ABDUL HAATHY.S
Experience
********@*****.***
Qualification
B.E Electrical& Electronics Engineering
Mobile
Certificate
Industrial Automation With drives &PLCs
Age & DOB
37 Years & 10/01/1983
SUMMARY:
A self-motivated, hard working person with analytical and problem solving skills, enabling the production of innovative and effective solution in complex situations, Ability to use own initiative and work as a part of a team, whilst under pressure to achieve strict timelines. Good documentation and communication skills.
Over all 12 years of proven Sr. E & I Engineer.
Experience in Construction Management, Quality Management and Project Execution in the field of Integrated infrastructure Project, Power plant Project, Substation, Metro Rail station, High Rise Buildings MEP work and Pipe line work.
Conversant in the construction supervision activities of the project associated with MEP works including, but not limited to following – Medium Voltage and Low voltage System, Plumbing system, Fire Fighting system, Fire Detection system, Elevators, Escalators and Travellators,HVAC, Power supply and Distribution system, Emergency Power system, Lighting system, Emergency Lighting, lighting control system, Lightning Protection, Small power system, Earthing system, Building Automation and Control System .
Perform engineering analysis and develop recommendations and alternatives in the solution of complex problems related to the plants electrical and control system.
All necessary inspections as identified in the approved Inspection and Test Plan ( ITP ), Generate client Requests For Inspection (RFI).
Around 5 years of experience as Sr E & I Engineer
Full time supervision on site so that work may carried out according to drawing and specification.
Conversant with National Electrical Code(NEC), National Fire Protection Association(NFPA),American National Standards Institute(ANSI), Instrumentation, Systems, and Automation Society Standards(ISA), Institute of Electrical and Electronic Engineers(IEEE), International Electrotechnical Commission (IEC), Saudi Aramco Engineering Standards(SAES), Process Industry Practice(PIP), and other International Standards
To coordinate with other sub-contractor and assist the supervising officer with suggestion in construction detail or other problem
Supervision for all Electrical work with respect to Power Distribution System (both High Voltage and Low Voltage) including sub-station, cabling, external and internal lighting to buildings, equipment and machines.
Saudi Council of Engineers – Membership ID 304691
Saudi Arabia- Iqama Transferable
Education Summary:
Qualification
Board / University
Year
% / CGPA
Bachelor of Engineering
Anna University
2003-2007
64%
HSC
National Higher Secondary School
2001–2003
62 %
SSLC
ST Anne’s Higher Secondary school
2001
77%
EMPLOYMENT HISTORY:
Period
Position
Company
Location
Duration
July 2019-Till Date
Sr Electrical Engineer
Marco Construction
Saudi Arabia
1.9 Years
JAN 2019- Mar 2019
Sr Electrical QA/QC Eng
Binyah infrastructure co
Saudi Arabia
0.3 Years
JAN 2016 – Sep 2018
Sr E & I QA/QC Engineer
AL FANAR Construction
Saudi Arabia
2.6 Years
Feb 2014 – Sep 2015
E & I Sr. Inspector
Consolidated Gulf Co.W.L.L
Qatar
1.8 Years
Feb 2012 – Jan 2014
E & I Quality Engineer
GULF ASIA contracting company ltd
Saudi Arabia
2 Years
Nov2010 – Feb 2012
E & I Engineer
M/S ARVIND LTD
Chennai
1.4 years
Jul 2007 – Oct 2010
Electrical site Engineer
M/S GOMS ELECTRICALS PRIVATE LTD
Chennai
3.4 years
Site & QA/QC Experience Summary:
Project
Name of consultant
Client
Duration
Supporting Academic Area and Car Parking
TYPSA Consultant
Al Imam Muhammad ibn Islamic University
JUL19 to Till date
Al Widyan Project Riyadh
SAUD Consultant
Akaria Company
JAN19 to MAR 19
Power Plant – 13 ( SEC – PP-13 )
Worley person
Saudi electricity company (SEC)
JAN 16 to Sep 19
Qatar Petroleum Dukhan Township project ( CAMS )
Consolidated Gulf Co.W.L.L
Qatar Petroleum
Feb 14 to Sep 15
Ma’aden Aluminium Smelter project, Rolling Mill
FLUOR Arabian ltd
Ma’aden
JAN 13 – JAN 14
Ma’aden Aluminium Smelter project,
Green anode plant (GAP), Bath treatment plant and Liquid pitch Terminal ( BTP & LPT)
International Bechtel company ltd
Ma’aden
JUL 12 – DEC 12
Ma’aden Aluminium Smelter project,
Integrated infrastructure project . (IIP)
FLUOR Arabian ltd
Ma’aden
FEB 12 – JUL 12
Southern Region ( CTMPL) AUGMENTATION PROJECT.
M/S ARVIND LTD
INDIAN OIL CORPORATION LIMITE ( IOCL)
NOV 10 – FEB 12
M/s India Land and Properties Ltd
GOMS ELECTRICALS PRIVATE LTD
India Land and Properties
JUL 09 – OCT 10
Mahatma Gandhi Medical College and Hospital Research Institute & Managula Vinayakar Medical College and Research Institute
GOMS ELECTRICALS PRIVATE LTD
Mahatma Gandhi Medical College & Hospital,Managula Vinayakar Medical College and Research Institute
MAR 08 – JUL 09
Chennai metro project( Phase II from Thirumayilai to Velachery)
GOMS ELECTRICALS PRIVATE LTD
Chennai Mass rapid transit system (CMRL)
JUL 07 – MAR 08
Experience Summary:
Project # 1:
Project
Power Plant – 13 ( SEC – PP-13)
Duration
JAN 2016 – SEP 2018
Role
Sr E & I QA /QC Engineer
About Project
POWER PLANT- 13 (1,650 – 1,980 MW CAPACITY OF DOUBLE POWER BLOCK HAVING 3 ON 1 COMBINED POWER CYCLE) INDUSTRIAL BUILDINGS
Responsibilities
Conversant with National Electrical Code(NEC), National Fire Protection Association( NFPA 70 ), SEC Standards TMSS, TES, TCS and GEMSS.
Responsible to prepare all the Inspection Test Plan with respect to the Technical specification documentation.
Preparation of RFI & involved in the Inspection of activities at site for the client final approval.
Prepare the Quality documents such as MOS, ITP and Checklist for E&I activities.
Prepare & maintain all QA-QC documentations including Procedures, MIR, NCR, Pro-actives & Method of statements.
Conduct the Vendor materials inspection for Electrical and Instrumentation materials.
Coordinate all inspections, monitor the required tests and record inspections as per the Contract Plan and Contract Specifications.
Preparation of loop packages and loop checking, pre-commissioning and commissioning as per interconnection wiring diagram, P&ID and as per loop package.
Good knowledge of project quality management systems.
Provide proactive support to the Quality Manager in terms of applying quality management and continual improvement techniques to address specific areas of concerns i.e. workshops etc.
Ensure all the site activities are carried out by following client standards and specifications.
Carry out the inspection of all electrical equipment’s Such as Power HV and MV Transformers, HV and MV Switchgear, MCC, distribution boards,UPS panel,battery,isolators, Electrical Distribution Building 1& 2, Fuel gas compressor building, HRS Electrical Building 1 &2, STG Electrical Building 1 & 2, Central Control Building and Annex Building 1 & 2.
Carry out technical guidance and QA/QC support for procurement activities, technical bide valuation, design reviews during FEED, detailed engineering, procurement, fabrication, testing, installation, commissioning and start-up stages of the project.
Project # 2:
Project
Qatar Petroleum Dukhan Township project
Period
APR 2014 – SEP 2015
Role
Senior Inspector E & I QA /QC
About Project
Structured Cabling System (SCS) and Central alarm monitoring systems & Home security systems ( CAMS )
Responsibilities
Familiar with QA/QC E & I inspection, documentation.
Preparation of quality plans, Inspection and test plan, documentation, procedures, Method statements, test forms & check sheets.
Conversant with National Electrical Code(NEC), National Fire Protection Association(NFPA),American National Standards Institute(ANSI), Instrumentation,
The inspection for Equipment Racks/Cabinets and Field Equipment Enclosures, Fiber Patch Panels, Fiber Optic Patch Cords.
Carry out the inspection of structured cabling system consists of all telecommunications rooms, cabinets, dedicated pathways, active and passive equipment (patch panels, termination panels, etc), and cabling located inside of buildings that distribute services to end users. CISCO” switches and “CISCO” technology .
Carry out the inspection of Wireless ( Smoke Detector, Motion Detector, Window contact & Door contact ), Digital alarm communicator system control panel ( DACS ),
Carry out the inspection of Wireless access point receiver (WAPR )
Project # 3:
Project
Ma’aden Aluminium Smelter project (industrial projects)
Role
JAN 2013 – JAN 2014
Period
Lead E & I Quality Control Engineer
About Project
Ma’aden Aluminium Smelter project - Rolling Mill
Responsibilities
Familiar with specification & standard of aluminum smelter projects
Familiar with Construction activities of electrical and instrumentation.
Familiar with QA/QC E & I inspection, documentation.
Preparation of quality plans, Inspection and test plan, documentation, procedures, Method statements, test forms & check sheets.
Conversant with National Electrical Code(NEC), National Fire Protection Association(NFPA),American National Standards Institute(ANSI), Instrumentation, Systems, and Automation Society Standards(ISA), Institute of Electrical and Electronic Engineers(IEEE), International Electro technical Commission (IEC), Saudi Aramco Engineering Standards(SAES), Process Industry Practice(PIP), and other International Standards .
Familiar with Testing activities prior to pre commissioning .
Carry out the inspection for installation of transformers Nominal System Voltages (34.5KV,33KV,13.8KV,11KV)SG, MCC’s, Panels,devices etc( all type of equipment’s of electrical and instrumentation).
Carry out the inspection for instruments, supports and impulse tubing.
Carry out all Inspection Gas Insulated Switchgear “GIS” 230KV-132KV-115KV, Testing of all electrical equipment’s Such as Transformer, Switchgear, MCC, distribution boards,UPS panel,battery,isolators, Electrical etc.
Carry out the inspection of Motors cable termination ( Star/delta).
Carry out the inspection of all type of control wiring (PLC, Safety, RIO, Controls as per wiring drawing and manufacturer data sheet).
Cause and effective, hook-up, location plan and loop packages.
Calibration of field instrument & solenoid valves control valves FIT, LIT, PDIT, PIT, Temperature Elements, RTD & Thermocouple
Process Control Instrumentation:-Electronic/Micro-processor and Pneumatic Instruments, Instrument Piping, Cabling, DCS/PLC Interface, Loop checking, Instrument Location Plans, Wiring, hook-ups, Hazardous area Instrumentation.
Responsible for inspection of Fire alarm NOTIFIER – HONEYWELL panel ( SD,HD &FD, VESDA VLI Aspirating )detection system.
Project # 4:
Project
Ma’aden Aluminium Smelter project (industrial projects)
Role
July 2012 – DEC 2012
Period
E & I Quality Engineer
About Project
Green anode plant (GAP), Bath treatment plant and Liquid pitch Terminal (BTP
& LPT)
Responsibilities
Familiar with specification & standard of aluminium smelter projects
Familiar with Construction activities of electrical and instrumentation.
Familiar with QA/QC E & I inspection, documentation.
Preparation of quality plans, Inspection and test plan, documentation, procedures, Method statements, test forms & check sheets.
Familiar with Testing activities prior to pre commissioning .
Familiar with Mechanical completion and preparation of turn over books.
Carry out the inspection for installation of transformers, MCC’s, Panels,devices etc( all type of equipment’s of electrical and instrumentation).
Responsible for the inspection of installation of conduits fitting, cable trays/ladder.
Carry out the inspection for instruments, supports and impulse tubing.
Carry out the inspection of temporary arrangement of electrical items.
Carry out all Inspection, Testing of all electrical equipment’s Such as Transformer, Switchgear, MCC, distribution boards,UPS panel,battery
Carry out all Inspection, Testing of cables Such as power (MV, LV),control & instrument cables.
Carry out the inspection of Motors cable termination ( Star/delta).
Carry out the inspection of all type of control wiring (PLC, Safety, RIO, Controls as per wiring drawing and manufacturer data sheet).
Ensure that all installations is carried out to the as per project specification
Responsible for Red mark up drawing as per site modification
Responsible for Closing all Non-Conformities reported within the group, ensuring their correct specification and the effectiveness of corrective and preventive action implemented.
Functional Testing and witness of transformers IR test, winding resistance, polarity...etc
Functional Testing and witness of MCC’s IR test, Bus bar contact resistance(ductor test)
Testing of MV cables HI-POT test
Functional testing & energies of small power circuits as per the functional test sheet.
Testing of cables Such as power (MV/LV),control & instrument cables
Project # 5:
Project
Ma’aden Aluminium Smelter project ( IIP) Integrated Infrastructure Projects
Period
Feb 2012 – July2012
Role
E & I Quality Engineer
About Project
Integrated Infrastructure Projects, Potable and fire water Distribution, pressure reducing and metering stations, Cathodic protection NAG line, Nominal System Voltages (34.5-33-13.8-11) kV.
Responsibilities
various projects in field of Construction, Project Management,Quality Assurance/Quality Control in Electrical & Instrumentation Cathode Protection System for pipelines (Onshore on both oil & gas and Industrial Projects) including Electromechanical activities.
Conversant with National Electrical Code(NEC), National Fire Protection Association(NFPA),American National Standards Institute(ANSI), Instrumentation, Systems, and Automation Society Standards(ISA), Institute of Electrical and Electronic Engineers(IEEE), International Electro technical Commission (IEC), Saudi Aramco Engineering Standards(SAES), Process Industry Practice(PIP), and other International Standards
Excellent in domain expertise in project management, supervision and implementation.
Proficient in Quality Management System and ITPs for Electrical & Instrumentation & Control System, Communication System and Low Current work.
Review company procedure, standards & specification, industry codes and relevant standard drawings for project implementation and before performing actual field inspections for acceptance of the work
Assures that all Electrical & Instrumentation activities conforms to the Saudi Mining standards wherein taking considerations of the installations and guidelines of the international standards.
Prepare and submit correspondence, transmittal, technical report, work completion report, method statement, shop/as- built drawing
Site inspection and respective documentation and control..
Preparation of inspection record submitting the same to client for inspection request
Conduct inspection with the client as pre approved ITP, Method Statement in accomplished with project specifications.
Monitor inspection and quality control program.
Responsible for assuring compliance with the approved quality control plan for constructions, inspections & testing activities.
Maintain all relative site inspection records for handling over to client upon completion.
Calibration of field instrument & solenoid valves control valves FIT, LIT, PDIT, PIT, Temperature Elements, RTD & Thermocouple, plants in pressures, temperature, flow & Level, pressure switch, level trans meter with PLC.
Cause and effective, hook-up, location plan and loop packages.
Responsible for inspection of Fire alarm NOTIFIER – HONEYWELL panel ( SD,HD &FD) detection system .
Honey well Gas detector XCD sensors. Detecting flammable gas,toxic gas, oxygen . Using electro chemical cell (ECC) technology
Conduct inspection of materials or equipment’s when requested by material controller.
Performed project inspection, surveillance and monitoring, witnessed for the on going construction activity, and issued corrective action (NCR) against construction group for further action whenever standard violation found throughout the duration of project.
Project # 6
Project
INDIAN OIL CORPORATION LIMITE ( IOCL) Pipe Line Project
Period
E & I Engineer
Role
Nov 2010 – Feb 2012
About Project
Construction supervision, Inspection, Testing & Commissioning of HV/LV Electrical
Equipments Gas Insulated Switchgear “GIS, Power Systems, and Instrumentation
for Oil, Gas, Petro- chemicals Plants, Refineries and Water Projects. Hazardous
Area Electrical and Instrumentation and Telecom Equipment's and Installations .
Responsibilities
Managing site design changes and interface engineering of different Contractor's designed packages. Approve the site design changes originated for construction/installation reasons. Ensure that all Technical Queries and Site Queries are properly and timely resolved. Technical support in Concession Request, Project Change Notice and Claims
Process Control Instrumentation:-Electronic/Micro-processor and Pneumatic Instruments, Instrument Piping, Cabling, DCS/PLC Interface, Loop checking, Instrument Location Plans, Wiring, hook-ups, Hazardous area Instrumentation.
Construction supervision, Inspection, Testing & Commissioning of HV/LV Electrical Equipments, Power Systems, and Instrumentation for Oil, Gas, Petro- chemicals Plants, Refineries and Water Projects. Hazardous Area Electrical and Instrumentation and Telecom Equipment's and Installations,
Process Control Instrumentation:-Electronic/Micro-processor and Pneumatic Instruments, Instrument Piping, Cabling, DCS/PLC Interface, Loop checking, Instrument Location Plans, Wiring, hook-ups, Hazardous area Instrumentation.
OIL & Water Separation plants, petrochemical,plants in pressures, temperature, flow & Level, pressure switch, level trans meter with PLC
Cause and effective, hook-up, location plan and loop packages.
Supervision of laying and termination of control cables,network cables(CAT5,CAT6,OFC,Singal-mode&Multimode) and system cable .
Routine Inspection of installations and testing activities Follow standards and procedures
Provide Engineering supports and co-ordination with project team.
Attending weekly meeting with Subcontractor management Team to review Construction and Quality monitoring.
Prepare the quality observation report to construction mentioning the fault category and advise construction for repair work as per requirement and standard
Carry out the inspection for instruments, supports and impulse tubing
Carry out the inspection of temporary arrangement of electrical items
Carry out all Inspection, Testing of all electrical equipments Such as Transformer, Switchgear, MCC, distribution boards,UPS panel,battery,isolators, Electrical hoist and Generator etc.
Carry out all Inspection, Testing of cables Such as power (MV/LV), control & instrument cables
Responsible for inspection of HV cable splicing and termination using termination kit
Carry out the inspection of Lighting, small powers,welding and power sockets..ect
Carry out the inspection of Motors testing and cable termination ( Star/delta)
Inspection of overall power and lighting distribution for industrial area and buildings
Carry out the inspection of all type of control wiring (PLC, Safety, RIO, Controls as per wiring drawing and manufacturer data sheet)
Responsible for inspection of Fire alarm( SD,HD &FD)detection system.
Responsible for inspection HVAC system (all inspection)
Ensure that all installations is carried out to the as per project specification, applicable codes of Practices and standards.
Responsible for Red mark up drawing as per site modification.
Responsible for As built drawing in AutoCAD.
Co-ordination with planning engineer to make sure the all E&I activities
Responsible for evaluating all Non-Conformities reported within the group, ensuring their correct specification and the effectiveness of corrective and preventive action implemented .
Project # 7
Project
M/s India Land and Properties Ltd, High Rise Buildings MEP Project
Period
Electrical site Engineer
Role
Nov 2010 – August 2011
About Project
Electrical Installation, Testing, Commissioning, Approval of Vendor
drawings- generator system protection and control, GIS substation schemes,
Low/High Voltage Switchgear, Bus Ducts, MCCs, DBs, switchgear interface
panels, Air Conditioning and Ventilation (HVAC) panels.
Responsibilities
Electrical Equipment Installation for GA, Floor Openings, Panel Fixing arrangement Layouts, Lighting, Lightning, Earthing, Conduit routing layouts, Cable Schedule, Cable tray routing Layouts, Bus duct.
Full time supervision on site so that work may carried out according to drawing and specification.
Check the work constantly against drawing and specification.
Review of vendor GA /schematic drawings for transformer, bus duct, control panel, relay panel, HT, LT switchgear, motor and switchyard equipment’s .
Check Electrical materials proposed to be used and see that they conform to specification and drawing.
Develop product development schedule, track progress, and make task adjustment as ne cessary to maintain schedule commitments
To coordinate with other sub-contractor and assist the supervising officer with suggestion in construction detail or other problem .
Inspect the integrity of the electrical installation works in line with
the typical installation / design works practices especially in critical
equipment on switchgears, cabling, earthing and bonding .
Project # 8
Project
Mahatma Gandhi Medical College & Managula Vinayakar Medical College
and Research Institute
Period
Mar 2008 – Jul 2009
Role
Electrical site Engineer
About Project
Electrical Installation, Testing, Commissioning of multi-pole structures, sub-station
Low/High Voltage Switchgear, Bus Ducts, MCCs, DBs, switchgear interface
panels,
Responsibilities
Supervision for all Electrical work with respect to Power Distribution System (both High Voltage and Low Voltage) including sub-station, cabling, external and eternal lighting to buildings, equipment and machines,
Operating and switching during the power distribution, load shedding schedule of power interruption and testing,
Check Electrical materials proposed to be used and see that they conform to specification and drawing
Develop product development schedule, track progress, and make task adjustment as necessary to maintain schedule commitments
To coordinate with other sub-contractor and assist the supervising officer with suggestion in construction detail or other problem
Completion of exception lists item prior to start-up.
Check incoming and outgoing stocks,Balance all account from incoming stock and outgoing stocks before closing all the deli- very every day
Supervise of Cable Termination for low, medium voltages,
Ordered Stocks/ Delivery Status follow-up, Monitoring of stock request,
Project # 9
Project
Chennai Mass rapid transit system Phase II Chennai Metro Rail Limited (CMRL)
Period
July 2007 to Mar 2008
Role
Electrical site Engineer
About Project
Electrical Installation, Testing, Commissioning of
sub-station . LV/High Voltage Switchgear, Bus Ducts, DBs.
Responsibilities
Erection, Electrical Installation, Testing, Commissioning, MV installations, diesel generating set, bus ducts, cabling Panel board, lighting yard lighting, earthing, lightning arrestors material planning of all types of electrical equipment in the site.
Executes the specific inspection on materials, equipment and construction/installation activities on site.
Check the work constantly against drawing and specification.
Check Electrical materials proposed to be used and see that they conform to specification and drawing.
Carry out all Inspection, Testing of all electrical equipments Such as Transformer, Switchgear, MCC, distribution boards,UPS panel,battery,isolators, Electrical hoist and Generator etc.
Responsible for Red mark up drawing as per site modification
Responsible for inspection of Fire alarm NOTIFIER – HONEYWELL panel ( SD,HD &FD) detection system.
Develop product development schedule, track progress, and make task adjustment as necessary to maintain schedule commitments
Personal Vitae:
Parents Name : Mr. R Santhanam and Mrs. S Lakshmi
Passport Number : M4812651
Passport Validity : 07/03/2025
Date of Birth : Jan 10th 1983
Nationality : Indian
Sex : Male
Marital Status : Married
Languages Known : English and Tamil.
Contacts : +966-*********,