CHRISTOPHER GOODZERA
********************@*****.***
Date of Birth: 25th of March 1973. Citizenship: Zimbabwe
Marital Status: Married
Stand 129 Charlottes Brooke, Borrowdale Estates, Harare, Zimbabwe
Cell number +263-***-***-***
OBJECTIVES
Contribute to sustainable plant Operations, Project and Construction management maximizing resources
EDUCATION
1997 BSc Honours Mechanical Engineering
University of Zimbabwe
SKILLS AND TRAINING
MS Project Expert - Cost handling, tracking and Reporting
AutoCAD/ McLaren - team collaboration and reviews
SAP / SAGE/ MAXIMO ERP
ROOT CAUSE FAILURE ANALYSIS - GIBS
CHANGE MANAGEMENT-GIBS
STREAMLINED RELIABILITY EXPERT
MAINTENANCE BUDGETING AND COST CONTROL
Maintenance Development Program – GIBS
Financial Management for Engineers
MEMBERSHIP
Zimbabwe Institute of Engineers – Corporate Member
HOBBIES
Fishing
Golf
PROFESSIONAL EXPERIENCE
Maintenance Consultant Feb 2024 – Current
Streamlined Reliability Training and Implementation for a Fast Moving Consumer Goods company.
Preparation of Operations and Maintenance Contract proposal
Khayah Cement Zimbabwe ( Formerly Lafarge Cement Zimbabwe)
Preventative Maintenance Manager
July 2023- Jan 2024
Joined Khayah Cement (formerly Lafarge Holcim Zimbabwe) on Fixed Term Contract in charge of Maintenance Planning and Management.
Review and benchmark prevailing plant performance versus Historical performance and pinpoint mallards and their solutions: Major issues being
oPoor plant reliability due to unimplemented integrity shutdown recommended by previous owners.
oHigh number of recurring breakdowns with attributable Maintenance cost above benchmarks
oHigh cost of Maintenance spares due to unavailability of adequate inventory and outdated sourcing practices
Maintenance Master Plan preparation and improvement of Planned Maintenance Routines. Scheduling and cost control.
Maintenance Budget preparation in view of Maintenance Master Plan and Planned Shutdown Plan.
Minimise Planned Maintenance Routines (Inspections and Scheduled down days) by applying Reliability Centered maintenance techniques.
Equipment Inspection routines optimisation and improvement by incorporation of SCADA system and plant control system reports
Setting Planned Maintenance Routines ( Inspection, Condition Monitoring) for key equipment based on Initial Conditions.
Improved inspection role to include resources planning for identified work
Planning function role in picking up work identified by Inspection and
oPredation of job plan to execute the works including Hazard Identification and Risk Assessment (HIRA)
oIdentifying materials ( spares, consumables) required for specific tasks and work
oIdentifying skills, equipment, tooling and contractors for work activities
oPreparation of Work Cost and budget
oReleasing work orders and job packages into Backlog for all Planned Work.
oManaging the Plant Scheduling Meeting to coordinate execution of Work.
oReporting and analysis of plant performance and costs
oPareto analysis of downtime and carrying out Root Cause analysis of
o Planning and coordination of kiln shutdowns
oDaily tracking and reporting of Kiln shutdowns to plant and plant management
Training and Development of junior engineers
Coaching and leadership of Maintenance groups
Coordination of plant wide planning meetings
Inspection of Vertical Cement Mill after catastrophic breakdown, preparation of restoration project plan.
Execution of the Mill repairs and restoration with Original Equipment manufacturers experts
Resolved Quarry Symons Crusher chronic oil loss problem, reduced operating cost and improvement Reliability and throughput
Management of Cement Milling Operations contractor key performance indicators
Mothballing plan and implementation on the Raw Meal Preparation and Clinker Production due to relatively lower priced imported clinker
Preparation of Insurance Claim documentation following Catastrophic failure on Vertical Cement Mill
Carrying out Root Cause Failure Analysis of the Vertical Cement Mill
Agipace Services, Harare
Operations Manager – February 2021 – July 2023
Labour contracting
Preparations of tender bids
EPCM Project Manager Zimbabwe Power Company Limestone Unloader equipment for Stage 3 desulfurization plant.
oSite layouts and detailing of the installation drawings
oMethod statements covering Risk Assessments, Lifting Plans, QA/QC plans, Project Plan
oSupervision Erection and Commissioning
oHandover to Client
Lafarge Holcim Zimbabwe
Maintenance Consultant – September 2020 to February 2021
I was engaged to assist the plant improve Quarry Plant Utilisation Factor
Audit of Quarry plant maintenance status through Pareto analysis of Downtime, Predictive Inspections and test reports
Action Plan and implementation Plan changing Organisation and Reliability and Capex plan
Carried out and Supervised Recurring Corrective Maintenance to improve Basic Plant Condition
J&C Engineering 273 Fleming Road, Meadowdale, Johannesburg, South Africa
Construction Manager Sept 2015 – July 2019
J&C Engineering is the leading player in dust extraction system installations for the power sector, cement industry, mining and paper industry in South Africa.
I had a dual role of Construction Manager and Zimbabwe Country Representative. I managed 3 major projects among other smaller Construction projects, procurement and supply and Maintenance Contract assignments:
Zambia - Mopani Copper Mines Electrostatic Precipitator Rebuild for the Copper Smelter – Feb 2016 to July 2016 - US$1.5million
Zimbabwe - Lafarge Cement Harare Electrostatic precipitator rebuild after explosion – June 2016 – November 2016 – US$5 million
Zimbabwe - Zimplats Electrostatic precipitator annual overhauls – US$100k
Zimbabwe - Lafarge Cement Harare Hot air ducts - US$900k
Zambia – Mopani Copper Mine rebuild after explosion – 15 MUSD
Roles and responsibilities
From the time a project is secured I am involved in preparations of the key project faucets of Safety, Materials, Manpower, Machinery, Schedule, Cost and Quality to ensure that all key projects performance indicators are adequately prepared. The preparations will ensure that the construction phase of the project is according to FIDIC - Conditions of Contract for Construction (For Building and Engineering Works)
oPreparation and Review of Project Method Statements and methodologies
oPreparation and review of Project Risk Assessment for all project activities with Safety practitioners
oPreparation and Review of critical Lifting Operations, Scaffolding erections, Working at Height operations
oPreparation and review of Project resources and organogram, visa programs, accommodation, shift rosters and duty matrices for key personnel.
oPreparation and review of contractor personnel requirements, sourcing program and setting rate contracts for labour
oPreparation and review of Project tools, equipment and accessories requirement
oPreparation of Rate or Fixed contracts for outsourced equipment and tools
oPreparation and review of materials requirements for the project, procurement, cross border logistics, staging areas, laydown areas according to erection sequences
oPreparation and review of project schedule, budgets, quality control plans
oPreparation and creation of Project zones and access control areas
oConduct project kick-off meetings with client where agreements are reached on meeting schedules, kick off date
oPreparation and review of a labour Safety induction plan for personnel and contractors
oEnsure that amenities are provided being First aid facilities, changing rooms, ablution blocks, smocking areas, eating areas, parking areas, clinic, ambulance, emergency response plans etc.
oSet a project reporting structure for man-hours reporting, time spent on activities, utilization of equipment and delays
oSet up a project reporting structure for safety statistics being: near misses, job observations, loss time injury, property damage, VFL by management etc.
oLegal appointments of personnel on site
After project kick off, roles adapt to cover the areas below
oEnsuring that all personnel on site are inducted according to the project site requirements
oCreation of teams and gangs according to daily tasks, weekly tasks
oTraining and inducting the teams on their relevant works methods and instructions for the specific tasks to workers and other professionals
oEnsure that workers participate in the morning toolbox talk
oEnsure that all Pre-task risk assessments are done before commencement of work
oEnsure that all personnel are appraised of the Inspection, Witness and Hold Points on their tasks through their supervisors
oReview of work progression and setting of daily task performance targets.
oPreparation of daily project status report and updates of project schedule and variance reports
oReport on project non-conformances, variances and action plans to rectify
oReview of punch lists and quality conformance reports
oInventory of all site records being safety registers, toolbox talks, daily diaries, timesheets, safety reports, etc.
oDirect supervision and inspection of work activities
oPreparation of project weekly and monthly reports for the Project Manager
NL Supervision Ibese, Nigeria and Cairo Egypt
Reliability Maintenance Manager March 2014 – April 2015
NL Supervision is a division of FL Smidth set up solely for operations and maintenance management of cement plant for clients. My role was in the planned takeover of the Dangote Cement Plant constructed by Sinoma as a Reliability Maintenance Manager
Duties
Setting up the plant Reliability Maintenance system
Converting the plant maintenance ERP system from SAP to Maximo
Consolidation of Plant Inventory system
Training of employees on the Reliability Maintenance system
Management of the plant Reliability system through inspectors, planners and supervisors
Freda Rebecca Gold Mine Bindura, Zimbabwe
Maintenance Manager March 2013 – February 2014
Freda Rebecca Gold Mine suffered a catastrophic failure of their cyanide laden tanks rendering the plant operable at 50% capacity. I managed the rebuilt the plant after the collapse back to full production.
Review of the key aspects of plant that required to be rebuilt and modified to bring plant back to full capacity
Rebuilt the two 14m diameter leach tanks and modified the arrangement of the wet cyclones
Constructed an additional 14m diameter leach tank
Replaced the girth gear on the Sag mill to restore the critical speed operation requirements of the mill.
Managed the repair of the cracked trunnion
Maintenance Management of the plant maintenance personnel and the underground maintenance personnel
J&C Engineering Johannesburg, South Africa
Contracts and Planning Engineer September 2011 – December 2012
J&C Engineering won a US$12 million tender to rebuild the two electrostatic precipitators at Hwange Power Station in Zimbabwe
Site safety risk assessment preparation with safety personnel
Daily task instruction preparations for teams and gangs
Carrying out quality inspections on the Hold, Witness Inspection plan
Appointments of contractors
Supervision of scaffolding erection for Working at Height activities
Preparation of projects reports for the client
Lafarge Cement Harare, Zimbabwe
Maintenance Manager May 2004 – September 2011
I started off as a Methods Engineer had various roles in Projects Engineer and then finally as the Maintenance Manager.
Maintenance management of the plant that entails kilns, ball mills, crushers, packing machines and various rotating equipment
Installation of electrostatic precipitator in Zambia after an explosion
Development and implementation of the preventive maintenance system
Training of preventive maintenance personnel
Implementation of a Root Cause analysis
Management of shutdowns, projects and personnel development programs.
Had various trainings and secondment to Zambia and the United States of America
Various Companies Harare, Zimbabwe
Various roles May 1998 – May 2024
1.Gold Star Sugars – Sugar Refining plant, Boiler Plant, - 5 Years
a.Arthur Garden Engineering (Division of Gold Star Sugars) – Fabrication, Welding and Installations
2.Zimboard Products – chipboard and Medium Density Fibre board manufacturing – 1 Year
3.Aluminium Metal Industries – Extrusion, Anodizing and Powder Coating - Attachment
Graduate Engineer roles
Plant Engineer Roles
Assistant Mechanical Engineer roles
Project Engineer roles
SKILLS
Ball mill girth gear installation and alignment
Streamlined Reliability Centred Maintenance
Predictive Testing and Inspection
Project Management
Projects Closure
ADAP Downtime Management System
Root Cause Analysis