Post Job Free
Sign in

Building Design Management Services

Location:
Kathmandu, Bagmati Province, Nepal
Posted:
April 30, 2024

Contact this candidate

Resume:

*.Proposed Position

Construction Supervision Expert

2.Name of Firm

Total Management Services Pvt. Ltd. (TMS), Nepal

3.Name of Expert

Pradeep Lal Malla

4.Current Residential Address

Kalanki -14, Kathmandu Municipality

Telephone No.

977-9841343622

Fax No.

N/A.

Email Address

ad5dev@r.postjobfree.com, ad5dev@r.postjobfree.com

5.Date of Birth

January 14, 1961

Citizenship

Nepalese

Type of government ID and ID Number

Citizenship No. 1026/030

6.Education

Degree

M.E. in Disaster Management – June 2018, The Global Open University, Nagaloand, India

B.E. in Civil Engineering in 1989 from Institute of Engineering, Pulchowk Campus, T.U., Nepal

7.Membership in Professional Associations:

-Nepal Engineering Council – (725 Civil ‘A’ Category)

-Member, Nepal Engineers Association (NEA) No.2008

8.Other Trainings:

-Participation in Training in Micro Tunneling conducted by Nepal Engineers Association for 3 weeks, 1992

-Participation in Training Course in "Arc GIS [Arc view8, Arc editor8, & Arc Info8] Conducted by Kathmandu Engineering College, Kalimati, Kathmandu, Nepal for 3 weeks, 2006

-Training on Urban Planning Approach, Organized by ICA Nepal, Kathmandu, 6 weeks, 2001

-Training on Construction Administration and Management from KIIT Institute, Orrisa, India–2 months -2001

9.Countries of Work Experience

Nepal.

10.Languages (Proficiency: Good, Fair, Poor)

Language

Speaking

Reading

Writing

English

Excellent

Excellent

Excellent

Nepali

Excellent

Excellent

Excellent

Hindi

Good

Good

Good

11.Employment Record

From

To

Employer

Position Held

Nov 2021

Till Date

CIS Pvt.Ltd, Patan

Resident Engineer (Expert)

June 2021

Oct 2021

Shrestha Consultant,Ekanta Kuna Specal Economic Zone (SEZ),Dhangadhi Industrial Complex,Kailali

Water supply and Sanitary Engineer (Expert)

December 2020

May 2021

Cage consultant / Soil Test P. Ltd. JV

Water supply and Sanitary Engineer (Expert)

November 2019

November 2020

Building Design Authority Pvt. Ltd, (BDA), Kamaladi

WASH Engineer

May 2019

October 2019

Building Design Authority Pvt. Ltd, (BDA), Kamaladi

Construction Supervision Engineer (CSE)

Nov 2018

April 2019

ERMC (P) Ltd.

Civil and Utility Engineer/ WASH Engineer

April 2018

October 2018

Innovative Createers P. Ltd.

Consultant Engineer

June 2017

March 2018 (10 man month)

ERMC (P) Ltd. Poverty Alleviation Fund (PAF),

Water Supply and Sanitation Engineer

March 2017

15th June 2017 (16 months)

East West Engineering Consultant

District Resident Engineer

December 2013

February 2017

ERMC (P) Ltd

Construction Supervision Engineer/ Water Supply Engineer

April 2012

March 2014 (24 man month)

Kathmandu Medical College (KMC), Building Design Authority Pvt.Ltd, Ghantaghar

Construction Supervision Engineer (CSE)

January 2012

March 2012 (14 man month)

SAARC Secretariat

Construction Supervision Engineer (CSE)

February 2011

December 2011 (11 man month)

Building Design Authority Pvt.Ltd., Ghantaghar

Construction Supervision Engineer (CSE)

May 2010

January 2011 (9 man month)

Building Design Authority Pvt.Ltd., Ghantaghar

Construction Supervision Engineer (CSE)

March 2008

April 2010 (25 man-months)

Building Design Authority Pvt. Ltd,

Construction Supervision Engineer

February 2008

December 2008 (11 man-months)

Indian Embassy

Construction Supervision Engineer (CSE)

December 2006

February 2008 (27 man-month)

We-link Consultant

Construction Engineer

April 2005

November 2006 (7 man-month)

Udaya Consultant

Water Supply Engineer / Construction Supervision Engineer (CSE)

August 2004

April 2005 (8 man months)

Udaya Consultant

Water Supply Engineer

January 2003

October 2003 (8 man months)

Udaya Consultant

Water Supply Engineer/Construction Engineer (CSE)

July 2001

June 2002

Urban Development through Local Effort (UDLE)

Construction Supervision Engineer (CSE)

July 2000

Oct 2003

Mutual Engineering Consultant (P) Ltd.

Water Supply Engineer / Construction Engineer

12.Detailed Tasks Assigned:

-As Per ToR.

13.Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned:

1.Name of assignment or project

Nepal Bharat Maitri Polytechnic Institute, Hetauda-6

Month & Year

Nov 2021 to Till Date

Location

Hetauda-6

Client

Nepal Bharat Maitri Polytechnic Institute, Hetauda-6

Position Held

Resident Engineer (Expert)

Main project features: Survey, Design and Construction supervision, monitoring, Quality control

Activities Performed: Construction supervision of entire project (370 Ropani, 27 no. of blocks, road) ; Survey, Design and Construction supervision, monitoring, Quality control, Progress review, conducting monthly meeting, weekly meeting, daily report, weekly report, environment report, safety report, schedule track submittal, billing of IPC Payment, request for inspection.

2.Name of assignment or project

Kailali industrial complex

Month & Year

June 2021 to Oct 2021

Location

Kailali

Client

Dhangadhi Industrial Complex,Kailali

Position Held

Water supply and Sanitary Engineer (Expert)

Main project features: Survey and design of storm drain, sewerage drain, perforated pipe drain, water supply system

Activities Performed: Survey and design of storm drain, sewerage drain, perforated pipe drain, water supply system, water proofing in underground basement and management of all storm water and sewerage system of Kailali industrial complex premises

3.Name of assignment or project

Dharahara Reconstruction Project, Nepal Reconstruction Authority, Sundhara

Month & Year

December 2020 to May 2021

Location

Sundhara, Nepal

Client

Nepal Reconstruction Authority

Position Held

Water supply and Sanitary Engineer (Expert)

Main project features: Survey and design of storm drain, sewerage drain, perforated pipe drain, water supply system

Activities Performed: Survey and design of storm drain, sewerage drain, perforated pipe drain, water supply system, water proofing in underground basement and management of all storm water and sewerage system of new Dharahara complex premises.

4.Name of assignment or project

Construction supervision for Charikot, 2nd Water Supply and Sanitation Fund Development Project, Charikot. Dolakha district.

Month & Year

November 2019 to November 2020

Location

Dolakha, district

Client

World Bank/DWSS

Position Held

Construction Supervision Engineer (CSE)

Main project features: As per technical design drawing, tender documents and technical specifications construction supervision & quality control works for water supply project.

Activities Performed: Major responsible for construction supervision of works consisting, data verification, survey and monitoring of water supply scheme, MIS data verification, preparation of social map and lay out map, sustainability survey, meeting with WSUC and municipality member, preparation of business plan, back stopping and SOP, preparation of monthly report, weekly report etc.

5.Name of assignment or project

Chainpur Small Town Water Supply & Sanitation Sector Project

Month & Year

May 2019 to October 2019 (6 man month)

Location

Chaunpur, Bajhang district

Client

DWSS/ADB

Position Held

Construction Supervision Engineer (CSE)

Main project features: Detailed engineering design and construction supervision of water supply project

Activities Performed: Construction of works consisting: Development of motor able tracks (road for construction) to the intakes area and treatment plan. Re-instate of the concrete and gravel road and re-sealing of the track topped road. Construction of collection sump well. Construction of retaining wall, thrust blocks and concrete saddles for pipe mains; Construction of water treatment plants which include Roughening Filters and Slow Sand filter. Construction of Water Storage Tanks, Break Pressure Tanks. Construction of Valve Chamber, Surface Valves, Boundary Wall, Fencing, Guard Quarters and other buildings. Supply and laying of DI, GI and PE pipes and fittings for proposed transmission and distribution lines. Supply and erection of LT electrical transmission lines and other electrical. Supply and installation of Fire hydrant and house connections. Demolishing of redundant structures. Design, supply, Installation, testing, commissioning and maintenance of Automation System of Chainpur Town Water Supply System based on SCADA software comprises of three Transmission lines, three reservoir (DMA) systems and two numbers of WTPs including instrumentation control valve, bulk water meter, pressure level transducer, etc. and comprehensive operation and maintenance for one year.

6.Name of assignment or project

Gautam Buddha International Airport Project

Month & Year

November 2018 to April 2019 (6 man month)

Location

Bhairahawa Airport-4, Rupandehi District

Client

CAAN/ADB

Position Held

Civil and Utility Engineer/WASH Engineer

Main project features: Detailed engineering design and construction supervision.

Activities Performed: Survey, design and construction supervision of toilet and Bath room in Arrival, Departure section, control tower, Admin. Section, Fire Rescue section, Septik tank, and soak pit, laying of soil pipe, laying of sewer pipe, laying of water pipe, laying of rain water pipe, fitting of commode and urine set, laying of sewer outlet chamber, water outlet chamber, Rain outlet chamber, 450 cum and 200cum Over Head Tank, 100mm dia. distribution DI Pipe laying, Slow sand filter, pressure filter, Under Ground Tank, construction of pump house 4nos.,Dis-infection unit, 3km. 600mm/700mm sewer hume-pipe laying, construction of Manhole, sewer treatment plant by pumping system of 5nos., mixing of sewage to Ghagra river by primary treatment.

7.Name of assignment or project

Construction supervision of Kanya Mandir Secondary School, Nhyokha, Kathmandu

Month & Year

April 2018 to October, 2018 (7 months)

Location

Kathmandu

Client

Kanya Mandir Secondary School

Position Held

Consultant Engineer

Main project features: As per technical design drawing, tender documents and technical specifications Construction supervision & quality control works.

Activities Performed: Survey, design and construction supervision, monitoring, quality control, progress review, conducting monthly meeting, weekly meeting, daily report, weekly report, environment report, safety report, schedule track submittal, request for inspection, excavation of 15m. depth pile by auger mud pump boring and stone compaction 2m.c/c distance.

8.Name of assignment or project

Rural Water Supply and Sanitation Fund Development Board (RWSSFDB)

Month & Year

June 2017 to March 2018 (10 man month)

Location

Bajhang, Mugu, Bajura, Achham, Humla, Dadeldhura, Doti, Jajarkot, Kapilvastu, Baitadi, Kanchanmpur, Kailali, Darchula, Bara, Gorkha, Myagdi, Parbat, Salyan, Dang, Rolpa, Bajura, Dailekh, Districts

Client

WB/RWSSFDB

Position Held

Water Supply and Sanitation Engineer

Main project features: As per technical design drawing, tender documents and technical specifications construction supervision & quality control works.

Activities Performed: Survey, design and construction supervision, monitoring, quality control, progress review, design review, verification of intake, transmission line, anchor block, air valve, Inception tank, Break pressure tank, water quality test, measurement of alignment of transmission line and distribution line checking of different loss between intake to reservoir pipe line quality and quantity of used material.

9.Name of assignment or project

Construction supervision of School Building

Month & Year

March 2017 to 15th June 2017 (16 months)

Location

Gorkha

Client

EEAP/ADB

Position Held

District Resident Engineer

Main project features: As per technical design drawing, tender documents and technical specifications construction supervision & quality control works.

Activities Performed: Survey, Design and Construction supervision, monitoring, Quality control, Progress review, conducting monthly meeting, weekly meeting, Co-ordination with DLPIU, Overall responsibility of 28 nos. of school building and 6nos. of package with 28no. of school. Gorkha district, JICA Project. Monthly Progress Report, Monthly meeting. Over all responsibility of all district wise responsibilities.

10.Name of assignment or project

Second Small Town Water Supply and Sanitation Project, Baitadi financed by ADB

Month & Year

December 2013 to February 2017

Location

Baitadi, Nepal

Client

STWSSSP/ADB Loan 1755-NEP (SF)

Position Held

Construction Supervision Engineer (CSE)

Main project features: As per technical design drawing, tender documents and technical specifications construction supervision & quality control works, water supply project.

Activities Performed: Responsible for supervision of construction; Carry out joint survey, check line and level, layout of construction & verify and propose if any changes required as per project requirements. Implementation of guidelines given in contract administration manuals; Implementation of QA/QC manual to confirm works as per Quality Assurance Plan (QAP); Overall construction supervision, measurement of completed works to verify the bills for payments; Assess and enforce, as per standard Construction Management System, the adequacy of contractors' inputs in terms of material, equipment’s, construction machinery, workers, and construction approach and methodologies; Monitor & enforce contracts to take safety measure for the works, workers & general public as per safety manual; Furnish detailed drawings, with revisions as necessary, to the contractor, check contractors' design and drawings for lump sum turnkey contracts (Design/Build contracts); Review and examine the process of passing of contractors' bills and payments to contractors with special emphasis on minimizing the time taken in submission of a bill by the contractor and payment received by the contractor against such a bill; Attend third party inspections as necessary and provide certification on the quality of the supplies based on such inspections; Work as the engineer or employer's representative within the context of conditions of the construction contracts; Regularly monitor physical and financial progress against the milestones as per the contract so as to ensure completion of contract in time; Monitor and enforce, as detailed out in Quality Assurance and Quality Control (QA & QC) Manual, the quality of inputs, processes, and outputs during all activities of construction to ensure the highest quality of works conforming to the specifications and drawings Total Project Cost (approx): NRs. 30 Million.

11.Name of assignment or project

Construction of Kathmandu Medical College (KMC) at Duwakot, Bhaktapur

Month & Year

April 2012 to March 2014 (24 man month)

Location

Bhaktapur

Client

KMC

Position Held

Construction Supervision Engineer (CSE)

Main project features: 8 storied building domestic water supply, treatment unit, electrical & AC works.

Activities Performed: Construction supervision of project, review quality assurance plan and quality control plan (QA QP) supervise and monitor construction, review contractors bill, monitor and enforce safety manual, monitor physical & financial progress, examine contractor's claim, check installations and commissioning, monitoring preparation of as built drawings for water supply, sewerage, treatment plant and other civil components. The project was implemented and managed under ICB contracts; Total Project Cost: NRs. 8.2 Million.

12.Name of assignment or project

Construction of SAARC Secretariat

Month & Year

January 2012 to March 2012 (14 man month)

Location

Kathmandu

Client

SAARC Secretariat

Position Held

Construction Supervision Engineer (CSE)

Main project features: 6 storied building domestic water supply, treatment unit, electrical & AC works

Activities Performed: Construction Supervision of project, review quality assurance plan and quality control plan (QA QP) supervise and monitor construction, review contractors bill, monitor and enforce safety manual, monitor physical & financial progress, examine contractor's claim, check installations and commissioning, monitoring preparation of as built drawings; Total Project Cost: NRs. 41.61 Million.

13.Name of assignment or project

i) Waste Water Treatment Plant at Sallaghari & Kodku, (KUKL/DNI/-02/-13A) ii) Construction of Laboratory Building at Mahankalchaur, Kathmandu (KUKL/DNI/-02/10)

Month & Year

February 2011 to December 2011 (11 man month)

Location

Kathmandu, Lalitpur, Bhaktapur

Client

PID/KUKL/GoN

Position Held

Construction Supervision Engineer (CSE)

Main project features: i) Cleaning of existing waste water treatment plants, boundary fencing, retaining walls, lining works, gabion works etc ii) 2 storied laboratory building for testing of water quality.

Kodku Capacity (Million liter/day) - 25.192

Sallaghari Capacity (Million liter/day) – 7.284

Activities Performed: Construction Supervision of project, review quality assurance plan and quality control plan (QA QP) supervise and monitor construction, review contractors bill, monitor and enforce safety manual, monitor physical & financial progress, examine contractor's claim, check installations and commissioning, monitoring preparation of as built drawings. The project was implemented and managed under ICB contracts; Total Project Cost: i) Rs 24.20 million ii) Rs 20.8 million.

14.Name of assignment or project

Water Supply Tubewell Boring and Installations at 5 Places of Kathmandu Valley (KUKL/DNI/-02/03) Financed by ADB

Month & Year

May 2010 to January 2011 (9 man month)

Location

Kathmandu, Lalitpur, Bhaktapur

Client

KUKL/GoN

Position Held

Construction Supervision Engineer (CSE)

Main project features: As per technical design drawing, tender documents and technical specifications Construction supervision & quality control works, 250 /200 mm tubewell (150 to 200m deep), pump installations, discharge of 21-25 lps etc.

Activities Performed: Construction Supervision of project, review quality assurance plan and quality control plan (QA QP) supervise and monitor construction, review contractors bill, monitor and enforce safety manual, monitor physical & financial progress, examine contractor's claim, check installations and commissioning, monitoring preparation of as built drawings. The project was implemented and managed under ICB contracts; Total Project Cost: Rs 41.50 million.

15.Name of assignment or project

Feasibility study and detail engineering design & construction supervision of Urban Environmental Improvement Project Finance by ADB Loan No 1966-NEP (SF)

Month & Year

March 2009 to April 2011 (25 man-months)

Location

Hetauda Municipality

Client

DUDBC, UEIP, PIU Hetauda

Position Held

Construction Supervision Engineer (CSE)

Main project features:

1)Water Supply Sub-project (ICB-Contract): Detail engineering design and construction supervision of gravity flow water supply system / 3 nos. of overhead water tank, two nos. of ground water tank, 2 nos. of water treatment plant, stream intake, 2 nos. of deep boring, 75 km of distribution pipe line with DI, HDPE and GI of varying sizes of 300 mm to 40mm, financial and economic analysis etc. The total sub-project cost is Rs. 192,433,634.94; Main Town Scheme (This scheme serves ward no. 1, 2, 3, 4, 5 and 10): The sub-project includes the rehabilitation and extension of the existing water supply schemes to improve the overall water supply situation of the Hetauda Municipality. The scheme comprises detailed engineering survey, design and construction supervision of infiltration gallery, 500 m3 capacities ground tank, water treatment plant, transmission main, distribution pipe etc.

2)Sanitation & Sewerage Sub-project: It involves detail survey, design and construction supervision of three nos. of combined sewerage system, there are three schemes name as Rapti-1, Rapti-2 and Karra system of 13km length with 1500mm to 300 mm dia. RCC hume pipe with Waste Water (reed bed) treatment plants each on the banks or Rapti and Karra rivers serves wards 1, 2, 4, 5 and 10 of Hetauda Municipality. The sub-project includes construction of 3 nos. of sewerage system. The total sub-project cost is Rs. 145,080,402.83

3)Supply of Sewer Cleaning Equipment Sub-project: There are sewer cleanings equipment like jetting machine, suctions machine, di-silting machine, 2 nos. of tripper, one no. of tractor etc. The total sub-project cost is 17,495,878.14

4)Waste Water (Reed Bed) Treatment Plant Sub-project: It involves detail survey, design and construction supervision of three scheme of Waste Water (Reed Bed) Treatment Plant sub-project name as Rapti-1, Rapti-2 and Karra system. The total sub-project cost is Rs. 42,124,197.65

5)River Training Works Sub-project (Rapti and Karra River Bank Protection Work): It involves detail survey, design and construction supervision of river embankments to protect against flood, erosion, from Rapti & Karra rivers in wards 1, 11 & 4 respectively. The total project cost is 9,168,350.37

Activities Performed: Construction Supervision of project, review quality assurance plan and quality control plan (QA QP) supervise and monitor construction, review contractors bill, monitor and enforce safety manual, monitor physical & financial progress, examine contractor's claim, check installations and commissioning, monitoring preparation of as built drawings. The project was implemented and managed under ICB contracts; Total Project Cost: NRs. 459 Million. Water Supply NRs. 192.433 Million, Sewerage-NRs 145.08 Million, RBTP 42.124 Million, Supply of Sewerage cleaning equipment NRs.17.49 Million.

16.Name of assignment or project

Indian Embassy Construction and Renovation Project

Month & Year

February 2008 to December 2009 (11 man-months)

Location

Kathmandu Metropolitan City, Lainchour

Client

Indian Embassy

Position Held

Construction Supervision Engineer (CSE)

Main project features: 3 kms Long PCC pavement, Waste water treatment unit-1 #, Compound wall, landscaping, etc.

Activities Performed: Construction Supervision of project, review quality assurance plan and quality control plan (QA QP) supervise and monitor construction, review contractors bill, monitor and enforce safety manual, monitor physical & financial progress, examine contractor's claim, check installations and commissioning, monitoring preparation of as built drawings. The project was implemented and managed under ICB contracts; Project Cost: NRs 40 million.

17.Name of assignment or project

Bheri Zonal Hospital Rehabilitation and Extension Project (GTZ/KFW funding)

Month & Year

December 2006 to February 2008 (27 man-month)

Location

Nepalgunj Municipality

Client

GTZ/KFW funding

Position Held

Construction Engineer

Main project features: Compound wall, construction of 1st floor of hospital building, water supply networks, and electrification works.

Activities Performed: Construction Supervision of project, review quality assurance plan and quality control plan (QA QP) supervise and monitor construction, review contractors bill, monitor and enforce safety manual, monitor physical & financial progress, examine contractor's claim, check installations and commissioning, monitoring preparation of as built drawings of Hospital building sewerage and water supply works. The project was implemented and managed under ICB contracts; Project Cost: NRs. 42.5 million.

18.Name of assignment or project

Gurung Gaun Water Supply Project

Month & Year

April 2005 to November 2006 (7 man-month)

Location

Gulmi District

Client

DWSS/ADB

Position Held

Water Supply Engineer / Construction Supervision Engineer (CSE)

Main project features: Detail design and survey

Activities Performed: Detail design and survey of source selection and construction supervision Intake structure, collection chamber, washout valve chamber, air relief valves, reservoir tank, ferro-cement tank, transmission pipe lines, distribution pipe lines alignment, school toilets, community toilets in Gulmi District; Project Cost: NRs.6.0 million.

19.Name of assignment or project

Magar Gaun Water Supply Project (ADB funded)

Month & Year

August 2004 to April 2005 (8 man months)

Location

Arghakhanchi District

Client

DWSS/ADB

Position Held

Water Supply Engineer

Main project features: Detail design and survey

Activities Performed: Detail design and survey of source selection and construction supervision Intake structure, collection chamber, washout valve chamber, air relief valves, reservoir tank, ferro-cement tank, transmission pipe lines, distribution pipe lines alignment, school toilets, community toilets in Arghakhanchi District; Project Cost: NRs.6.0 million.

20.Name of assignment or project

Gumba Village Water Supply Project (ADB funded)

Month & Year

January 2003 to October 2003 (8 man months)

Location

Palpa District

Client

DWSS/ADB

Position Held

Water Supply Engineer/Construction Engineer (CSE)

Main project features: Detail design and survey

Activities Performed: Detail design and survey of source selection and construction supervision Intake structure, collection chamber, washout valve chamber, air relief valves, reservoir tank, ferro-cement tank, transmission pipe lines, distribution pipe lines alignment, school toilets, community toilets in Palpa District; Project Cost: NRs.7.0 million.

21.Name of assignment or project

Arughat Bazar (Small Town) Water Supply Project

Month & Year

January 2003 to October 2003 (10 Months)

Location

Gorkha District

Client

DWSS/ADB

Position Held

Water Supply Engineer/Construction Engineer

Main project features: Detail design and survey

Activities Performed: Detail design and survey of source selection and construction supervision Intake structure, collection chamber, washout valve chamber, air relief valves, reservoir tank, ferro-cement tank, transmission pipe lines, distribution pipe lines alignment, school toilets, community toilets in Arughat, including sanitation facilities within the project area; Project Cost: NRs. 6.0 millions.

22.Name of assignment or project

Urban Sewerage and Infrastructure Project with Heritage Construction Area National Heritage Conservation Project (UDLE/GTZ funded)

Month & Year

July 2001 to June 2002 (12 man month)

Location

Madhyapur Thimi Nagadesh Municipality, Bhaktapur and Patan Municipality, Lalitpur

Client

UDLE/GTZ

Position Held

Construction Supervision Engineer (CSE)

Main project features: Construction supervision

Activities Performed: Construction supervision of renovation work of monument, temple, community buildings, toilet blocks, stone pavement, drainage and sewerage system including construction supervision of waste water treatment plant and Pipe laying works at the Archeological Heritage site in urban places of Madhyapur Thimi Nagadesh Municipality, Bhaktapur and Patan Municipality, Lalitpur. The project was implemented and managed under ICB contracts; Project Cost: NRs. 10.0 millions.

23.Name of assignment or project

Upper Tamakoshi Hydro-electric Access Road (35KM),

Month & Year

July 2000 to July 2001 (13 man month)

Location

Dolakha

Client

NEA/Upper Tamakoshi Hydro-electric Project

Position Held

Construction Supervision Engineer (CSE)

Main project features: Construction supervision

Activities Performed: Construction supervision of project, review quality assurance plan and quality control plan (QA QP) supervise and monitor construction, review contractors bill (IPC), monitor and enforce safety manual, monitor physical & financial progress, examine contractor's claim, check installations and commissioning, monitoring preparation of as built drawings. The project was implemented and managed under ICB contracts; Project Cost: NRs. 10 millions.

14.Certification:

I, the undersigned, certify to the best of my knowledge and belief that

(i)This CV correctly describes my qualifications and experience;

(ii)I am not a current employee of the Executing or the Implementing Agency;

(iii)In the absence of medical incapacity, I will undertake this assignment for the duration and in terms of the inputs specified for me in Form TECH-6 provided team mobilization takes place within the validity of this proposal;

(iv)I was not part of the team who wrote the terms of reference for this consulting services assignment;

(v)I do not have conflict of interest in accordance with ITC 3.0;

(vi)I am not subject to any national or international sanctions, temporary suspension or debarment by ADB or other multilateral development banks (MDB);

(vii)I certify that I have been informed by the firm that it is including my CV in the Proposal for the Design, Supervision and Contract Management Consulting Services (DSC/WW/03) for Kathmandu Valley Wastewater Management Project. I confirm that I will be available to carry out the assignment for which my CV has been submitted in accordance with the implementation arrangements and schedule set out in the Proposal.

(viii)I have not been found guilty or convicted of any violation of law that is not a minor traffic violation.

(ix)I can accept payments through the international banking system or otherwise discharge ADB’s obligation upon initiation of wire transfer.

(x)I understand that it is my obligation to notify the Client and ADB should I become subject to any national or international sanction, including becoming ineligible to work with ADB or other MDBs, cannot accept payments through the international banking system, should integrity issues including conflict of interest arise and/or should we or the proposed consultant be convicted of an offence excluding minor traffic violations.

If the CV is signed by the firm’s authorized representative:

(xi)I, as the authorized representative of the firm submitting this Proposal for the Design, Supervision and Contract Management Consulting Services (DSC/WW/03)



Contact this candidate