Post Job Free
Sign in

Mechanical Engineer Engineering

Location:
Al Dafna, Qatar
Salary:
10k
Posted:
May 16, 2024

Contact this candidate

Resume:

ABDULJAWAD - Mechanical Engineer - MMUP/UPDA CERTIFIED - Seven Years’ Experience

DOB: 23/03/1991 Mobile: 77848479 Email: ad5qyj@r.postjobfree.com Qatar ID: 291******** Driving License: LTV Address: Old Al Ghanim Doha Sponsorship: Abu Saqar Cont & Transportation Visa Profession & Status: Engineering & Transferable Working Visa Pakistan Objective

Urgently seeking a full-time job as a Mechanical Engineer in line with my work experience and education and welcome any career related opportunities.

Work Experience

Project Title: AL- HABARI REHABILITATION BULDING ZUBARA 28 FEBRUARY 2022 to 30 APRIL 2023 Client: MOECC

Main Contractor: Arkit Trading & Contracting W.L.L Project Title: MOSQUE & IMAM HOUSE 880 NAUIJA 01 APRIL 2021 to 30 MARCH 2022 Client: MINISTRY OF AWQAF & ISLAMIC AFFAIRS

Main Contractor: Arkit Trading & Contracting W.L.L Project Title: Bin Al Sheikh Tower 01 May 2021 to 29 May 2022 Client: Bin Al Sheikh

Contractor: Jtc al Jaber trading & contg.co

Sub-Contractor: Arkit Trading & Contracting W.L.L

Project Title: MOSQUE & IMAM HOUSE 864 DAFNA 27 MAY 2021 to 30 JUNE 2022 Client: MINISTRY OF AWQAF & ISLAMIC AFFAIRS

Main Contractor: Arkit Trading & Contracting W.L.L Project Title: EXTENSION OF CIVIL DEFENSE FIRE STATION BULDING SHAHNIYA 09 JUNE 2021 to 30 JUNE 2022 Client: MOI

Main Contractor: Arkit Trading & Contracting W.L.L Summary of Job duties:

Site Mechanical Engineering role

Mechanical Engineering role for, Plumbing Drainage & HVAC Heat Ventilation and Air Conditioning.

Preparing of material submittals inspection report for all upcoming material.

Plan and execute the work on daily basis.

Report to senior and client on daily basis.

Solving the technical problem of supervisor.

Taking care that work is executing at site by considering safety, quality.

Handling internal and external material inspection and quality.

Testing and commission of Copper, PPR HDPE and UPVC pipe.

Checking the pipe support reducer’s joints perfect insulation without leakage.

Ensure that the work to be as per standards, by maintaining quality and safety.

Responsible of pipeline connection of Sub-Mersible, Booster and irrigation pumps as per design.

Arrange stage wise inspection as required and get the clearance from complete.

Installation of 50mm,82mm, 110mm, 160mm HDPE PIPE for main water supply line from kaharmaa.

Installation of 15mm,22mm,28mm, 54mm PPR, COPPER for CWS Cold Water Supply, and HWS Hot Water Supply.

Installation of WHA Water Hammer Arester for Pressure control of water.

Installation of EWH Electric Water Heaters with Gate valves.

Installation of Booster pumps for main water tank to roof water tank.

Installation of Pressure Reducer valve.

Installation of Pressure NRV non return valve

Installation of UPVC Pipes (160mm) for main drainage systems

Installation of UPVC Pipes (110mm) for EWC and IWC toilet drainage and rain water systems

Installation of UPVC Pipes (82mm and 50mm) for wash basin waste water drainage systems.

Installation of high-pressure pipe for HVAC drainage water system.

Installation of Accessories fittings (90, 45 elbow & T elbow, P Trap, Reducer and socket) for joining of silent piping system.

Installation of channel and thread Rod (10mm 8mm) for supporting of the Silent, Copper and PPR Pipes system.

Used split clams for support of the silent pipe system.

Installation of FCU Fan Coil Units, Supply Ducts, Fresher Air Ducts, Return Air Ducks, VCD Volume Control Dumper.

Installation of FD Fire Dumper, Thermostat, Access Panel in Cleaning, Supply/return Linear Slot diffuser.

Installation of Bell-Mouth and Wire-Mesh, Exhaust Fresh Air Fan.

Installation of Sprinklers, Smoke detectors, Emergency Lights, Sound systems, Hose Reeling. Work Experience

Project Title: Lusail Control &Command Center (LCCC BP27 Lusail City) 01 January 2021 to 08 May 2021 Client: Lusail Real Estate Development Company.

Contractor: Redco Trading and Contracting International.W.L.L Summary of Job duties:

Site Mechanical Engineering role

Mechanical Engineering role for, Plumbing Drainage & HVAC Heat Ventilation and Air Conditioning.

Preparing of material submittals inspection report for all upcoming material.

Plan and execute the work on daily basis and report to senior and client on daily basis.

Solving the technical problem of supervisor.

Taking care that work is executing at site by considering safety, quality.

Handling internal and external material inspection and quality.

Testing and commission of Copper, PPR HDPE and UPVC pipe.

Checking the pipe support reducer’s joints perfect insulation without leakage.

Ensure that the work to be as per standards, by maintaining quality and safety.

Responsible of pipeline connection of Sub-Mersible, Booster and irrigation pumps as per design.

Arrange stage wise inspection as required and get the clearance from complete.

Installation of 50mm,82mm, 110mm,160mm HDPE PIPE for main water supply line from kaharmaa.

Installation of 15mm, 22mm, 28mm, 54mm PPR, COPPER for CWS Cold Water Supply, and HWS Hot Water Supply.

Installation of WHA Water Hammer Arester for Pressure control of water.

Installation of EWH Electric Water Heaters with Gate valves.

Installation of Booster pumps for main water tank to roof water tank.

Installation of Pressure Reducer valve.

Installation of Pressure NRV non return valve

Installation of UPVC Pipes (160mm) for main drainage systems

Installation of UPVC Pipes (110mm) for EWC and IWC toilet drainage and rain water systems

Installation of UPVC Pipes (82mm and 50mm) for wash basin waste water drainage systems.

Installation of high-pressure pipe for HVAC drainage water system.

Installation of Accessories fittings (90,45 elbow & T elbow, P Trap, Reducer and socket) for joining of silent piping system.

Installation of channel and thread Rod (10mm 8mm) for supporting of the Silent, Copper and PPR Pipes system.

Used split clams for support of the silent pipe system. Work Experience

Project Title: Onshore project. Maintenance of Gas Turbine. 01 January 2020 to 30 December 2020. Client: RGPC (RAS GIRTAS POWER COMPANY).

Contractor: Redco Trading and Contracting International.W.L.L Summary of Job duties:

Senior Mechanical Technician

Disassembling and Assembling of Gas Turbine. 1,4,5,8.

Disassembling and Assembling the casing of GT (1,4,5,8).

Disassembling and Assembling the fuel pipes system.

Disassembling and Assembling the Nozzles system of GT (1,4,5,8).

Disassembling and Assembling The blades of GT (1,5,4,8).

Disassembling and Assembling the fingers of GT.

Disassembling and Assembling the assigned ring and clean and measurement between 1to 2upto 39to40.

Disassembling and Assembling Isolation rings and clean and measurement between 1to 2 up to 60to61.

Disassembling and Assembling the main router of generator.

Disassembling and Assembling the 3phase of Motor. Which is using for router of generator.

Disassembling and Assembling the Generator Hydrogen Gas cooler system.

Generator Hydrogen Gas cooler leakage test.

Disassembling and Assembling Vapors Extractor Motor. Which is using for GT lube oil reservoir.

Disassembling and Assembling GT lube oil Heater system.

Disassembling and Assembling the potable water pumps, heater suction side and discharge side all valves positioned checked.

Work Experience

Project Title: North Field Expansion Project. Onshore Facilities NFE-ESW. 01 January 2019 to25 December 2019. Client: Qatar Gas Operation Company limited.

Contractor: CCC (Consolidated Contractor Group).

Sub-Contractor: .Redco Trading and Contracting International.W.L.L Summary of Job duties:

Site Mechanical Engineering role

Mechanical Engineering role for, Plumbing Drainage & HVAC Heat Ventilation and Air Conditioning.

Preparing of material submittals inspection report for all upcoming material.

Plan and execute the work on daily basis.

Report to senior and client on daily basis.

Solving the technical problem of supervisor.

Taking care that work is executing at site by considering safety, quality.

Handling internal and external material inspection and quality.

Testing and commission of Copper, PPR, HDPE and UPVC pipe.

Checking the pipe support reducer’s joints perfect insulation without leakage.

Ensure that the work to be as per standards, by maintaining quality and safety.

Responsible of pipeline connection of Sub-Mersible, Booster and irrigation pumps as per design.

Arrange stage wise inspection as required and get the clearance from complete.

Installation of 50mm, 82mm, 110mm, 160mm HDPE PIPE for main water supply line from kaharmaa.

Installation of 15mm, 22mm, 28mm, 54mm, PPR, COPPER for CWS Cold Water supply, and HWS Hot Water Supply.

Installation of WHA Water Hammer Arester for Pressure control of water.

Installation of EWH Electric Water Heaters with Gate valves.

Installation of Booster pumps for main water tank to roof water tank.

Installation of Pressure Reducer valve.

Installation of Pressure NRV non return valve

Installation of UPVC Pipes (160mm) for main drainage systems

Installation of UPVC Pipes (110mm) for EWC and IWC toilet drainage and rain water systems

Installation of UPVC Pipes (82mm and 50mm) for wash basin waste water drainage systems.

Installation of high-pressure pipe for HVAC drainage water system.

Installation of Accessories fittings (90, 45 elbow & T elbow, P Trap, Reducer and socket) for joining of silent piping system.

Installation of channel and thread Rod (10mm 8mm) for supporting of the UPVC, Copper and PPR Pipes system.

Used split clams for support of the silent pipe system.

GI clams for support of the UPVC pipe and GI pipes system.

Installation of Ductile iron pipes used for the electrical cables lighting system.

PVC Trunking installation for the outdoor HVAC system and drainage water pipe system. Work Experience

Client: Ooredoo Telecommunication 10 January 2018 to28 December 2018. Project:5GSwap

Contractor: ERICSSON

Sub-Contractor: MIKROLINKTelecommunication

Summary of Job duties:

Warehouse Quality control Engineer (DHL and Mikrolink Warehouse) 2018 to 2019

QC Materials Engineering role for as project.

Maintain receipts, records, and withdrawals of the stockroom ERICSSON Materials.

Receive, unload, and shelve supplies

Ensure adequate record keeping and manage all documentation to confirm proper stock levels and maintain inventory control

Perform other stock-related duties, including returning, packing, pricing, and labeling supplies

Ensure adequate record keeping and manage all documentation to confirm proper stock levels and maintain inventory control

Ability to safely and legally operate a forklift

Developed weekly and daily work schedules for warehouse team.

Coordinated deliveries and pickups of ERICSSON and NOKIA materials.

Execute manufacturing process as per batch record and documentation, packaging record.

Prepared project analysis reports and provide project updates to clients.

Good knowledge in NOKIA materials and ERICSSON materials.

Prepared (SMR) Site materials requirement and (MRF) materials return forms.

Daily Based prepared Dismantle materials tracker and new materials tracker.

Make day to day planning weekly as well as monthly wise and monitor the progress at site.

Trace the material that all the material delivered to us is exactly same as per the drawings & project specification.

Report to senior and client on daily basis.

Check and monitor the material requirement as per release.

Inspected and tested equipment.

Sourced, purchased, and installed new equipment and components.

Maintained optimal function via planned upgrades regular service.

Upgrade company productivity by integrating existing telecommunications to function on a unified platform.

Prepared reports and documentation for ongoing projects and service calls.

Arranged meeting with the managers as well as team members to ensure goals are achieved

Per the requirement.

Work Experience

Project Contractor: ARHAMA JAHMA AL KUWARI &BROS.CO. (AJK) QATAR. O1 January,2017 to 25 December 2017. Client: Muhammad Bin Hamad.

Contractor: I Construct Trading & contracting

Consultant: Arab Engineering Bureau (AEB)

Project Name: Holiday in Staff Accommodation @ Abu Sidra Summary of Job duties:

Site Mechanical Engineering role

Mechanical Engineering role for, Plumbing Drainage & HVAC Heat Ventilation and Air Conditioning.

Preparing of material submittals inspection report for all upcoming material.

Plan and execute the work on daily basis.

Report to senior and client on daily basis.

Solving the technical problem of supervisor.

Taking care that work is executing at site by considering safety, quality.

Handling internal and external material inspection and quality.

Testing and commission of Copper, PPR, HDPE and UPV pipe.

Checking the pipe support reducer’s joints perfect insulation without leakage.

Ensure that the work to be as per standards, by maintaining quality and safety.

Responsible of pipeline connection of Sub-Mersible, Booster and irrigation pumps as per design.

Arrange stage wise inspection as required and gat the clearance from complete.

Installation of 50mm, 82mm, 110mm, 160mm HDPE PIPE for main water supply line from kaharmaa.

Installation of 15mm, 22mm, 28mm, 54mm PPR, COPPER for CWS Cold Water Supply, and HWS Hot Water Supply.

Installation of WHA Water Hammer Arester for Pressure control of water.

Installation of EWH Electric Water Heaters with Gate valves.

Installation of Booster pumps for main water tank to roof water tank.

Installation of Pressure Reducer valve.

Installation of Pressure NRV non return valve

Installation of UPVC Pipes (160mm) for main drainage systems

Installation of UPVC Pipes (110mm) for EWC and IWC toilet drainage and rain water systems

Installation of UPVC Pipes (82mm and 50mm) for wash basin waste water drainage systems.

Installation of high-pressure pipe for HVAC drainage water system.

Installation of Accessories fittings (90,45 elbow & YEE TEE, P Trap, Reducer and socket) for joining of silent piping system.

Installation of channel and thread Rod (10mm 8mm) split clams for supporting of the Silent, Copper and PPR Pipes system. Education Qualification

Bachelor of Technology (Honours) in Mechanical 4Years, Sarhad University of Science & Information Technology Peshawar 2016.

Bachelor of Sociology, University of Peshawar, 2015.

Diploma of Associate Engineering in Mechanical 3Years, Government College of Technology Peshawar, 2012. COMPUTER SKILLS.

MS. OFFICE

AUTO CAD



Contact this candidate