claims in project. 12. Name of the Assignment or Project: Design & Construction of External Water Supply System for BOF and CCP Area (Package -11-14) for 2.5 MTPA New Stream Expansion of IISCO Steel Plant (SAIL) (Contract Value – Rs.110 Crs.).

Year: May’11 to May’12 Location: IISCO Steel Plant (SAIL) at Burnpur, Asansol Client: SAIL Main Project Features: 2nos. Pump House, Scale Pit, Chemical Dose House, Flash Mixer, Clariflocculator, Sludge Thickener, Filter House, 2nos. Elevated storage reservoir, 2nos. Cooling Tower, Electrical Substation, Water transmission & distribution Pipeline System, Construction of 4Km. of Internal Road works. Positions held: Resident Manager

Activities performed: Responsible for supervision of overall execution of site construction activities as per the technical schedule & approved drawings within schedule date, Regular Co-ordination with engineering team for submission of drawing to client for approval, Preparation of Work Completion Schedule in MS Project, Monitoring of project



Contact this candidate