Nour Mohamed Ibrahim
SUMMARY
Experienced Valve technician with over sixteen years of experience in
valves repair and maintenance industry and a demonstrated hands- on experience. Excellent reputation for resolving problems and improving customer satisfaction. Currently, I am working at BP WND on PSVs project with Team Inc./DNOW to achieve level 3 qualification in safety valve recertification according to AMSE standard where I am at level 2 currently.
W O R K E X P E R I E N C E
Valve Technician
Distribution Now: A u g u s t 2 0 2 0 ـApril 2023
Apply the DNOW HSE of safe operation, code of conduct core values.
Comply with customer HSE, Quality policies and procedures whilst on site/customer location.
Comply with legal and regulatory requirements in the state, country, or territory where work is being conducted.
Deliver product and service quality to customer in safe manner and meeting customer expectation for both onsite and Workshop.
Trouble shoot and resolve problems quickly and effectively on a wide range of valve type including pressure safety valve and control valve.
Qualify to perform valve strip down for API 6D manual & Actuator valve and provide inspection report.
Capability to perform pressure Testing for Hydro test as per API 598/6D.
Perform line walk and valve inspection onsite and provide inspection report.
Capability to maintain tools and equipment (assets).
Generate daily report related to the scope of work. Valve Technician
Valves Engineering Company VEC: M a r 2 0 2 0 ـJ u l 2 0 2 0
Valve inspection prior start for valve repair activity
Valve repair activity for ball, gate, butterfly, check, plug, globe, and control types by hands on for dismantling, polishing, cleaning, lapping and reـassembling.
Perform hydro and gas testing as per standard after repair process. CONTACTS:
Address: Mit Ghamr, Dakahlia,
Egypt
Mobile: +201*********
E-mail:
***********@*****.***
SKILLS:
o Communication Skills
o Time Management
o Excellent interpersonal
skills
Storage and Preservation the valve after repair and test process.
Shipment preparation and coordination with material team. Valve Maintenance Technician
GS Engineering & Construction co.: M a y 2017 ـF e b 2 0 2 0
Valve online repairing including prevention of gland packing and external body leaking.
Dismantling valves from the site for repairing on the workshop and reinstalling again.
Valve inspection prior start for valve repair activity.
Valve repair activity for ball, gate, butterfly, check, plug and globe types by hands on for dismantling, polishing, cleaning, lapping and reـassembling.
Perform hydro and gas testing as per standard after repair process.
Assisting in Material control activities of commissioning team. Material Controller & Pipe Fitter
MEGA Project Management, Siemens Burullus Power Plant, Egypt: A u g 2 0 1 6 ـA p r 2 0 1 7
Installing the pipe spools and valves including joint the flange connection.
Coordinating with foreman for welder availability and QC after weld joint completed.
Pipe support installation as isometric and support detail drawing at site.
Reporting to the foreman or pipe engineer if any pipeline clash/obstruct with others such as cable tray.
Assisting in Material control activities of air intake filter. Material Controller
GS Engineering & Construction co.: S e p 2015 ـJ u l 2016
Arrange warehouse logistics according to the instructions of the Site Manager.
Manage information relevant to arrival of materials at site and their availability at the warehouse.
Co-ordinate the availability of shipping documentation and feed the warehouse data base with proper information.
Co-ordinate any necessary action to support customs clearance of materials.
Manage the receiving, check, storage and preservation of materials delivered at Site.
Manage the receiving, check, recording and traceability of material certificates.
Issue any supply non-conformities and follow-up the relevant resolution.
Initiate procedures concerning insurance claims for damage to materials during transport to Site or during erection.
Start the application for insurance claims related to materials damaged during transportation or erection.
Initiate claims against vendors for missing materials and/or non- conformity with the relevant purchase order.
Material Controller & Pipe Fitter
MEGA Project Management, West Damietta Power Plant, Egypt: N o v 2014 ـA u g 2 0 1 5
Installing the pipe spools and valves including joint the flange connection.
Coordinating with foreman for welder availability and QC after weld joint completed.
Pipe support installation as isometric and support detail drawing at site.
Reporting to the foreman or pipe engineer if any pipeline clash/obstruct with others such as cable tray.
Assisting in Material control activities of air intake filter. Valve Technician Assistant
DOOSAN Heavy Industries & Construction, Egypt: A u g 2 0 1 2 ـ O c t 2 0 1 4
Perform valve repair activity for ball, Underground Gate, Butterfly, and check valves as per team leader instruction
Covering for strip down the valve, cleaning, polishing, lapping, inspection of internal and valve re ـassembly.
Ensure the consumables required for valve activity is adequate.
Assist team leader to do tooling maintenance including recording
Assisting in Material control activities of air boiler and steel structures Material Control Assistant
IEMSA Construction, MOPCO 1&2, Egypt: ( A p r 2 0 0 6 ـS e p 2007) & ( A p r 2 0 1 0 ـN o v 2 0 1 1 )
Preparing materials receiving notes.
Inspection, storage, and preservation the materials as per project specification.
Barcoding System.
Spool movement coordination.
Coordination for the audit related with materials Pipe Fitter
Petrojet, Methanex Corporation, Egypt: F e b 2 0 0 8 ـM a r 2 0 1 0
Receiving the materials to be fabricated into spools and pipe supports.
Cutting and fit up the materials as per drawing provided by supervisor.