Post Job Free
Sign in

Project Manager Quality Control

Location:
Colorado Springs, CO
Posted:
May 16, 2024

Contact this candidate

Resume:

JIM WALLACE

719-***-**** • ad5qv7@r.postjobfree.com

WORK EXPERIENCE

Richmond American Homes 2021-2023

Project Manager Special Projects

My role was to handle any and all warranty and home owner disputes.

RK Mechanical, UC Health Hospital Denver 2019 – 2021

Mortenson Quality Control Manager

●Managed quality control, final inspections, preliminary budgets, and deliveries.

●Responded to RFQs and RFPs based on conceptual drawings and narratives.

●Visualized complete systems and produced complete qualified budget estimates.

●Satisfied project ownership, design team and owners’ expectations to a level that ensured future design build/design assist opportunities.

●Initiated and maintained relationships with client and A/E contacts to facilitate successful preconstruction process through client-initiated meetings and ceremonial events.

●Identified and integrated cost effective design solutions based on owner, design team, and sub-contractors various needs and budget requirements.

●Developed overall scope of work and budget pricing from RFP schematic drawings and conceptual narratives in design build or design assist format.

●Conducted sales presentations with higher-level customer executives as appropriate.

●Assured that potential risk factors were evaluated and reviewed with senior management.

●Determined competitive bid based on appropriate measure of profit margin and other factors.

●Utilized internal budget estimating templates to develop and maintain budget.

●Enlisted key equipment vendors and subcontractors to provide technical and costing support.

●Identified and presented value-engineering opportunities.

●Supported Project Manager as required during the construction phase.

M&K,Plumbing San Pedro, CA 1996 - 2019

Sir Project Manager/Vice President Head of Field Operations

●Managed negotiation, budgeting, contracts, material take-off, and design support.

●Reviewed bid documents and proposals to determine scope of work and describe bids.

●Assisted project managers for change orders, as-built drawings, and submittals.

Prior Experience: Newline Development, Vice President 1992-1996

TECHNOLOGIES & LICENSES

Licenses: OSHA 30-Hour, Raise Floor Cold Air & Process Chilled Water Data Center Aspects,

CA General Engineering License, CA Underground Fuel Tank Removal & Installation, Environmental Management Technical & Regulatory Aspects, CA C-36 Plumbing Contractor License.



Contact this candidate